CLE-SR 132-12.64
CLE County · est $0.7M
Bid dateThursday, January 29—
Awarded toCOMPLETE GENERAL CONSTRUCTION COMPANY$568,753.5
CLE County · est $0.7M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 80 FT | $1,000 | $80k | 14% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $78,000 | $78k | 14% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 10 CY | $5,500 | $55k | 10% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 389 SY | $140 | $54k | 10% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 389 SY | $100 | $39k | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 3,562 SF | $10 | $36k | 6% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 3,562 SF | $9 | $32k | 6% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 3,562 SF | $9 | $32k | 6% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 3,562 SF | $8 | $28k | 5% |
| 624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $48,000.00 2 $46,000.00 3 $82,625.00 4 $146,713.75 5 $91,055.00 | 1 LS | $25,000 | $25k | 4% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Eagle Bridge CO | R3Prus Construction Company | R4Bcc Ohio INC | R5Kt Holden Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 80 FT | $1,000 | $1,125 | $1,265 | $1,239 | $1,055 | 15% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $78,000 | $77,500 | $44,150 | $33,683 | $82,965 | 14% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 10 CY | $5,500 | $4,600 | $4,285 | $3,277 | $3,800 | 10% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 389 SY | $140 | $145 | $135 | $103 | $121 | 10% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 389 SY | $100 | $145 | $110 | $96.92 | $100 | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 3,562 SF | $10.00 | $10.00 | $11.00 | $10.50 | $10.00 | 7% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 3,562 SF | $9.00 | $9.00 | $10.00 | $9.45 | $9.00 | 6% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 3,562 SF | $9.00 | $9.00 | $10.00 | $9.45 | $9.00 | 6% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 3,562 SF | $8.00 | $8.00 | $9.00 | $8.40 | $8.00 | 5% |
| 624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $48,000.00 2 $46,000.00 3 $82,625.00 4 $146,713.75 5 $91,055.00 | 1 LS | $25,000 | $27,500 | $20,000 | $105,951 | $31,575 | 5% |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 150 FT | $153 | $130 | $168 | $160 | $130 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $3,500 | $52,525 | $29,578 | $38,000 | 3% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $10,410.50 2 $10,430.06 3 $8,986.15 4 $9,285.60 5 $10,423.50 | 7,200 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E12420 DETOUR SIGNING Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $6,500.00 2 $9,000.00 3 $7,625.00 4 $6,814.74 5 $12,000.00 | 1 LS | $6,500 | $9,000 | $7,625 | $6,815 | $12,000 | 1% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 16 CY | $370 | $300 | $420 | $518 | $325 | 1% |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN Section 1 - ROADWAY - Totals Awd $22,330.00 2 $21,325.00 3 $21,586.25 4 $19,509.75 5 $48,395.00 | 4 EACH | $1,385 | $1,500 | $1,524 | $1,454 | $1,500 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,680 | $2,600 | $2,948 | $2,814 | $2,600 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $12,500 | $6,100 | $7,584 | $11,480 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 187.5 FT | $22.80 | $26.00 | $25.00 | $23.94 | $26.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 315 SY | $10.00 | $10.00 | $4.65 | $5.00 | $10.00 | 1% |
| Item | Quantity | R1Complete General Construction Company | R2Eagle Bridge CO | R3Prus Construction Company | R4Bcc Ohio INC | R5Kt Holden Construction LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $500 | $2,175 | $774 | $25,000 |
| 202E38000 GUARDRAIL REMOVED | 200 FT | $2.40 | $3.00 | $2.65 | $2.52 | $11.50 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 2 EACH | $500 | $650 | $358 | $341 | $1,000 |
| 202E47001 BRIDGE TERMINAL ASSEMBLY REMOVED, AS PER PLAN | 4 EACH | $500 | $150 | $82.50 | $78.75 | $380 |
| 203E20000 EMBANKMENT | 15 CY | $45.00 | $150 | $77.25 | $86.70 | $100 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $1,250 | $1,250 | $1,000 | $6,225 | $1,500 |
| 659E31000 LIME | 0.06 ACRE | $150 | $1.00 | $2,315 | $4,150 | $200 |
| 659E35000 WATER | 1.5 MGAL | $1.00 | $20.00 | $95.00 | $8.40 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 7 EACH | $15.00 | $12.50 | $16.50 | $15.75 | $12.50 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $60,000 | $60,000 | $74,865 | $63,000 | $60,000 |
| 646E10200 CENTER LINE Section 3 - TRAFFIC CONTROL - Totals Awd $3,705.00 2 $3,687.50 3 $6,104.80 4 $3,890.25 5 $3,687.50 | 0.02 MILE | $60,000 | $60,000 | $149,735 | $63,000 | $60,000 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 472 LB | $6.00 | $3.00 | $5.00 | $3.91 | $15.00 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $6.00 | $1.50 | $4.00 | $3.91 | $6.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 10 EACH | $35.00 | $20.00 | $210 | $31.88 | $31.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 6 MNHR | $150 | $150 | $165 | $158 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $100 | $100 | $110 | $105 | $100 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 80 FT | $26.00 | $30.00 | $77.50 | $38.05 | $26.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 154 FT | $16.00 | $20.00 | $21.75 | $19.12 | $15.75 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 10 SF | $250 | $300 | $425 | $154 | $250 |
| 848E50000 HAND CHIPPING | 10 SY | $85.00 | $110 | $248 | $273 | $250 |
| 848E50100 TEST SLAB Section 5 - STRUCTURE OVER 20 FOOT SPAN (CLE-132-12. - Totals Awd $477,808.00 2 $492,638.00 3 $481,359.50 4 $428,110.42 5 $465,961.50 | 1 LS | $1,500 | $1,250 | $1,000 | $3,829 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $2,500 | $4,000 | $3,600 | $10,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →