MAH-Afton Ave (SRTS)
MAH County · est $0.3M
Bid dateThursday, November 13—
MAH County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
| Item | Quantity | R1Foust Construction INC | R2Daniel A Terreri & Sons INC | R3Parella-pannunzio INC | R4Stanley Miller Construction Company | R5S.t.a.r.t., LLC | R6Tri-mor CORP | % of bid |
|---|---|---|---|---|---|---|---|---|
| 608E10000 4" CONCRETE WALK | 6,398 SF | $8.50 | $8.00 | $9.50 | $9.35 | $8.50 | $12.00 | 23% |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 651 SY | $65.00 | $100 | $92.00 | $101 | $93.41 | $100 | 18% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $22,593 | $13,000 | $32,500 |
| Item | Quantity | R1Foust Construction INC | R2Daniel A Terreri & Sons INC | R3Parella-pannunzio INC | R4Stanley Miller Construction Company | R5S.t.a.r.t., LLC | R6Tri-mor CORP |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $10,000 | $12,000 | $6,000 | $13,000 | $15,000 |
| 202E30000 WALK REMOVED | 80 SF | $10.00 | $5.00 | $10.00 | $5.00 | $19.74 | $5.00 |
| 202E32000 CURB REMOVED | 36 FT | $20.00 | $20.00 | $50.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $26,038 |
| $11,400 |
| 11% |
| 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL | 2 EACH | $8,910 | $9,000 | $9,000 | $11,500 | $8,985 | $12,500 | 8% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 651 SY | $20.00 | $18.00 | $20.00 | $21.00 | $58.56 | $26.00 | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,135 | $9,000 | $6,500 | $18,250 | $10,800 | $10,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10,000 | $35,000 | $12,500 | $34,600 | $15,000 | 4% |
| 203E10000 EXCAVATION | 172 CY | $50.00 | $50.00 | $190 | $88.00 | $44.80 | $30.00 | 4% |
| 659E00300 TOPSOIL | 154 CY | $55.00 | $80.00 | $50.00 | $62.50 | $91.87 | $95.00 | 4% |
| 832E30000 EROSION CONTROL | 7,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 608E52000 CURB RAMP | 331 SF | $20.00 | $20.00 | $24.00 | $23.00 | $30.94 | $25.00 | 3% |
| 611E99900 DRAINAGE STRUCTURE, MISC.: SIDEWALK TRENCH | 5 EACH | $1,200 | $800 | $1,600 | $500 | $1,501 | $3,850 | 3% |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $5,000 | $1,000 | $3,000 | $4,000 | $2,500 | $3,900 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,380 SY | $3.00 | $5.00 | $5.00 | $5.00 | $3.51 | $7.00 | 2% |
| 623E39600 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE | 2 EACH | $2,000 | $400 | $1,200 | $1,000 | $748 | $1,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $6,500 | $5,000 | $13,000 | $5,000 | $3,500 | 2% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 995 FT | $3.00 | $3.00 | $7.00 | $4.00 | $4.62 | $3.00 | 1% |
| 644E00620 CROSSWALK LINE, 12" | 128 FT | $21.45 | $25.00 | $21.45 | $50.00 | $21.45 | $20.00 | 1% |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $2,000 | $2,000 | $500 | $4,000 | $1,200 | $15,000 | 1% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 75 FT | $16.00 | $17.00 | $16.00 | $27.00 | $16.00 | $12.00 | 1% |
| $29.97 |
| $20.00 |
| 203E20000 EMBANKMENT | 14 CY | $50.00 | $100 | $100 | $97.00 | $74.07 | $40.00 |
| 204E10000 SUBGRADE COMPACTION | 651 SY | $1.00 | $2.00 | $3.00 | $2.00 | $4.18 | $1.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $200 | $200 | $150 | $84.14 | $400 |
| 659E20000 COMMERCIAL FERTILIZER | 0.2 TON | $400 | $1,000 | $200 | $800 | $1,249 | $4,000 |
| 659E31000 LIME | 0.3 ACRE | $300 | $1,000 | $200 | $100 | $870 | $1,200 |
| 659E35000 WATER | 18 MGAL | $2.00 | $50.00 | $1.00 | $1.00 | $0.56 | $100 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $150 | $200 | $400 | $300 | $562 | $400 |
| 630E80100 SIGN, FLAT SHEET | 39 SF | $25.00 | $25.00 | $25.00 | $77.00 | $25.00 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $36.00 | $36.00 | $36.00 | $40.00 | $36.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $95.00 | $100 | $95.00 | $110 | $95.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $60.00 | $60.00 | $60.00 | $70.00 | $60.00 | $50.00 |
| 644E00500 STOP LINE | 12 FT | $33.25 | $35.00 | $33.25 | $90.00 | $33.25 | $20.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E10000 4" CONCRETE WALK | 6,398 SF | $8.5 | $54k | 22% |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 651 SY | $65 | $42k | 17% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 10% |
| 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL | 2 EACH | $8,910 | $18k | 7% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 651 SY | $20 | $13k | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,135 | $11k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10k | 4% |
| 203E10000 EXCAVATION | 172 CY | $50 | $9k | 4% |
| 659E00300 TOPSOIL | 154 CY | $55 | $8k | 3% |
| 832E30000 EROSION CONTROL | 7,000 EACH | $1 | $7k | 3% |