POR-SR 14/VAR-01.74/VAR (PART 1)
POR County · est $5.9M
Bid dateThursday, January 29—
Awarded toKARVO COMPANIES INC$5.24M
POR County · est $5.9M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7,090 CY | $205 | $1.45M | 28% |
| 452E14050 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 7,276 SY | $80 | $582k | 11% |
| 624E10000 MOBILIZATION Section 24 - INCIDENTALS (PARTS 1, 2 AND 3) - Totals Awd $840,401.12 2 $872,912.00 | 1 LS | $390,469 | $390k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $336,177 | $336k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2") | 77,081 SY | $2.75 | $212k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 66,567 SY | $2.5 | $166k | 3% |
| 202E23000 PAVEMENT REMOVED | 7,611 SY | $15 | $114k | 2% |
| 304E20000 AGGREGATE BASE | 1,792 CY | $60 | $108k | 2% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $83,000 | $83k | 2% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 31 EACH | $2,000 | $62k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 266 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Perk Company INC | % of bid |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7,090 CY | $205 | $230 | 37% |
| 452E14050 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 7,276 SY | $80.00 | $145 | 15% |
| 624E10000 MOBILIZATION Section 24 - INCIDENTALS (PARTS 1, 2 AND 3) - Totals Awd $840,401.12 2 $872,912.00 | 1 LS | $390,469 | $405,199 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $336,177 | $330,220 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2") | 77,081 SY | $2.75 | $2.25 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 66,567 SY | $2.50 | $2.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 7,611 SY | $15.00 | $26.60 | 3% |
| 304E20000 AGGREGATE BASE | 1,792 CY | $60.00 | $85.00 | 3% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $83,000 | $35,601 | 2% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 31 EACH | $2,000 | $2,350 | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (LONGITUDINAL) | 1,200 SY | $50.00 | $65.00 | 2% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 Section 11 - PAVEMENT (PART 2) - Totals Awd $787,557.00 2 $1,374,535.00 | 1,268 FT | $40.00 | $70.00 | 1% |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 591 SY | $75.00 | $135 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 350 HOUR | $125 | $86.25 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $39,000 | $25,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $38,755 | $75,293 | 1% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 205 CY | $185 | $250 | 1% |
| 203E10000 EXCAVATION | 2,076 CY | $18.00 | $35.00 | 1% |
| 632E79131 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $18,650 | $19,298 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $3,000 | $3,100 | 1% |
| Item | Quantity | R1Karvo Companies INC | R2Perk Company INC |
|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 16 SY | $25.00 | $100 |
| 202E30000 WALK REMOVED | 1,368 SF | $8.00 | $4.00 |
| 202E32000 CURB REMOVED | 141 FT | $40.00 | $21.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 17 CY | $25.00 | $100 |
| 209E60200 LINEAR GRADING | 242 STA | $50.00 | $50.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 23 STA | $150 | $75.00 |
| 608E10000 4" CONCRETE WALK | 120 SF | $15.00 | $22.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 1,185 SF | $15.00 | $49.65 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $2,000 | $1,750 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS Section 1 - ROADWAY (PART 1) - Totals Awd $66,034.00 2 $97,283.25 | 1 LS | $3,500 | $1,500 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL (PART 1) - Totals Awd $3,000.00 2 $3,000.00 | 3,000 EACH | $1.00 | $1.00 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 150 FT | $25.00 | $15.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,250 | $2,500 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,500 | $2,650 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL Section 3 - DRAINAGE (PART 1) - Totals Awd $72,950.00 2 $85,150.00 | 800 LB | $4.00 | $3.00 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (TRANSVERSE) | 200 SY | $125 | $120 |
| 253E01000 PAVEMENT REPAIR | 200 SY | $125 | $285 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 17 CY | $25.00 | $125 |
| 407E20000 NON-TRACKING TACK COAT | 12,980 GAL | $2.30 | $2.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 2,038 GAL | $5.00 | $2.50 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 3 CY | $250 | $175 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $450 | $675 |
| 609E26000 CURB, TYPE 6 | 63 FT | $85.00 | $125 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN Section 4 - PAVEMENT (PART 1) - Totals Awd $2,016,864.25 2 $2,161,706.25 | 142 CY | $175 | $130 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE Section 5 - WATER WORK (PART 1) - Totals Awd $25,500.00 2 $22,100.00 | 17 EACH | $1,500 | $1,300 |
| 646E10010 EDGE LINE, 6" | 5.03 MILE | $3,075 | $3,075 |
| 646E10110 LANE LINE, 6" | 5.41 MILE | $1,675 | $1,675 |
| 646E10200 CENTER LINE | 5.95 MILE | $3,675 | $3,675 |
| 646E10300 CHANNELIZING LINE, 8" | 79 FT | $1.65 | $1.65 |
| 646E10310 CHANNELIZING LINE, 12" | 7,460 FT | $1.87 | $1.87 |
| 646E10400 STOP LINE | 817 FT | $9.75 | $9.75 |
| 646E10520 CROSSWALK LINE, 24" | 604 FT | $10.15 | $10.15 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 947 FT | $6.45 | $6.45 |
| 646E10800 ISLAND MARKING | 194 SF | $6.25 | $6.25 |
| 646E20300 LANE ARROW | 137 EACH | $147 | $147 |
| 646E20400 WORD ON PAVEMENT, 72" | 14 EACH | $195 | $195 |
| 646E20504 DOTTED LINE, 6" Section 6 - TRAFFIC CONTROL (PART 1) - Totals Awd $105,497.18 2 $105,497.18 | 443 FT | $1.66 | $1.66 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $75.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $500 | $450 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $850 | $1,100 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 5.41 MILE | $510 | $510 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 5.41 MILE | $490 | $490 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 5.95 MILE | $925 | $925 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.95 MILE | $788 | $788 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.03 MILE | $598 | $598 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 79 FT | $0.67 | $0.67 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 7,460 FT | $0.62 | $0.62 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 79 FT | $0.62 | $0.62 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 7,460 FT | $0.55 | $0.55 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 817 FT | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT Section 7 - MAINTENANCE OF TRAFFIC (PART 1) - Totals Awd $88,138.15 2 $76,075.65 | 817 FT | $2.75 | $2.75 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $500 |
| 202E30000 WALK REMOVED | 451 SF | $3.00 | $3.00 |
| 202E32500 CURB AND GUTTER REMOVED | 1,268 FT | $12.50 | $7.40 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 5 FT | $115 | $30.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $1,200 | $700 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 1 EACH | $300 | $250 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 2 EACH | $250 | $850 |
| 202E98200 REMOVAL MISC.: CONDUIT | 10 FT | $45.00 | $100 |
| 203E20000 EMBANKMENT | 6 CY | $75.00 | $100 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $60.00 | $100 |
| 203E98500 ROADWAY, MISC.: PRE-CONSTRUCTION VIDEO | 1 LS | $275 | $2,500 |
| 204E10000 SUBGRADE COMPACTION | 7,619 SY | $1.75 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 344 CY | $25.00 | $25.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 344 CY | $60.00 | $75.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $400 | $250 |
| 204E50000 GEOTEXTILE FABRIC | 1,032 SY | $2.00 | $2.50 |
| 608E10000 4" CONCRETE WALK | 48 SF | $15.00 | $50.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 403 SF | $25.00 | $55.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 1 EACH | $2,000 | $1,500 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $2,500 | $3,500 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION Section 8 - ROADWAY (PART 2) - Totals Awd $240,518.25 2 $383,381.80 | 1 LS | $2,500 | $2,350 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $325 | $10.00 |
| 659E00300 TOPSOIL | 109 CY | $65.00 | $75.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 976 SY | $2.75 | $8.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $1,125 | $950 |
| 659E31000 LIME | 0.21 ACRE | $1,575 | $850 |
| 659E35000 WATER | 7.91 MGAL | $5.00 | $65.00 |
| 832E30000 EROSION CONTROL Section 9 - EROSION CONTROL (PART 2) - Totals Awd $28,446.80 2 $34,816.65 | 17,500 EACH | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 40 FT | $25.00 | $35.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,119 FT | $18.00 | $26.25 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 110 FT | $18.00 | $26.25 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $75.00 | $26.25 |
| 611E05900 15" CONDUIT, TYPE B | 5 FT | $215 | $595 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 10 FT | $200 | $250 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 10 FT | $200 | $250 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 10 FT | $200 | $250 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $5,000 | $11,166 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 6 EACH | $1,250 | $1,750 |
| 611E99154 INLET RECONSTRUCTED TO GRADE | 1 EACH | $1,500 | $2,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 6 EACH | $1,500 | $1,500 |
| 611E99720 INSPECTION WELL | 2 EACH | $1,000 | $2,750 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL Section 10 - DRAINAGE (PART 2) - Totals Awd $57,547.00 2 $85,465.75 | 400 LB | $4.00 | $6.00 |
| 301E56010 ASPHALT CONCRETE BASE, PG64-28, (449) | 5 CY | $775 | $1,000 |
| 305E11010 7" CONCRETE BASE, CLASS QC 1P | 174 SY | $90.00 | $165 |
| 407E13900 TACK COAT, 702.13 | 14 GAL | $2.00 | $50.00 |
| 407E20000 NON-TRACKING TACK COAT | 12 GAL | $2.00 | $50.00 |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 7 CY | $575 | $1,000 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (10 CY | $475 | $1,000 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 151 SY | $125 | $175 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 150.1 FT | $12.50 | $12.50 |
| 630E80100 SIGN, FLAT SHEET | 75.5 SF | $20.00 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $35.00 | $35.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $35.00 | $35.00 |
| 644E00204 LANE LINE, 6" | 0.02 MILE | $15,000 | $15,000 |
| 644E00300 CENTER LINE | 0.02 MILE | $32,500 | $32,500 |
| 644E00404 CHANNELIZING LINE, 12" | 41 FT | $10.00 | $10.00 |
| 644E00500 STOP LINE | 24 FT | $20.00 | $20.00 |
| 644E01300 LANE ARROW | 1 EACH | $175 | $175 |
| 644E01510 DOTTED LINE, 6" | 11 FT | $10.00 | $10.00 |
| 646E10110 LANE LINE, 6" | 0.24 MILE | $3,977 | $3,977 |
| 646E10200 CENTER LINE | 0.13 MILE | $5,555 | $5,555 |
| 646E10310 CHANNELIZING LINE, 12" | 1,386 FT | $2.15 | $2.15 |
| 646E10400 STOP LINE | 205 FT | $13.55 | $13.55 |
| 646E10521 CROSSWALK LINE, 24", AS PER PLAN | 450 FT | $12.55 | $12.55 |
| 646E20300 LANE ARROW | 12 EACH | $195 | $195 |
| 646E20400 WORD ON PAVEMENT, 72" | 12 EACH | $225 | $225 |
| 646E20504 DOTTED LINE, 6" Section 12 - TRAFFIC CONTROL (PART 2) - Totals Awd $26,220.53 2 $26,220.53 | 494 FT | $3.75 | $3.75 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $125 | $86.25 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $7,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $250 | $450 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 30 SNMT | $850 | $1,100 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 1.15 MILE | $885 | $885 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 2.37 MILE | $1,080 | $1,080 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.12 MILE | $11,000 | $11,000 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 2.18 MILE | $615 | $615 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.35 MILE | $6,500 | $6,500 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 7,478 FT | $0.58 | $0.58 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 461 FT | $5.00 | $5.00 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 1,719 FT | $0.47 | $0.47 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 115 FT | $3.00 | $3.00 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 1,154 FT | $2.65 | $2.65 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 228 FT | $3.20 | $3.20 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 101 FT | $12.50 | $7.50 |
| 614E30000 WORK ZONE ARROW, CLASS I | 81 EACH | $47.00 | $47.00 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 8 EACH | $225 | $225 |
| 614E31000 WORK ZONE WORD ON PAVEMENT, 72", CLASS I | 10 EACH | $225 | $225 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 558 SF | $3.35 | $3.35 |
| 616E10000 WATER Section 13 - MAINTENANCE OF TRAFFIC (PART 2) - Totals Awd $155,084.72 2 $114,180.72 | 50 MGAL | $10.00 | $1.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $500 |
| 202E23000 PAVEMENT REMOVED | 1,751 SY | $12.00 | $26.60 |
| 202E23000 PAVEMENT REMOVED (DRIVEWAYS) | 522 SY | $15.00 | $26.60 |
| 202E30000 WALK REMOVED | 337 SF | $3.00 | $3.00 |
| 202E30800 TRAFFIC ISLAND REMOVED | 94 SY | $25.00 | $26.60 |
| 202E32000 CURB REMOVED | 830 FT | $20.00 | $15.00 |
| 202E32500 CURB AND GUTTER REMOVED | 611 FT | $20.00 | $15.00 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $500 | $850 |
| 202E98200 REMOVAL MISC.: CONDUIT | 5 FT | $90.00 | $50.00 |
| 203E10000 EXCAVATION | 377 CY | $30.00 | $40.00 |
| 203E20000 EMBANKMENT | 336 CY | $25.00 | $40.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $65.00 | $85.00 |
| 203E98500 ROADWAY, MISC.: PRE-CONSTRUCTION VIDEO | 1 LS | $275 | $850 |
| 204E10000 SUBGRADE COMPACTION | 1,472 SY | $3.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 25 CY | $50.00 | $35.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 25 CY | $80.00 | $125 |
| 204E45000 PROOF ROLLING | 1 HOUR | $400 | $250 |
| 204E50000 GEOTEXTILE FABRIC | 74 SY | $5.00 | $10.00 |
| 608E10000 4" CONCRETE WALK | 173 SF | $15.00 | $30.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 131 SF | $25.00 | $55.00 |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 245 SY | $42.50 | $35.00 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $2,500 | $2,500 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION Section 14 - ROADWAY (PART 3) - Totals Awd $115,926.50 2 $154,562.20 | 1 LS | $2,500 | $2,350 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $325 | $10.00 |
| 659E00300 TOPSOIL | 139 CY | $65.00 | $76.50 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 1,248 SY | $2.75 | $7.45 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $1,125 | $950 |
| 659E31000 LIME | 0.26 ACRE | $1,575 | $850 |
| 659E35000 WATER | 7 MGAL | $5.00 | $100 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $10,000 | $1,750 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $15,000 | $3,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $25,000 | $8,652 |
| 832E30000 EROSION CONTROL Section 15 - EROSION CONTROL (PART 3) - Totals Awd $76,252.75 2 $46,935.60 | 12,500 EACH | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 25 FT | $32.00 | $26.25 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,030 FT | $12.00 | $26.25 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $85.00 | $26.25 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 5 FT | $85.00 | $250 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 5 FT | $85.00 | $250 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 5 FT | $85.00 | $250 |
| 611E99720 INSPECTION WELL Section 16 - DRAINAGE (PART 3) - Totals Awd $16,085.00 2 $34,456.25 | 1 EACH | $800 | $2,750 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 607 SY | $8.00 | $10.00 |
| 304E20000 AGGREGATE BASE | 301 CY | $100 | $85.00 |
| 407E20000 NON-TRACKING TACK COAT | 221 GAL | $2.25 | $2.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 64 CY | $250 | $300 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (90 CY | $200 | $250 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 327 FT | $25.00 | $60.00 |
| 609E26000 CURB, TYPE 6 | 703 FT | $25.00 | $60.00 |
| 609E50000 4" CONCRETE TRAFFIC ISLAND Section 17 - PAVEMENT (PART 3) - Totals Awd $179,203.25 2 $269,382.00 | 10 SY | $175 | $275 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (SANITARY) Section 18 - SANITARY SEWER (PART 3) - Totals Awd $5,000.00 2 $4,700.00 | 2 EACH | $2,500 | $2,350 |
| 625E00450 CONNECTION, FUSED PULL APART | 3 EACH | $130 | $110 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 3 EACH | $130 | $110 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 1,242 FT | $5.00 | $3.49 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 378 FT | $3.00 | $1.49 |
| 625E25408 CONDUIT, 2", 725.051 | 55 FT | $14.00 | $7.45 |
| 625E25504 CONDUIT, 3", 725.051 | 102 FT | $17.00 | $10.11 |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.0513" | 156 FT | $55.00 | $121 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 3 EACH | $600 | $722 |
| 625E29000 TRENCH | 157 FT | $15.00 | $29.65 |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $1,250 | $1,100 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE Section 19 - LIGHTING (PART 3) - Totals Awd $28,834.00 2 $37,260.28 | 157 FT | $3.00 | $1.41 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 24 FT | $12.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 187 FT | $15.00 | $15.00 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 6 EACH | $675 | $675 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 5 EACH | $95.00 | $95.00 |
| 630E80100 SIGN, FLAT SHEET | 211.1 SF | $20.00 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 27 EACH | $35.00 | $35.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 18 EACH | $35.00 | $35.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $35.00 | $35.00 |
| 644E00204 LANE LINE, 6" | 0.29 MILE | $2,500 | $2,500 |
| 644E00300 CENTER LINE | 0.28 MILE | $5,500 | $5,500 |
| 644E00404 CHANNELIZING LINE, 12" | 508 FT | $2.25 | $2.25 |
| 644E00500 STOP LINE | 135 FT | $7.50 | $7.50 |
| 644E00631 CROSSWALK LINE, 24", AS PER PLAN | 56 FT | $7.50 | $7.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 27 FT | $6.00 | $6.00 |
| 644E00720 CHEVRON MARKING | 45 FT | $6.00 | $6.00 |
| 644E01300 LANE ARROW Section 20 - TRAFFIC CONTROL (PART 3) - Totals Awd $19,792.50 2 $19,792.50 | 9 EACH | $115 | $115 |
| 625E18201 BRACKET ARM, 15', AS PER PLAN | 3 EACH | $1,250 | $866 |
| 625E25400 CONDUIT, 2", 725.04 | 36 FT | $26.00 | $21.15 |
| 625E25500 CONDUIT, 3", 725.04 | 60 FT | $28.00 | $29.65 |
| 625E25600 CONDUIT, 4", 725.04 | 18 FT | $56.00 | $39.68 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 149 FT | $80.50 | $121 |
| 625E29000 TRENCH | 203 FT | $15.00 | $9.65 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $1,250 | $1,100 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,600 | $1,450 |
| 625E32000 GROUND ROD | 8 EACH | $350 | $299 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 203 FT | $3.00 | $1.41 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, TRAFFIC SIGNAL C | 1 EACH | $4,350 | $450 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 9 EACH | $1,700 | $959 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 3 EACH | $2,450 | $1,497 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $900 | $625 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 12 EACH | $50.00 | $40.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 2 EACH | $40.00 | $40.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 2 EACH | $300 | $655 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 705 FT | $3.50 | $2.55 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 785 FT | $4.00 | $3.01 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 4 EACH | $6,600 | $8,235 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,200 | $1,300 |
| 632E64950 TEST HOLE PERFORMED | 1 EACH | $600 | $365 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 1,020 FT | $2.00 | $2.25 |
| 632E69200 POWER CABLE, 2 CONDUCTOR, NO. 4 AWG | 230 FT | $9.50 | $6.85 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,000 | $3,685 |
| 632E72111 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 4, AS PER PL | 1 EACH | $12,950 | $13,958 |
| 632E79111 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $13,925 | $17,473 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 2 EACH | $900 | $1,744 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $23,500 | $21,468 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $3,200 | $1,450 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $1,100 | $925 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $7,400 | $7,923 |
| 809E60001 CCTV IP-CAMERA SYSTEM, PTZ, AS PER PLAN | 1 EACH | $7,900 | $6,650 |
| 809E65990 ITS DEVICE, MISC.: LAYER 2 ETHERNET SWITCH | 1 EACH | $3,200 | $4,855 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $6,400 | $5,703 |
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 1 EACH | $800 | $1,189 |
| 809E69211 PREEMPT RECEIVING UNIT, AS PER PLAN | 1 EACH | $4,400 | $1,402 |
| 809E69220 PREEMPT DETECTOR CABLE | 64 FT | $4.00 | $2.34 |
| 809E69231 PREEMPT PHASE SELECTOR, AS PER PLAN | 1 EACH | $4,500 | $4,652 |
| 809E69241 PREEMPT CONFIRMATION LIGHT, AS PER PLAN Section 21 - TRAFFIC SIGNALS (PART 3) - Totals Awd $235,866.00 2 $230,190.89 | 4 EACH | $850 | $608 |
| AA2 809E65990 ITS DEVICE, MISC.: HIGH-SPEED ETHERNET RADIO (UBIQ | 1 EACH | $2,500 | $10,650 |
| AA2 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN(CURRUS VISION) Section 22 - TRAFFIC SIGNALS ALTERNATES (PART 3) - Totals Awd $36,500.00 2 $26,387.50 | 1 EACH | $34,000 | $15,738 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $125 | $86.25 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,250 | $7,100 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $850 | $1,100 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.12 MILE | $2,900 | $2,900 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.18 MILE | $4,900 | $4,900 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.15 MILE | $3,900 | $3,900 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 137 FT | $2.50 | $2.50 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 53 FT | $2.65 | $2.65 |
| 616E10000 WATER Section 23 - MAINTENANCE OF TRAFFIC (PART 3) - Totals Awd $16,657.95 2 $17,387.95 | 10 MGAL | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →