Figure 0.1 · BRIEFING
BID #260103 · ODOTRESULT · awarded Feb 19

D01-BM FY26

D01 County · est $0.9M

Bid dateThursday, February 19
Awarded toBCC OHIO INC$815,071.57
read → connected → answeredcassandri

Project scope

Bid form · ODOT

57ITEMS
  • Structures / Bridge47%
  • Maintaining Traffic14%
  • Removal & Demolition7%
  • Earthwork5%
  • Concrete Paving5%
  • Asphalt Paving5%
  • Other16%

Top items by winning bid

ItemQtyUnit priceExtended%
614E11000 MAINTAINING TRAFFIC1 LS$63,545$64k8%
848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1")267 SY$228.03$61k7%
526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15")133 SY$452.39$60k7%
251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441)889 SY$63$56k7%
624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $128,083.37 2 $133,000.00 3 $140,000.00 4 $200,000.001 LS$54,476$54k7%
507E71200 SPECIAL - PILE ENCASEMENT192 FT$275.15$53k6%
507E71200 SPECIAL - PILE ENCASEMENT176 FT$275.94$49k6%
507E71200 SPECIAL - PILE ENCASEMENT176 FT$275.94$49k6%
848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR267 SY$177.5$47k6%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG79 CY$472.5$37k5%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.

Rank 1Bcc Ohio INC$815kRank 2Complete General Construction Company$873kRank 3Ohio Concrete Maintenance LLC$874kRank 4Eagle Bridge CO$1.03M
ItemQuantityR1Bcc Ohio INCR2Complete General Construction CompanyR3Ohio Concrete Maintenance LLCR4Eagle Bridge CO
614E11000 MAINTAINING TRAFFIC1 LS$63,545$85,000$40,000$130,000
848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1")267 SY$228$190$288$250
526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15")133 SY$452$450$375$500
251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441)889 SY$63.00$60.00$70.00$57.00
624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $128,083.37 2 $133,000.00 3 $140,000.00 4 $200,000.001 LS$54,476$40,000$85,000$50,000
507E71200 SPECIAL - PILE ENCASEMENT192 FT$275$300$275$315
507E71200 SPECIAL - PILE ENCASEMENT176 FT$276$300$250$325
507E71200 SPECIAL - PILE ENCASEMENT176 FT$276$300$250$325
848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR267 SY$178$160$179$300
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG79 CY$473$450$500$445
622E41100 PORTABLE BARRIER, UNANCHORED1,056 FT$30.07$29.00$30.00$25.00
614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I2.25 MILE$10,660$10,153$13,500$10,000
519E11900 SPECIAL - PATCHING CONCRETE STRUCTURE: ABUTMENT BA5 CY$4,758$5,900$4,000$9,000
452E18010 15" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P Section 3 - PAVEMENT - Totals Awd $89,469.80 2 $91,250.00 3 $109,425.00 4 $88,223.0085 SY$216$250$280$300
848E50000 HAND CHIPPING80 SY$193$95.00$130$90.00
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2"1,907 SY$7.35$7.00$7.75$6.75
253E02000 PAVEMENT REPAIR15 CY$893$850$925$435
848E50320 EXISTING CONCRETE OVERLAY REMOVED (T = 2") Section 6 - STRUCTURE REPAIR (HAN-15-22.46R, SFN 320 - Totals Awd $261,891.55 2 $241,389.43 3 $248,752.00 4 $319,320.50267 SY$49.82$35.00$42.00$55.00
601E34100 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER Section 5 - STRUCTURE REPAIR (DEF-15-10.52, SFN 2000 - Totals Awd $24,576.28 2 $60,250.00 3 $37,100.00 4 $61,075.0065 CY$194$185$175$350
202E22900 APPROACH SLAB REMOVED133 SY$95.04$80.00$60.00$80.00
Show all 57 line items
ItemQuantityR1Bcc Ohio INCR2Complete General Construction CompanyR3Ohio Concrete Maintenance LLCR4Eagle Bridge CO
201E11000 CLEARING AND GRUBBING Section 1 - ROADWAY - Totals Awd $2,580.00 2 $5,000.00 3 $5,000.00 4 $10,000.001 LS$2,580$5,000$5,000$10,000
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.00 3 $1,000.00 4 $1,000.001,000 EACH$1.00$1.00$1.00$1.00
202E23000 PAVEMENT REMOVED85 SY$14.57$40.00$100$45.00
204E10000 SUBGRADE COMPACTION85 SY$5.16$6.00$12.00$20.00
407E20000 NON-TRACKING TACK COAT153 GAL$1.05$1.00$1.25$3.00
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST15 HOUR$88.20$95.00$120$140
614E11630 INCREASED BARRIER DELINEATION200 FT$1.85$2.00$3.00$1.75
614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS$2,184$2,500$3,750$2,281
614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY)22 EACH$13.37$13.00$12.00$12.00
614E13350 OBJECT MARKER, ONE WAY22 EACH$21.93$21.00$23.00$20.00
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN4 SNMT$1,007$960$1,200$1,000
614E21400 WORK ZONE CENTER LINE, CLASS II0.8 MILE$2,730$2,600$1,400$2,600
614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I2,860 FT$1.03$1.00$5.00$1.50
616E10000 WATER6 MGAL$2.48$115$20.00$20.00
618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE)5,720 FT$1.21$1.00$1.75$2.25
808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $132,789.18 2 $128,183.25 3 $161,145.50 4 $131,862.254 SNMT$654$725$900$850
512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS43 SY$43.56$75.00$75.00$75.00
519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN180 SF$55.90$250$125$195
509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN947 LB$1.83$2.69$2.00$2.50
510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT190 EACH$29.88$20.00$25.00$40.00
512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS20 SY$42.66$100$150$100
516E13200 1/2" PREFORMED EXPANSION JOINT FILLER39 SF$7.41$13.00$20.00$7.00
516E31010 2" DEEP JOINT SEALER112 FT$24.99$25.00$10.00$15.00
518E22300 SPECIAL - STEEL DRIP STRIP150 FT$18.76$25.00$27.00$20.00
519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN26 SF$155$300$150$275
848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE5 CY$525$250$400$275
848E50100 TEST SLAB1 LS$3,537$1,800$600$500
848E50200 FULL-DEPTH REPAIR5 CY$783$950$500$500
512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS31 SY$42.66$75.00$75.00$75.00
519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN Section 7 - STRUCTURE REPAIR (VAN-224-8.13, SFN 8102 - Totals Awd $53,921.16 2 $67,725.00 3 $52,625.00 4 $68,975.0042 SF$96.03$300$150$225
512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS38 SY$42.66$75.00$75.00$75.00
519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN14 SF$155$350$200$425
843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA Section 8 - STRUCTURE REPAIR (VAN-224-8.38, SFN 8102 - Totals Awd $60,425.10 2 $70,950.00 3 $57,450.00 4 $77,960.0052 SF$155$200$150$230
512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS38 SY$42.66$75.00$75.00$75.00
512E10600 CONCRETE REPAIR BY EPOXY INJECTION20 FT$100$300$100$160
519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN Section 9 - STRUCTURE REPAIR (VAN-224-8.65, SFN 8102 - Totals Awd $60,335.13 2 $73,950.00 3 $61,400.00 4 $74,030.0025 SF$155$300$150$300
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$10,062$8,000$15,000$20,000

Project details

Description
D01-BM FY26
Type of work
Bridge

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →