Figure 0.1 · BRIEFING
BID #260078 · ODOTRESULT · awarded Feb 19

CLI-SR 133-02.11

CLI County · est $1.4M

Bid dateThursday, February 19
Awarded toEAGLE BRIDGE CO$1.17M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

77ITEMS
  • Structures / Bridge30%
  • Earthwork12%
  • Guardrail & Barrier9%
  • Erosion & Landscaping8%
  • Pavement Marking8%
  • Maintaining Traffic6%
  • Other27%

Top items by winning bid

ItemQtyUnit priceExtended%
511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE142 CY$1,650$234k20%
507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI630 FT$115$72k6%
509E26000 GALVANIZED STEEL REINFORCEMENT35,628 LB$1.7$61k5%
517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING)126.13 FT$470$59k5%
202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN,1 LS$57,500$58k5%
526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER186 SY$300$56k5%
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $97,500.00 2 $91,400.00 3 $110,228.78 4 $98,500.001 LS$55,000$55k5%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)178 CY$235$42k4%
511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT18 CY$2,000$36k3%
514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL526 SF$60$32k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.

Rank 1Eagle Bridge CO$1.17MRank 2Double Z Construction Company$1.31MRank 3Sunesis Construction CO$1.38MRank 4Complete General Construction Company$1.42M
ItemQuantityR1Eagle Bridge COR2Double Z Construction CompanyR3Sunesis Construction COR4Complete General Construction Company
511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE142 CY$1,650$1,700$1,766$1,700
507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI630 FT$115$45.00$80.53$75.00
509E26000 GALVANIZED STEEL REINFORCEMENT35,628 LB$1.70$1.80$2.53$2.00
517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING)126.13 FT$470$475$492$505
202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN,1 LS$57,500$120,000$105,449$95,000
526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER186 SY$300$430$480$395
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $97,500.00 2 $91,400.00 3 $110,228.78 4 $98,500.001 LS$55,000$60,000$84,403$71,000
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)178 CY$235$262$262$262
511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT18 CY$2,000$1,600$3,711$1,900
514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL526 SF$60.00$60.00$60.00$125
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG88 CY$300$284$386$284
204E30020 GRANULAR MATERIAL, TYPE C335 CY$75.00$56.00$125$90.00
503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN1 LS$25,000$60,000$28,624$65,000
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$25,000$9,000$8,035$9,500
846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM23.74 CF$1,000$1,166$1,166$1,200
503E21300 UNCLASSIFIED EXCAVATION1 LS$22,500$20,000$15,556$20,000
304E20000 AGGREGATE BASE405 CY$55.00$90.00$119$95.00
505E11100 PILE DRIVING EQUIPMENT MOBILIZATION1 LS$20,000$20,000$4,391$17,000
526E90011 TYPE A INSTALLATION, AS PER PLAN80 FT$250$250$185$400
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$15,000$14,000$13,900$15,000
Show all 77 line items
ItemQuantityR1Eagle Bridge COR2Double Z Construction CompanyR3Sunesis Construction COR4Complete General Construction Company
201E11000 CLEARING AND GRUBBING1 LS$10,000$10,000$3,296$5,000
202E23000 PAVEMENT REMOVED516 SY$22.00$24.00$2.30$25.00
202E38000 GUARDRAIL REMOVED168.75 FT$4.00$2.00$22.49$2.00
202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN4 EACH$500$365$243$365
203E20000 EMBANKMENT72 CY$75.00$100$40.34$30.00
204E10000 SUBGRADE COMPACTION1,005 SY$6.00$7.00$8.10$9.00
204E13000 EXCAVATION OF SUBGRADE, 12" DEEP335 CY$30.00$35.00$58.20$45.00
204E50000 GEOTEXTILE FABRIC1,005 SY$1.75$1.50$2.43$10.00
209E15050 RESHAPING UNDER GUARDRAIL0.06 MILE$2,750$2,750$28,698$2,750
606E15050 GUARDRAIL, TYPE MGS18.75 FT$39.20$39.20$35.00$39.20
606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016)3 EACH$2,550$2,550$2,600$2,550
606E26550 ANCHOR ASSEMBLY, MGS TYPE T1 EACH$1,340$1,340$1,250$1,340
606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-24 EACH$2,630$2,630$2,600$2,630
878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER1 LS$10,000$7,334$3,667$12,000
202E23500 WEARING COURSE REMOVED140 SY$15.00$18.00$4.13$13.50
204E45000 PROOF ROLLING Section 1 - ROADWAY - Totals Awd $105,150.75 2 $101,033.00 3 $111,260.64 4 $121,177.502 HOUR$125$180$489$350
659E00300 TOPSOIL189 CY$15.00$45.00$29.33$25.00
659E10000 SEEDING AND MULCHING1,700 SY$3.00$5.00$4.21$5.20
659E14000 REPAIR SEEDING AND MULCHING85 SY$3.00$2.20$2.20$2.20
659E20000 COMMERCIAL FERTILIZER0.24 TON$1,000$1,250$1,250$1,250
659E31000 LIME0.35 ACRE$5.00$150$150$150
659E35000 WATER9.4 MGAL$10.00$1.00$1.00$1.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $18,525.75 2 $27,553.90 3 $23,249.27 4 $24,113.9010,000 EACH$1.00$1.00$1.00$1.00
601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER0.55 CY$250$500$1,284$1,900
602E20000 CONCRETE MASONRY0.21 CY$4,000$4,500$4,250$10,500
611E04400 12" CONDUIT, TYPE B102 FT$110$125$126$250
611E98150 CATCH BASIN, NO. 3 Section 3 - DRAINAGE - Totals Awd $21,197.50 2 $21,970.00 3 $22,969.90 4 $48,750.002 EACH$4,500$4,000$4,247$10,000
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(D=1.50")746 SY$9.50$13.00$8.35$13.00
407E20000 NON-TRACKING TACK COAT257 GAL$4.00$4.10$8.91$4.10
609E12000 COMBINATION CURB AND GUTTER, TYPE 2 Section 4 - PAVEMENT - Totals Awd $104,080.00 2 $124,709.70 3 $144,383.27 4 $128,834.7084 FT$65.00$70.00$85.40$95.00
621E00100 RPM10 EACH$317$317$317$317
621E54000 RAISED PAVEMENT MARKER REMOVED11 EACH$10.00$30.00$317$50.00
644E00104 EDGE LINE, 6"0.04 MILE$34,375$34,375$34,375$34,375
644E00300 CENTER LINE0.02 MILE$68,750$68,750$68,750$68,750
646E10010 EDGE LINE, 6"0.16 MILE$22,500$22,500$22,500$22,500
646E10200 CENTER LINE0.08 MILE$27,000$27,000$27,000$27,000
626E00116 BARRIER REFLECTOR, TYPE 5. Section 5 - TRAFFIC CONTROL - Totals Awd $11,926.40 2 $12,146.40 3 $15,387.00 4 $12,366.4011 EACH$12.40$12.40$20.00$12.40
614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST80 HOUR$60.00$60.00$68.65$90.00
614E12420 DETOUR SIGNING Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $17,300.00 2 $19,800.00 3 $14,432.00 4 $16,140.001 LS$12,500$15,000$8,940$8,940
202E22900 APPROACH SLAB REMOVED140 SY$50.00$50.00$30.91$75.00
507E00602 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE560 FT$8.00$60.00$47.75$45.00
510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS264 EACH$17.00$30.00$19.80$15.00
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)127 SY$38.00$38.00$36.50$38.00
512E33000 TYPE 2 WATERPROOFING14 SY$50.00$50.00$38.57$125
514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME541 SF$10.00$10.00$10.00$10.00
514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT449 SF$10.00$10.00$10.00$10.00
516E13200 1/2" PREFORMED EXPANSION JOINT FILLER172 SF$6.00$13.00$3.62$16.00
516E13600 1" PREFORMED EXPANSION JOINT FILLER108 SF$8.00$15.00$6.63$18.00
516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL84 FT$50.00$40.00$52.26$75.00
518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC55 CY$125$115$143$150
518E22300 SPECIAL - STEEL DRIP STRIP139 FT$16.00$20.00$37.90$15.25
518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE124 FT$12.00$13.00$7.82$12.00
518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI100 FT$25.00$15.00$19.12$15.00
523E20000 DYNAMIC LOAD TESTING4 EACH$2,500$3,680$4,631$6,100
507E93300 STEEL POINTS OR SHOES14 EACH$600$200$282$190
514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT Section 7 - STRUCTURE OVER 20 FOOT SPAN (CLI-133-021 - Totals Awd $792,165.70 2 $907,196.53 3 $937,951.02 4 $966,549.40449 SF$10.00$10.00$10.00$10.00
614E11000 MAINTAINING TRAFFIC1 LS$2,500$8,400$3,891$3,000

Project details

Description
CLI-SR 133-02.11
Type of work
Bridge

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →