PIC-US 23-16.94
PIC County · est $0.7M
Bid dateThursday, April 9—
Awarded toSHELLY COMPANY$594,874.8
PIC County · est $0.7M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (757 CY | $206.75 | $157k | 26% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 649 CY | $240 | $156k | 26% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 15,574 SY | $4.2 | $65k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 7% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 86 CY | $323 | $28k | 5% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $66,000.00 2 $90,008.21 | 1 LS | $20,000 | $20k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 2,044 SY | $9 | $18k | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $90 | $18k | 3% |
| 874E20000 LONGITUDINAL JOINT PREPARATION Section 2 - PAVEMENT - Totals Awd $462,043.65 2 $549,799.05 | 9,079 FT | $1.85 | $17k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 2,357 GAL | $4.1 | $10k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (757 CY | $207 | $252 | 28% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 649 CY | $240 | $292 | 27% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 15,574 SY | $4.20 | $4.50 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $47,008 | 7% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 86 CY | $323 | $500 | 5% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $66,000.00 2 $90,008.21 | 1 LS | $20,000 | $35,000 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 2,044 SY | $9.00 | $13.50 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $90.00 | $110 | 3% |
| 874E20000 LONGITUDINAL JOINT PREPARATION Section 2 - PAVEMENT - Totals Awd $462,043.65 2 $549,799.05 | 9,079 FT | $1.85 | $2.00 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 2,357 GAL | $4.10 | $2.65 | 2% |
| 621E00100 RPM | 125 EACH | $49.00 | $50.00 | 1% |
| 807E14200 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CEN | 0.69 MILE | $8,510 | $8,510 | 1% |
| 617E10100 COMPACTED AGGREGATE | 8 CY | $515 | $400 | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 649 CY | $6.25 | $1.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $925 | $1,100 | 1% |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 510 FT | $7.25 | $7.25 | 1% |
| 617E20000 SHOULDER PREPARATION | 148 SY | $24.00 | $4.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $3,000 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,000 | $5,000 | 1% |
| 644E00500 STOP LINE | 353 FT | $8.00 | $8.00 | 0% |
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC |
|---|---|---|---|
| 832E30000 EROSION CONTROL Section 1 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.00 | 1,000 EACH | $1.00 | $1.00 |
| 617E25000 WATER | 1 MGAL | $1.00 | $5.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 125 EACH | $4.00 | $1.00 |
| 644E00104 EDGE LINE, 6" | 0.04 MILE | $6,500 | $6,500 |
| 644E00300 CENTER LINE | 0.08 MILE | $10,360 | $10,360 |
| 644E00404 CHANNELIZING LINE, 12" | 30 FT | $3.00 | $3.00 |
| 644E00630 CROSSWALK LINE, 24" | 287 FT | $7.50 | $7.50 |
| 644E01300 LANE ARROW | 20 EACH | $95.00 | $95.00 |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 0.28 MILE | $6,360 | $6,360 |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 0.81 MILE | $2,000 | $2,000 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 568 FT | $3.50 | $3.50 |
| 850E10000 GROOVING FOR 4" RECESSED PAVEMENT MARKING | — | $1,615 | $1,615 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1,615 | $1,615 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING Section 3 - TRAFFIC CONTROL - Totals Awd $34,877.15 2 $34,627.15 | — | $2.20 | $2.20 |
| 614E12460 WORK ZONE MARKING SIGN | 12 EACH | $125 | $125 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.42 MILE | $500 | $500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.24 MILE | $850 | $850 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.28 MILE | $750 | $750 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,136 FT | $0.85 | $0.85 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 628 FT | $2.80 | $2.80 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 304 FT | $1.50 | $1.50 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $30,954.00 2 $35,654.00 | 40 EACH | $65.00 | $65.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →