MRW-US 42-00.00
MRW County · est $3.7M
Bid dateThursday, March 12—
Awarded toKOKOSING CONSTRUCTION COMPANY INC$3.14M
MRW County · est $3.7M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 8,401 CY | $205 | $1.72M | 55% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 10,915 SY | $29 | $317k | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 206,470 SY | $1 | $206k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $170,867 | $171k | 5% |
| 624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $343,867.00 2 $253,939.03 | 1 LS | $155,000 | $155k | 5% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 200 CY | $345 | $69k | 2% |
| 617E10100 COMPACTED AGGREGATE | 1,505 CY | $40 | $60k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 17,552 GAL | $2.75 | $48k | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,937.5 FT | $19.6 | $38k | 1% |
| 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL | 4 EACH | $9,250 | $37k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 49 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC | % of bid |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 8,401 CY | $205 | $200 | 57% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 10,915 SY | $29.00 | $39.00 | 11% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 206,470 SY | $1.00 | $1.25 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $170,867 | $121,000 | 6% |
| 624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $343,867.00 2 $253,939.03 | 1 LS | $155,000 | $115,400 | 5% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 200 CY | $345 | $450 | 2% |
| 617E10100 COMPACTED AGGREGATE | 1,505 CY | $40.00 | $75.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 17,552 GAL | $2.75 | $3.50 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,937.5 FT | $19.60 | $21.50 | 1% |
| 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL | 4 EACH | $9,250 | $9,250 | 1% |
| 608E10000 4" CONCRETE WALK | 1,145 SF | $32.00 | $13.50 | 1% |
| 621E00100 RPM | 889 EACH | $33.95 | $33.95 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 8 EACH | $2,520 | $2,550 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 25.4 MILE | $675 | $675 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 23.7 MILE | $650 | $650 | 1% |
| 617E20000 SHOULDER PREPARATION | 26,447 SY | $0.50 | $0.50 | 0% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 23.7 MILE | $550 | $550 | 0% |
| 203E20001 EMBANKMENT, AS PER PLAN | 176 CY | $73.50 | $40.00 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,500 | $9,039 | 0% |
| 608E52000 CURB RAMP | 362 SF | $32.00 | $50.00 | 0% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 244 SY | $20.00 | $17.50 |
| 202E30001 WALK REMOVED, AS PER PLAN | 464 SF | $4.00 | $10.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 1,537.5 FT | $2.00 | $2.80 |
| 202E42011 ANCHOR ASSEMBLY REMOVED, TYPE E, AS PER PLAN | 4 EACH | $160 | $150 |
| 202E98100 REMOVAL MISC.: BOLLARD | 4 EACH | $300 | $205 |
| 209E60200 LINEAR GRADING | 23.78 STA | $50.00 | $100 |
| 517E76300 RAILING, MISC.: DEEP BEAM RAIL REPLACEMENT | 50 FT | $18.00 | $12.50 |
| 606E35151 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4, AS PER P | 4 EACH | $1,325 | $1,400 |
| 609E26000 CURB, TYPE 6 | 10 FT | $72.00 | $150 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE Section 1 - ROADWAY - Totals Awd $144,155.00 2 $130,690.15 | 4 EACH | $1,275 | $825 |
| 659E00300 TOPSOIL | 158 CY | $70.00 | $100 |
| 659E10000 SEEDING AND MULCHING | 1,433 SY | $2.95 | $5.04 |
| 659E20000 COMMERCIAL FERTILIZER | 0.31 TON | $1,015 | $839 |
| 659E31000 LIME | 0.3 ACRE | $116 | $158 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $16,646.70 2 $24,339.77 | 1,000 EACH | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $3,900.00 2 $6,000.00 | 6 EACH | $650 | $1,000 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441), 6.25", COMMER | 13 SY | $275 | $350 |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 300 SY | $28.00 | $40.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 79 SY | $77.00 | $155 |
| 617E25000 WATER | 10 MGAL | $1.00 | $1.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 2.99 MILE | $2,300 | $2,250 |
| 874E21000 LONGITUDINAL JOINT PREPARATION Section 4 - PAVEMENT - Totals Awd $2,465,630.50 2 $2,681,520.50 | 2.99 MILE | $1,600 | $1,500 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE Section 5 - WATER WORK - Totals Awd $3,300.00 2 $4,500.00 | 6 EACH | $550 | $750 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 889 EACH | $1.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 50 EACH | $13.00 | $12.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $15.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 30 FT | $17.50 | $25.00 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $45.00 | $50.00 |
| 630E80100 SIGN, FLAT SHEET | 20 SF | $27.50 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $25.00 | $25.00 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $150 | $150 |
| 642E00300 CENTER LINE, TYPE 1 | 12.7 MILE | $680 | $680 |
| 644E00400 CHANNELIZING LINE, 8" | 460 FT | $2.65 | $2.65 |
| 644E00500 STOP LINE | 558 FT | $9.25 | $9.25 |
| 644E00620 CROSSWALK LINE, 12" | 1,310 FT | $3.80 | $3.80 |
| 644E00630 CROSSWALK LINE, 24" | 100 FT | $9.50 | $9.50 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $860 | $860 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $860 | $860 |
| 644E01200 PARKING LOT STALL MARKING | 1,700 FT | $2.25 | $2.25 |
| 644E01300 LANE ARROW | 4 EACH | $100 | $100 |
| 644E20800 YIELD LINE Section 6 - TRAFFIC CONTROL - Totals Awd $114,826.05 2 $118,502.05 | 28 FT | $14.50 | $14.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $105 | $85.00 |
| 614E12461 WORK ZONE MARKING SIGN, AS PER PLAN | 66 EACH | $75.00 | $85.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $38,316.60 2 $38,656.60 | 558 FT | $2.70 | $2.70 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT Section 8 - STRUCTURE REPAIR (MRW-42-9.31, SFN 59005 - Totals Awd $4,654.80 2 $5,040.00 | 180 FT | $25.86 | $28.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT Section 9 - STRUCTURE REPAIR (MRW-42-10.86, SFN 5900 - Totals Awd $3,516.96 2 $3,808.00 | 136 FT | $25.86 | $28.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $4,000 | $3,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $1,500 | $5,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →