ASD-Mohican State Park FY2026
ASD County · est $0.3M
Bid dateThursday, January 29—
Awarded toOHIO CONCRETE MAINTENANCE LLC$246,052
ASD County · est $0.3M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 839E29100 TRENCH DRAIN, TYPE A WITH PEDESTRIAN GRATE Section 3 - DRAINAGE - Totals Awd $67,400.70 2 $54,296.00 3 $93,631.82 | 66 FT | $750 | $50k | 20% |
| 847E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY, 1.50" THI | 460 SY | $85 | $39k | 16% |
| 847E50000 HAND CHIPPING | 240 SY | $110 | $26k | 11% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $35,300.00 2 $44,530.00 3 $36,104.74 | 1 LS | $20,000 | $20k | 8% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 Section 4 - PAVEMENT - Totals Awd $22,137.00 2 $23,227.00 3 $16,044.65 | 7 CY | $2,600 | $18k | 7% |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 97 FT | $103.1 | $10k | 4% |
| 614E12420 DETOUR SIGNING Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $10,000.00 2 $10,700.00 3 $5,468.91 | 1 LS | $10,000 | $10k | 4% |
| 608E52000 CURB RAMP | 377 SF | $25 | $9k | 4% |
| 847E30401 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN (MS | 373 SY | $25 | $9k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $8k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Catts Construction INC | R3Bcc Ohio INC | % of bid |
|---|---|---|---|---|---|
| 839E29100 TRENCH DRAIN, TYPE A WITH PEDESTRIAN GRATE Section 3 - DRAINAGE - Totals Awd $67,400.70 2 $54,296.00 3 $93,631.82 | 66 FT | $750 | $590 | $1,288 | 21% |
| 847E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY, 1.50" THI | 460 SY | $85.00 | $81.00 | $84.08 | 16% |
| 847E50000 HAND CHIPPING | 240 SY | $110 | $120 | $186 | 11% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $35,300.00 2 $44,530.00 3 $36,104.74 | 1 LS | $20,000 | $26,000 | $16,102 | 8% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 Section 4 - PAVEMENT - Totals Awd $22,137.00 2 $23,227.00 3 $16,044.65 | 7 CY | $2,600 | $2,875 | $2,100 | 8% |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 97 FT | $103 | $74.00 | $26.60 | 4% |
| 614E12420 DETOUR SIGNING Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $10,000.00 2 $10,700.00 3 $5,468.91 | 1 LS | $10,000 | $10,700 | $5,469 | 4% |
| 608E52000 CURB RAMP | 377 SF | $25.00 | $19.00 | $20.58 | 4% |
| 847E30401 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN (MS | 373 SY | $25.00 | $30.00 | $21.37 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $2,970 | $3,394 | 3% |
| 847E20200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 14 CY | $400 | $297 | $338 | 2% |
| 516E10901 ELASTOMERIC COMPRESSION SEAL, AS PER PLAN | 53 FT | $95.00 | $77.00 | $87.75 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $2,650 | $2,554 | 2% |
| 646E10200 CENTER LINE | 0.06 MILE | $67,000 | $46,488 | $27,137 | 2% |
| 611E98504 CATCH BASIN, NO. 2-2C | 1 EACH | $4,000 | $3,210 | $3,228 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50") | 167 SY | $23.00 | $18.00 | $7.75 | 2% |
| 202E98200 REMOVAL MISC.: TRENCH DRAIN | 66 FT | $50.00 | $48.00 | $25.80 | 1% |
| 202E98200 REMOVAL MISC.: COMPRESSION SEAL | 53 FT | $55.00 | $21.00 | $19.35 | 1% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $2,487.30 2 $2,848.59 3 $2,281.25 | 2,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $9,910 | $3,180 | 1% |
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Catts Construction INC | R3Bcc Ohio INC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 4 SY | $100 | $183 | $129 |
| 202E30000 WALK REMOVED | 117 SF | $15.00 | $12.00 | $4.30 |
| 203E20000 EMBANKMENT | 4 CY | $100 | $326 | $94.50 |
| 609E24000 CURB, TYPE 4-A Section 1 - ROADWAY - Totals Awd $13,080.00 2 $13,056.00 3 $10,046.43 | 11 FT | $100 | $223 | $80.97 |
| 659E00300 TOPSOIL | 2 CY | $100 | $50.00 | $80.25 |
| 659E10000 SEEDING AND MULCHING | 16 SY | $15.00 | $22.00 | $4.20 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1 SY | $15.00 | $38.00 | $10.50 |
| 659E15000 INTER-SEEDING | 1 SY | $15.00 | $38.00 | $10.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $750 | $7,466 | $2,100 |
| 659E31000 LIME | 0.01 ACRE | $780 | $23,373 | $1,050 |
| 659E35000 WATER | 0.1 MGAL | $20.00 | $122 | $10.50 |
| 611E04600 12" CONDUIT, TYPE C | 3 FT | $200 | $600 | $371 |
| 407E10000 TACK COAT | 16 GAL | $6.00 | $6.00 | $3.15 |
| 646E90000 PAVEMENT MARKING, MISC.: CROSSWALK LINE, 18", AS P Section 5 - TRAFFIC CONTROL - Totals Awd $5,292.00 2 $3,677.28 3 $3,549.68 | 24 FT | $53.00 | $37.00 | $80.06 |
| 847E30000 TEST SLAB | 1 LS | $500 | $2,200 | $2,412 |
| 847E30200 FULL DEPTH REPAIR | 2 CY | $500 | $3,000 | $1,482 |
| 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS Section 7 - STRUCTURE OVER 20 FOOT SPAN (SFN: 032694 - Totals Awd $90,355.00 2 $96,996.08 3 $108,165.27 | 48 FT | $10.00 | $45.71 | $25.32 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $100 | $1,000 | $3,625 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →