SAN-SR 510-00.00 Rehab
SAN County · est $6.3M
Bid dateThursday, February 19—
Awarded toERIE BLACKTOP INC$5.65M
SAN County · est $6.3M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (4622 CY | $152 | $703k | 12% |
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (2455 CY | $245 | $601k | 11% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,522 CY | $148 | $521k | 9% |
| 204E60000 SPECIAL - GEOCELL, SUBGRADE, 4" | 46,221 SY | $10.25 | $474k | 8% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 7,704 CY | $59.75 | $460k | 8% |
| 304E20000 AGGREGATE BASE | 6,908 CY | $58.25 | $402k | 7% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $562,500.00 2 $471,522.50 3 $586,500.00 | 1 LS | $280,000 | $280k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $225,000 | $225k | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 7,704 CY | $22.85 | $176k | 3% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 121 CY | $1,290 | $156k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 85 more items below.
| Item | Quantity | R1Erie Blacktop INC | R2Vernon Nagel INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (4622 CY | $152 | $164 | $182 | 14% |
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (2455 CY | $245 | $228 | $275 | 12% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,522 CY | $148 | $180 | $179 | 11% |
| 204E60000 SPECIAL - GEOCELL, SUBGRADE, 4" | 46,221 SY | $10.25 | $11.00 | $6.40 | 10% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 7,704 CY | $59.75 | $72.00 | $70.00 | 9% |
| 304E20000 AGGREGATE BASE | 6,908 CY | $58.25 | $72.00 | $60.00 | 8% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $562,500.00 2 $471,522.50 3 $586,500.00 | 1 LS | $280,000 | $217,701 | $312,000 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $225,000 | $174,022 | $203,500 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 7,704 CY | $22.85 | $32.00 | $37.00 | 4% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 121 CY | $1,290 | $1,050 | $1,225 | 3% |
| 203E10000 EXCAVATION | 6,908 CY | $21.00 | $32.00 | $37.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (3") | 47,718 SY | $2.75 | $3.10 | $3.75 | 3% |
| 617E10100 COMPACTED AGGREGATE | 1,382 CY | $67.00 | $82.00 | $50.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 38,776 SY | $2.25 | $4.30 | $4.50 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 29,719 LB | $2.65 | $1.90 | $3.00 | 2% |
| 203E20000 EMBANKMENT Section 1 - ROADWAY - Totals Awd $1,172,464.30 2 $1,362,944.90 3 $1,355,017.15 | 1,555 CY | $48.00 | $28.00 | $100 | 2% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 2,238 FT | $27.30 | $26.00 | $26.00 | 1% |
| 605E31100 AGGREGATE DRAINS | 1,316 FT | $46.00 | $8.00 | $30.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 56 SNMT | $1,050 | $1,000 | $550 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 275 CY | $211 | $225 | $200 | 1% |
| Item | Quantity | R1Erie Blacktop INC | R2Vernon Nagel INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,055 SF | $3.10 | $3.50 | $2.95 |
| 202E32000 CURB REMOVED | 140 FT | $21.80 | $9.00 | $20.75 |
| 202E38000 GUARDRAIL REMOVED | 200 FT | $2.50 | $2.40 | $2.40 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 2,275 FT | $2.10 | $2.00 | $2.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $310 | $295 | $295 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 5 EACH | $173 | $165 | $165 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $84.00 | $80.00 | $80.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 1 EACH | $142 | $135 | $135 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 8 EACH | $78.75 | $75.00 | $75.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 31 STA | $42.00 | $67.00 | $40.00 |
| 209E60500 LINEAR GRADING | 14 MILE | $1,625 | $1,500 | $850 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 13.51 MILE | $1,625 | $60.00 | $650 |
| 606E15050 GUARDRAIL, TYPE MGS | 188 FT | $21.00 | $20.00 | $20.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,700 | $1,620 | $1,620 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,700 | $2,575 | $2,575 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 7 EACH | $2,600 | $2,480 | $2,480 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,390 | $1,320 | $1,320 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 3 EACH | $2,500 | $2,380 | $2,380 |
| 606E34601 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2, AS PER P | 1 EACH | $2,600 | $2,470 | $2,470 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,540 | $2,420 | $2,420 |
| 608E10000 4" CONCRETE WALK | 50 SF | $29.00 | $21.00 | $27.75 |
| 608E52000 CURB RAMP | 1,005 SF | $16.30 | $20.00 | $15.50 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $26,230 | $13,000 | $30,000 |
| 659E00300 TOPSOIL | 286.25 CY | $68.25 | $60.00 | $145 |
| 659E10000 SEEDING AND MULCHING | 2,581 SY | $3.70 | $1.65 | $2.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 67 SY | $3.70 | $1.65 | $3.00 |
| 659E15000 INTER-SEEDING | 67 SY | $1.05 | $1.00 | $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $840 | $850 | $800 |
| 659E35000 WATER | 7 MGAL | $1.05 | $1.00 | $0.50 |
| 670E00500 SLOPE EROSION PROTECTION | 1,245 SY | $5.25 | $1.80 | $2.20 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,050 | $2,900 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $18,025 | $1,240 | $13,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,135 | $14,400 | $18,250 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $92,309.31 2 $62,552.20 3 $105,343.15 | 20,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,150 | $610 | $1,100 |
| 611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $69,901.00 2 $17,418.00 3 $50,680.00 | 9 EACH | $785 | $630 | $1,000 |
| 253E02000 PAVEMENT REPAIR | 87 CY | $285 | $450 | $500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 6,600 SY | $3.25 | $2.00 | $3.00 |
| 407E10000 TACK COAT | 11,648 GAL | $2.55 | $2.50 | $2.30 |
| 407E20000 NON-TRACKING TACK COAT | 561 GAL | $2.55 | $2.50 | $2.50 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $400 | $650 | $200 |
| 442E90000 ASPHALT CONCRETE, MISC.: BUTT JOINT INTERSECTIONS | 36 CY | $775 | $750 | $1,025 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE Section 4 - PAVEMENT - Totals Awd $3,095,475.45 2 $3,460,348.80 3 $3,540,082.60 | 6,116 LB | $1.50 | $1.00 | $0.70 |
| 621E00100 RPM | 413 EACH | $45.30 | $43.50 | $43.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 203 EACH | $5.80 | $12.00 | $3.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, BI-DIRECTIONAL | 59 EACH | $13.65 | $13.00 | $13.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $26.25 | $25.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $78.75 | $75.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $26.25 | $25.00 | $25.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $158 | $150 | $150 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 13.57 MILE | $895 | $850 | $850 |
| 642E00300 CENTER LINE, TYPE 1 | 7.55 MILE | $895 | $850 | $850 |
| 644E00500 STOP LINE | 41 FT | $15.75 | $15.00 | $15.00 |
| 644E00620 CROSSWALK LINE, 12" | 193 FT | $6.30 | $6.00 | $6.00 |
| 644E01000 RAILROAD SYMBOL MARKING Section 5 - TRAFFIC CONTROL - Totals Awd $43,476.95 2 $42,818.50 3 $40,991.50 | 2 EACH | $840 | $800 | $800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $105 | $85.00 | $100 |
| 614E12420 DETOUR SIGNING | 1 LS | $9,450 | $9,000 | $9,000 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $201 | $192 | $192 |
| 614E12600 REPLACEMENT DRUM | 10 EACH | $58.80 | $56.00 | $56.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 14 MILE | $895 | $850 | $950 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 41 MILE | $735 | $700 | $650 |
| 900E00100 RAILROAD FLAGGING SERVICES Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $121,208.00 2 $115,020.00 3 $89,770.00 | 4,500 EACH | $1.00 | $1.00 | $1.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $57,750 | $130,000 | $60,000 |
| 202E22900 APPROACH SLAB REMOVED | 178 SY | $63.00 | $20.00 | $74.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 109 CY | $73.50 | $28.00 | $70.00 |
| 507E71200 SPECIAL - PILE ENCASEMENT | 72 FT | $236 | $280 | $250 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $2.65 | $2.25 | $2.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 392 EACH | $42.00 | $22.00 | $40.00 |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 16 CY | $1,035 | $900 | $985 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 72 SY | $26.25 | $10.00 | $25.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 50 SF | $21.00 | $12.00 | $20.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 50 SF | $26.25 | $16.00 | $25.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 74 FT | $52.50 | $22.00 | $50.00 |
| 516E31000 JOINT SEALER | 74 FT | $57.75 | $10.00 | $55.00 |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 108 FT | $480 | $458 | $458 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 29 CY | $99.75 | $95.00 | $95.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 106 FT | $15.75 | $20.00 | $15.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $15.75 | $18.00 | $15.00 |
| 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17") | 178 SY | $215 | $300 | $205 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 2 CY | $525 | $120 | $500 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA Section 7 - STRUCTURE REPAIR (SAN-510-0635) - Totals Awd $491,752.60 2 $489,760.10 3 $491,412.00 | 119 CY | $175 | $110 | $167 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $4,800 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $21,500 | $41,000 | $25,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $12,000 | $1,500 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $19,000 | $32,500 | $40,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →