| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Shelly Company | R4Fillmore Construction | R5Axis Civil Construction LLC | R6D G M INC | R7Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 342 CY | $195 | $195 | $219 | $200 | $270 | $210 | $280 | 17% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 121 CY | $325 | $325 | $369 | $250 | $295 | $335 | $470 | 10% |
| 614E11000 |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Shelly Company | R4Fillmore Construction | R5Axis Civil Construction LLC | R6D G M INC | R7Alan Stone CO INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $15,000 | $18,500 | $10,000 | $1,000 | $11,000 | $4,800 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 2 EACH | $445 | $209 | $550 | $500 | $275 | $200 | $1,200 |
| 202E75000 FENCE REMOVED | 280 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $38,000 |
| $19,500 |
| $83,250 |
| $15,000 |
| $25,000 |
| $60,000 |
| $18,000 |
| 10% |
| 304E20000 AGGREGATE BASE | 263 CY | $125 | $130 | $80.75 | $100 | $135 | $120 | $130 | 8% |
| 203E10000 EXCAVATION | 496 CY | $60.00 | $42.00 | $61.25 | $30.00 | $45.00 | $35.00 | $55.00 | 8% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 409 CY | $65.00 | $75.00 | $63.75 | $100 | $95.00 | $100 | $85.00 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25,000 | $35,000 | $48,500 | $35,000 | $20,000 | $35,000 | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 700 FT | $35.00 | $39.00 | $38.27 | $40.00 | $36.00 | $24.00 | $21.00 | 6% |
| 202E23000 PAVEMENT REMOVED | 495 SY | $28.00 | $21.00 | $26.50 | $10.00 | $20.00 | $12.00 | $30.00 | 4% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 390 FT | $32.00 | $29.00 | $29.00 | $48.00 | $48.00 | $50.00 | $75.00 | 3% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,720 | $2,150 | $1,930 | $2,000 | $2,800 | $2,250 | $2,500 | 3% |
| 659E00300 TOPSOIL | 136 CY | $75.00 | $39.00 | $200 | $50.00 | $48.00 | $20.00 | $35.00 | 3% |
| 607E23000 FENCE, TYPE CLT | 274 FT | $37.00 | $42.00 | $37.00 | $50.00 | $37.00 | $46.00 | $50.00 | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 1 EACH | $8,500 | $8,500 | $8,500 | $24,000 | $24,000 | $25,000 | $21,000 | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 1 EACH | $8,500 | $8,500 | $8,500 | $43,000 | $43,000 | $45,000 | $21,000 | 2% |
| 832E30000 EROSION CONTROL | 8,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 204E10000 SUBGRADE COMPACTION | 1,451 SY | $5.00 | $9.00 | $2.25 | $5.00 | $3.00 | $4.00 | $5.50 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $17,000 | $10,000 | $15,000 | $10,000 | $8,000 | $53,000 | 2% |
| 632E04000 VEHICULAR SIGNAL HEAD, MISC.:BACKPLATE | 8 EACH | $675 | $675 | $675 | $850 | $850 | $875 | $1,700 | 1% |
| 611E00406 4" CONDUIT, TYPE F | 100 FT | $52.00 | $33.00 | $27.00 | $50.00 | $16.50 | $15.00 | $25.00 | 1% |
| $4.40 |
| $8.00 |
| $8.50 |
| $10.00 |
| $5.00 |
| $5.00 |
| $7.50 |
| 202E98100 REMOVAL MISC.:ROCK | 2 EACH | $350 | $200 | $395 | $1,000 | $90.00 | $50.00 | $240 |
| 203E20000 EMBANKMENT | 149 CY | $24.00 | $25.00 | $47.00 | $50.00 | $45.00 | $35.00 | $45.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 409 CY | $12.00 | $53.00 | $43.50 | $30.00 | $45.00 | $35.00 | $45.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $225 | $277 | $260 | $200 | $200 | $1,500 | $280 |
| 204E50000 GEOTEXTILE FABRIC | 701 SY | $5.00 | $0.75 | $1.95 | $5.00 | $2.00 | $2.50 | $1.50 |
| 608E53020 DETECTABLE WARNING | 68 SF | $45.00 | $58.00 | $50.00 | $50.00 | $85.00 | $35.00 | $40.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 4 EACH | $980 | $2,200 | $1,525 | $2,500 | $3,000 | $1,000 | $2,300 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 2 EACH | $1,000 | $800 | $455 | $1,500 | $600 | $400 | $720 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $172 | $150 | $165 | $500 | $265 | $100 | $230 |
| 659E10000 SEEDING AND MULCHING | 1,226 SY | $2.80 | $2.80 | $3.60 | $2.00 | $2.80 | $3.50 | $4.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 61.3 SY | $2.80 | $2.80 | $5.00 | $2.20 | $2.80 | $0.05 | $5.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $1,250 | $1,250 | $900 | $1,400 | $1,250 | $1,500 | $660 |
| 659E31000 LIME | 0.25 ACRE | $150 | $150 | $2.52 | $450 | $150 | $300 | $950 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $2.50 | $100 | $1.00 | $1.00 | $120 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 200 FT | $25.00 | $21.00 | $26.00 | $25.00 | $16.50 | $15.00 | $25.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $1,500 | $556 | $575 | $500 | $450 | $150 | $710 |
| 407E10000 TACK COAT | 237 GAL | $4.00 | $4.00 | $2.50 | $5.00 | $3.00 | $4.00 | $5.00 |
| 609E26000 CURB, TYPE 6 | 32 FT | $112 | $115 | $153 | $100 | $87.00 | $60.00 | $130 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $460 | $875 | $405 | $500 | $500 | $300 | $310 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $460 | $1,100 | $405 | $1,000 | $500 | $300 | $660 |
| 621E00100 RPM | 53 EACH | $80.00 | $80.00 | $48.00 | $80.00 | $140 | $84.00 | $120 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 22 EACH | $54.00 | $26.00 | $50.00 | $20.00 | $35.00 | $1.00 | $40.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 197.5 FT | $18.35 | $19.00 | $20.00 | $20.00 | $20.00 | $21.00 | $25.00 |
| 630E08600 SIGN POST REFLECTOR | 6 EACH | $75.04 | $75.00 | $45.00 | $50.00 | $45.00 | $60.00 | $60.00 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 1 EACH | $347 | $348 | $525 | $700 | $525 | $725 | $830 |
| 630E80100 SIGN, FLAT SHEET | 27.5 SF | $22.12 | $23.00 | $22.00 | $30.00 | $22.00 | $30.00 | $35.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 8 EACH | $82.50 | $82.50 | $65.00 | $150 | $65.00 | $160 | $180 |
| 644E00104 EDGE LINE, 6", WHITE | 0.28 MILE | $5,800 | $5,800 | $5,800 | $7,280 | $7,280 | $7,500 | $8,600 |
| 644E00300 CENTER LINE | 0.34 MILE | $7,000 | $7,000 | $7,000 | $10,450 | $10,450 | $11,000 | $12,000 |
| 644E00404 CHANNELIZING LINE, 12" | 795 FT | $2.20 | $2.20 | $2.20 | $3.00 | $3.00 | $3.00 | $3.50 |
| 644E00500 STOP LINE | 73 FT | $9.00 | $9.00 | $9.00 | $8.50 | $8.50 | $9.00 | $10.00 |
| 644E00620 CROSSWALK LINE, 12" | 193 FT | $8.00 | $8.00 | $8.00 | $4.20 | $4.20 | $5.00 | $5.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW | 187 FT | $7.00 | $7.00 | $7.00 | $8.50 | $8.50 | $9.00 | $10.00 |
| 644E01300 LANE ARROW | 15 EACH | $120 | $120 | $120 | $95.00 | $95.00 | $100 | $110 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 3,760 FT | $0.55 | $0.55 | $0.55 | $1.00 | $0.90 | $1.00 | $1.50 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 2 EACH | $50.00 | $50.00 | $50.00 | $145 | $145 | $200 | $2,400 |
| 625E31510 PULL BOX REMOVED | 4 EACH | $250 | $250 | $250 | $525 | $525 | $550 | $630 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,750 | $1,750 | $1,750 | $2,800 | $2,800 | $2,900 | $4,400 |
| 632E07600 SPECIAL - REMOVAL AND REPLACEMENT OF SIGNAL HANGER | 8 EACH | $600 | $600 | $600 | $475 | $475 | $500 | $1,500 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 2 EACH | $45.00 | $45.00 | $45.00 | $50.00 | $50.00 | $55.00 | $110 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 25 FT | $3.50 | $3.50 | $3.50 | $5.00 | $5.00 | $5.00 | $9.00 |
| 632E40900 SIGNAL CABLE, 9 CONDUCTOR, NO. 14 AWG | 175 FT | $4.50 | $4.50 | $4.50 | $6.00 | $6.00 | $7.00 | $10.00 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (VEHI | 1 EACH | $300 | $300 | $300 | $250 | $250 | $275 | $760 |
| 632E90200 REUSE OF VEHICULAR SIGNAL HEAD | 8 EACH | $400 | $400 | $400 | $750 | $750 | $800 | $1,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $85.00 | $105 | $80.00 | $150 | $75.00 | $70.00 | $110 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 BIDIRECTIONAL | 28 EACH | $50.00 | $10.00 | $16.50 | $50.00 | $25.00 | $50.00 | $60.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.22 MILE | $17,500 | $17,500 | $5,000 | $17,500 | $17,500 | $18,000 | $21,000 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.37 MILE | $10,250 | $10,250 | $5,000 | $10,250 | $10,250 | $11,000 | $12,000 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 100 FT | $10.00 | $10.00 | $2.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 60 FT | $14.00 | $14.00 | $6.00 | $14.00 | $14.00 | $15.00 | $15.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 2 EACH | $500 | $500 | $70.00 | $500 | $500 | $550 | $590 |
| 616E10000 WATER | 2 MGAL | $1,800 | $250 | $1.00 | $100 | $1.00 | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $3,000 | $5,000 | $15,000 | $3,500 | $30,000 | $12,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 342 CY | $195 | $67k | 13% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 121 CY | $325 | $39k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $38,000 | $38k | 8% |
| 304E20000 AGGREGATE BASE | 263 CY | $125 | $33k | 7% |
| 203E10000 EXCAVATION | 496 CY | $60 | $30k | 6% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 409 CY | $65 | $27k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 700 FT | $35 | $25k | 5% |
| 202E23000 PAVEMENT REMOVED | 495 SY | $28 | $14k | 3% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 390 FT | $32 | $12k | 3% |