CLI-IR 71-04.23
CLI County · est $3.0M
Bid dateThursday, January 29—
Awarded toJOHN R JURGENSEN COMPANY$3.29M
CLI County · est $3.0M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 6,021 CY | $258.14 | $1.55M | 47% |
| 255E19101 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 250 SY | $1,752 | $438k | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $342,611 | $343k | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 144,492 SY | $1.77 | $256k | 8% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $521,975.86 2 $489,500.00 | 1 LS | $162,500 | $163k | 5% |
| 253E02000 PAVEMENT REPAIR | 150 CY | $720.48 | $108k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 13,005 GAL | $4.5 | $59k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 420 HOUR | $137.18 | $58k | 2% |
| 617E10100 COMPACTED AGGREGATE | 410 CY | $137.98 | $57k | 2% |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 12.58 MILE | $4,280 | $54k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 6,021 CY | $258 | $270 | 48% |
| 255E19101 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 250 SY | $1,752 | $1,700 | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $342,611 | $375,000 | 11% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 144,492 SY | $1.77 | $2.75 | 8% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $521,975.86 2 $489,500.00 | 1 LS | $162,500 | $100,000 | 5% |
| 253E02000 PAVEMENT REPAIR | 150 CY | $720 | $1,075 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 13,005 GAL | $4.50 | $5.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 420 HOUR | $137 | $100 | 2% |
| 617E10100 COMPACTED AGGREGATE | 410 CY | $138 | $170 | 2% |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 12.58 MILE | $4,280 | $4,280 | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 4,316 CY | $10.00 | $18.00 | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1,470 | $1,470 | 1% |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 6.16 MILE | $1,830 | $1,830 | 0% |
| 617E20000 SHOULDER PREPARATION | 7,380 SY | $1.50 | $2.20 | 0% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 13.58 MILE | $800 | $800 | 0% |
| 621E00100 RPM | 270 EACH | $39.00 | $39.00 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,533 | $9,500 | 0% |
| 647E21012 SPEED MEASUREMENT MARKING, TYPE B125 | 12 EACH | $781 | $395 | 0% |
| 645E00118 EDGE LINE, 6", TYPE A4 | 0.34 MILE | $24,000 | $24,000 | 0% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $7,332 | $5,000 | 0% |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 832E30000 EROSION CONTROL Section 1 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.00 | 1,000 EACH | $1.00 | $1.00 |
| 254E01600 PATCHING PLANED SURFACE | 1,450 SY | $4.43 | $4.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 815 FT | $8.28 | $5.00 |
| 617E25000 WATER | 8 MGAL | $7.84 | $1.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) Section 2 - PAVEMENT - Totals Awd $2,545,722.10 2 $2,867,857.50 | 12.34 MILE | $565 | $1,625 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 270 EACH | $18.43 | $9.00 |
| 644E00720 CHEVRON MARKING | 554 FT | $7.00 | $7.00 |
| 646E20200 PARKING LOT STALL MARKING | 910 FT | $2.00 | $2.00 |
| 646E20320 WRONG WAY ARROW | 1 EACH | $250 | $250 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 1,800 FT | $2.00 | $2.00 |
| 807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 1,200 FT | $1.80 | $1.80 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING Section 3 - TRAFFIC CONTROL - Totals Awd $140,607.46 2 $133,434.40 | — | $1.60 | $1.60 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $950 | $775 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 7.25 MILE | $660 | $660 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,200 FT | $2.00 | $2.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $85,044.60 2 $65,549.00 | 4 SNMT | $1,395 | $600 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →