JEF-SR 213-18.09
JEF County · est $0.9M
Bid dateThursday, November 13—
JEF County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Buds INC | R2Alan Stone CO INC | R3Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|
| 862E00601 SLOPE DRAPE, AS PER PLAN | 1,594 SY | $180 | $205 | $235 | 34% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100,000 | $120,000 | $119,000 | 12% |
| 624E10000 MOBILIZATION | 1 LS | $90,000 | $57,500 | $40,000 | 11% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 180 FT | $400 | $470 | $333 | 9% |
| 862E00700 TRIM BLASTING | 500 SF | $120 | $180 | $200 | 7% |
| 862E00500 SCALING | 60 HOUR | $600 | $830 | $1,100 | 4% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $15,000 | $2,500 | $20,000 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $28,000 | $15,000 | $20,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $105,000 | $40,000 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $13,000 | $40,000 | 2% |
| 862E00610 EXCAVATION | 444 CY | $40.00 | $75.00 | $125 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 22 CY | $630 | $570 | $600 | 2% |
| 304E20000 AGGREGATE BASE | 61 CY | $200 | $180 | $150 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 340 FT | $30.00 | $40.00 | $45.00 | 1% |
| 622E10201 BARRIER TRANSITION, AS PER PLAN | 2 EACH | $5,000 | $9,600 | $9,000 | 1% |
| 622E25001 CONCRETE BARRIER END SECTION, TYPE D, AS PER PLAN | 2 EACH | $5,000 | $15,000 | $6,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 260 SY | $25.00 | $6.00 | $10.00 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 2 EACH | $2,900 | $3,500 | $2,500 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,700 | $3,600 | $2,200 | 1% |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 280 FT | $18.00 | $30.00 | $25.00 | 1% |
| Item | Quantity | R1Buds INC | R2Alan Stone CO INC | R3Craig Edward Susany INC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 143 SY | $35.00 | $45.00 | $50.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 26 FT | $25.00 | $8.00 | $50.00 |
| 202E38000 GUARDRAIL REMOVED | 140 FT | $5.00 | $3.00 | $5.00 |
| 203E10000 EXCAVATION | 49 CY | $65.00 | $50.00 | $125 |
| 203E20000 EMBANKMENT | 63 CY | $65.00 | $45.00 | $125 |
| 204E10000 SUBGRADE COMPACTION | 329 SY | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $6.50 |
| $3.00 |
| 208E10000 PRE-BLAST CONDITION SURVEY | 1 LS | $5,000 | $14,000 | $10,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 137.5 FT | $35.00 | $40.00 | $45.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $190 | $10.00 |
| 659E00300 TOPSOIL | 29 CY | $20.00 | $190 | $125 |
| 659E14000 REPAIR SEEDING AND MULCHING | 13 SY | $0.10 | $3.00 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $1,300 | $710 | $1,000 |
| 659E31000 LIME | 0.05 ACRE | $150 | $1,000 | $600 |
| 659E35000 WATER | 5 MGAL | $1.00 | $130 | $1.00 |
| 671E15060 EROSION CONTROL MAT, TYPE G | 434 SY | $5.00 | $60.00 | $100 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 18 GAL | $4.00 | $5.00 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 44 GAL | $30.00 | $5.00 | $72.00 |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 4 CY | $1,000 | $1,800 | $2,100 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (5 CY | $800 | $1,500 | $1,200 |
| 609E24510 CURB, TYPE 4-C | 38 FT | $126 | $70.00 | $100 |
| 621E00100 RPM | 8 EACH | $400 | $510 | $400 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $10.00 | $15.00 | $25.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 5 EACH | $10.00 | $15.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $13.00 | $20.00 | $12.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 69 FT | $25.00 | $25.00 | $14.00 |
| 630E08600 SIGN POST REFLECTOR | 11 EACH | $55.00 | $55.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 11 EACH | $160 | $85.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $30.00 | $20.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.1 MILE | $20.00 | $31,000 | $45,000 |
| 646E10200 CENTER LINE | 0.05 MILE | $15,000 | $49,000 | $60,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $85.00 | $110 | $125 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $3,800 | $3,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $180 | $480 | $1,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $15.00 | $60.00 | $40.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 4 EACH | $15.00 | $65.00 | $60.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 12 EACH | $20.00 | $50.00 | $40.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.18 MILE | $6,000 | $4,700 | $4,500 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.18 MILE | $15,000 | $18,000 | $16,000 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.22 MILE | $5,000 | $3,800 | $4,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.22 MILE | $9,000 | $13,000 | $11,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 22 FT | $20.00 | $15.00 | $15.00 |
| 616E10000 WATER | 25 MGAL | $0.50 | $0.10 | $1.00 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $250 | $1,500 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 862E00601 SLOPE DRAPE, AS PER PLAN | 1,594 SY | $180 | $287k | 31% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100,000 | $100k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $90,000 | $90k | 10% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 180 FT | $400 | $72k | 8% |
| 862E00700 TRIM BLASTING | 500 SF | $120 | $60k | 7% |
| 862E00500 SCALING | 60 HOUR | $600 | $36k | 4% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $15,000 | $30k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $28,000 | $28k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $20k | 2% |