| Item | Quantity | R1John R Jurgensen Company | R2Fillmore Construction | R3R B Jergens Contractors INC | R4Complete General Construction Company | R5Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 974 CY | $240 | $240 | $263 | $201 | $215 | 14% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 2,813 SY | $80.00 | $85.00 | $96.40 | $65.00 | $55.00 | 13% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 8,767 SY | $16.30 | $10.00 | $20.67 | $27.00 | $16.00 | 8% |
| 304E20000 AGGREGATE BASE | 1,118 CY | $111 | $80.00 | $59.39 | $90.00 | $125 | 7% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 250 CY | $450 | $260 | $493 | $277 | $280 | 7% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1John R Jurgensen Company | R2Fillmore Construction | R3R B Jergens Contractors INC | R4Complete General Construction Company | R5Axis Civil Construction LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,577 | $10,000 | $10,315 | $13,000 | $20,000 |
| 202E23000 PAVEMENT REMOVED | 445 SY | $14.00 | $8.00 | $17.49 | $15.00 | $20.00 |
| 202E30600 CONCRETE MEDIAN REMOVED | 20 SY | $33.41 | $25.00 | $65.14 | $60.00 | $50.00 |
| 202E32000 CURB REMOVED | 560 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $100,000 |
| $125,000 |
| $100,000 |
| $100,000 |
| $100,000 |
| 6% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 291 CY | $318 | $280 | $349 | $274 | $274 | 5% |
| 609E71000 CONCRETE MEDIAN | 5,386 SF | $16.05 | $15.00 | $11.54 | $14.00 | $17.00 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 4,260 FT | $18.25 | $20.00 | $18.44 | $18.00 | $29.00 | 5% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,786 FT | $37.78 | $12.00 | $19.85 | $20.00 | $20.00 | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $67,041 | $5,000 | $50,102 | $42,500 | $65,000 | 4% |
| 203E20000 EMBANKMENT | 2,543 CY | $26.35 | $50.00 | $21.32 | $7.00 | $36.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,798 | $175,000 | $92,000 | $125,000 | $100,000 | 3% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 1,017 FT | $45.97 | $40.00 | $32.83 | $37.00 | $39.00 | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 400 CY | $111 | $100 | $55.35 | $60.00 | $125 | 3% |
| 452E11020 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P W | 358 SY | $114 | $103 | $132 | $105 | $175 | 2% |
| 832E30000 EROSION CONTROL | 40,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B40 | 10 EACH | $3,973 | $4,108 | $4,069 | $3,000 | $4,000 | 2% |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 531 FT | $56.17 | $20.00 | $25.08 | $21.00 | $25.00 | 2% |
| 659E00300 TOPSOIL | 662 CY | $43.13 | $50.00 | $30.21 | $65.00 | $48.00 | 2% |
| $11.39 |
| $10.00 |
| $8.09 |
| $10.00 |
| $16.00 |
| 202E98100 REMOVAL MISC.: (WOOD POST) | 5 EACH | $273 | $100 | $127 | $80.00 | $150 |
| 203E10000 EXCAVATION | 868 CY | $20.15 | $30.00 | $17.89 | $35.00 | $30.00 |
| 203E20001 EMBANKMENT, AS PER PLAN, NO. 2 AGGREGATE | 58 CY | $95.21 | $200 | $66.35 | $250 | $140 |
| 204E10000 SUBGRADE COMPACTION | 6,708 SY | $2.14 | $5.00 | $3.88 | $4.50 | $3.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 400 CY | $50.11 | $30.00 | $27.37 | $35.00 | $30.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $252 | $150 | $321 | $300 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 1,547 SY | $3.17 | $3.00 | $3.73 | $3.00 | $3.00 |
| 608E53020 DETECTABLE WARNING | 96 SF | $50.00 | $30.00 | $356 | $40.00 | $50.00 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $15,730 | $10,000 | $33,517 | $27,500 | $22,000 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 73 SY | $189 | $30.00 | $102 | $120 | $110 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $150 | $500 | $76.80 | $75.00 | $150 |
| 659E10000 SEEDING AND MULCHING | 5,108 SY | $1.35 | $1.25 | $1.95 | $1.90 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 256 SY | $1.35 | $2.20 | $1.95 | $1.90 | $1.00 |
| 659E15000 INTER-SEEDING | 256 SY | $1.00 | $2.20 | $1.95 | $1.90 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.69 TON | $925 | $1,400 | $778 | $760 | $1,250 |
| 659E31000 LIME | 1.06 ACRE | $100 | $450 | $51.20 | $50.00 | $150 |
| 659E35000 WATER | 28 MGAL | $1.00 | $100 | $51.20 | $50.00 | $1.00 |
| 659E40000 MOWING | 2 MSF | $200 | $1,000 | $184 | $180 | $100 |
| 670E00500 SLOPE EROSION PROTECTION | 842 SY | $3.20 | $2.00 | $4.46 | $4.35 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $3,500 | $2,458 | $2,500 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,880 | $5,000 | $8,602 | $10,000 | $7,350 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,934 | $10,000 | $10,240 | $10,000 | $10,000 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $89.38 | $50.00 | $33.53 | $22.00 | $25.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 10 EACH | $750 | $500 | $1,103 | $250 | $500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 1,818 SY | $5.15 | $5.00 | $5.64 | $7.85 | $8.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,287 GAL | $5.00 | $5.00 | $5.48 | $4.10 | $4.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $2,000 | $500 | $2,192 | $525 | $1,500 |
| 609E24510 CURB, TYPE 4-C | 558 FT | $35.29 | $30.00 | $20.76 | $45.00 | $39.00 |
| 609E26000 CURB, TYPE 6 | 484 FT | $38.36 | $32.00 | $23.37 | $35.00 | $35.00 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 290 FT | $45.02 | $40.00 | $26.08 | $45.00 | $40.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 20 EACH | $275 | $105 | $282 | $145 | $125 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 21 EACH | $225 | $74.32 | $230 | $115 | $125 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 10 EACH | $1,750 | $2,000 | $1,792 | $2,400 | $2,600 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 1,845 FT | $1.85 | $3.75 | $1.89 | $3.75 | $5.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,650 FT | $0.51 | $1.32 | $0.52 | $2.50 | $0.50 |
| 625E25500 CONDUIT, 3", 725.04 | 1,066 FT | $2.54 | $22.01 | $2.60 | $30.00 | $36.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 (3") | 221 FT | $55.00 | $75.97 | $56.32 | $51.00 | $60.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 10 EACH | $476 | $284 | $487 | $540 | $478 |
| 625E29000 TRENCH | 1,039 FT | $20.00 | $11.37 | $20.48 | $9.00 | $14.00 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $643 | $1,357 | $659 | $1,300 | $1,200 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $846 | $1,500 | $867 | $1,500 | $1,500 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $575 | $401 | $589 | $250 | $350 |
| 625E32000 GROUND ROD | 10 EACH | $125 | $225 | $128 | $325 | $265 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,575 | $13,500 | $2,637 | $9,500 | $10,500 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 1,260 FT | $1.75 | $2.20 | $1.79 | $1.25 | $3.00 |
| 625E39000 TEMPORARY LIGHTING | 1 LS | $21,175 | $8,500 | $21,684 | $17,000 | $10,000 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $15,000 | $2,000 | $15,360 | $1,700 | $8,000 |
| 625E75403 LIGHT POLE REMOVED FOR STORAGE, AS PER PLAN | 2 EACH | $1,250 | $401 | $1,280 | $375 | $400 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 1 EACH | $750 | $251 | $768 | $350 | $125 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, FAY-22-6.21 | 1 EACH | $3,500 | $5,000 | $3,584 | $3,650 | $3,450 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $1,750 | $1,511 | $1,792 | $1,100 | $725 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,275 | $2,600 | $1,306 | $1,200 | $750 |
| 621E00100 RPM | 69 EACH | $89.00 | $89.00 | $91.14 | $78.00 | $89.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 248 FT | $17.00 | $17.00 | $21.28 | $16.00 | $17.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 178 FT | $18.00 | $18.50 | $23.09 | $17.50 | $18.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST (SQUARE POST) | 59 FT | $25.00 | $25.00 | $30.31 | $20.00 | $25.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 26 FT | $30.00 | $30.00 | $30.72 | $74.00 | $30.00 |
| 630E08600 SIGN POST REFLECTOR | 15 EACH | $50.00 | $50.00 | $67.09 | $45.00 | $50.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $200 | $200 | $205 | $645 | $200 |
| 630E80100 SIGN, FLAT SHEET | 220 SF | $25.00 | $25.00 | $24.89 | $18.00 | $25.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 27 SF | $30.00 | $30.00 | $30.72 | $29.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 30 EACH | $20.00 | $22.00 | $16.96 | $10.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 26 EACH | $20.00 | $22.00 | $22.61 | $15.00 | $20.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 3 EACH | $500 | $500 | $22.53 | $365 | $500 |
| 644E00104 EDGE LINE, 6" | 0.74 MILE | $8,085 | $8,085 | $8,279 | $5,395 | $5,395 |
| 644E00300 CENTER LINE | 0.14 MILE | $10,770 | $10,770 | $11,029 | $8,305 | $8,305 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 45 FT | $12.25 | $12.25 | $12.54 | $10.40 | $10.40 |
| 644E01000 RAILROAD SYMBOL MARKING | 1 EACH | $750 | $750 | $768 | $525 | $525 |
| 644E01520 DOTTED LINE, 12" | 203 FT | $3.65 | $3.65 | $3.74 | $6.20 | $6.20 |
| 644E20800 YIELD LINE | 73 FT | $15.75 | $15.75 | $16.13 | $41.50 | $41.50 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $1,200 | $1,250 | $1,280 | $1,650 | $1,200 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $195 | $50.00 | $71.91 | $70.00 | $75.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 50 CY | $195 | $200 | $71.91 | $80.00 | $75.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $144 | $120 | $155 | $90.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 200 FT | $2.00 | $3.00 | $2.19 | $3.00 | $2.20 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $2,000 | $1,912 | $2,500 | $2,400 |
| 614E12420 DETOUR SIGNING | 1 LS | $11,825 | $20,000 | $17,395 | $30,000 | $18,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $247 | $400 | $137 | $250 | $250 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BI-DIRECTIONAL) | 37 EACH | $10.00 | $12.00 | $9.41 | $7.00 | $9.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (ONE-WAY) | 49 EACH | $10.00 | $10.00 | $9.41 | $6.00 | $9.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 49 EACH | $20.00 | $20.00 | $19.13 | $10.00 | $18.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 37 EACH | $20.00 | $21.00 | $21.24 | $12.00 | $20.00 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 0.04 MILE | $1,115 | $1,115 | $1,142 | $610 | $1,115 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.01 MILE | $1,340 | $1,340 | $1,372 | $520 | $1,340 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.58 MILE | $2,850 | $2,850 | $2,918 | $2,255 | $2,850 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.22 MILE | $12,273 | $12,273 | $12,568 | $15,745 | $12,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.08 MILE | $1,860 | $1,860 | $1,905 | $1,500 | $1,860 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.34 MILE | $1,780 | $1,780 | $1,823 | $1,315 | $1,780 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.64 MILE | $2,340 | $2,340 | $2,396 | $1,575 | $2,340 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 1.38 MILE | $7,102 | $7,102 | $7,273 | $10,450 | $7,000 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.48 MILE | $1,565 | $1,565 | $1,603 | $975 | $1,565 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 862 FT | $1.00 | $1.00 | $1.02 | $0.80 | $1.00 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 99 FT | $2.43 | $2.43 | $2.49 | $3.00 | $2.50 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 317 FT | $0.95 | $95.00 | $0.97 | $0.45 | $1.00 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 279 FT | $1.55 | $1.55 | $1.59 | $1.30 | $1.55 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 87 FT | $0.90 | $9.00 | $0.92 | $0.45 | $0.90 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 375 FT | $3.25 | $3.25 | $3.33 | $0.90 | $3.25 |
| 614E30000 WORK ZONE ARROW, CLASS I | 4 EACH | $100 | $100 | $102 | $135 | $100 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 1 EACH | $229 | $229 | $235 | $615 | $230 |
| 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I | 1 EACH | $475 | $475 | $486 | $200 | $475 |
| 614E40050 BUSINESS ENTRANCE SIGN | 4 EACH | $125 | $1,000 | $218 | $400 | $215 |
| 616E10000 WATER | 36 MGAL | $151 | $100 | $141 | $80.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,621 | $28,000 | $8,853 | $17,500 | $12,950 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,945 | $25,000 | $27,751 | $107,500 | $29,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 974 CY | $240 | $234k | 10% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 2,813 SY | $80 | $225k | 10% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 8,767 SY | $16.3 | $143k | 6% |
| 304E20000 AGGREGATE BASE | 1,118 CY | $110.52 | $124k | 5% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 250 CY | $450 | $113k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 291 CY | $318 | $93k | 4% |
| 609E71000 CONCRETE MEDIAN | 5,386 SF | $16.05 | $86k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 4,260 FT | $18.25 | $78k | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,786 FT | $37.78 | $67k | 3% |