Skip to content
Figure 0.1 · BRIEFING
BID #260137 · ODOTRESULT · awarded Mar 12

D04-CS FY2026

D04 County · est $1.4M

Bid dateThursday, March 12
Awarded toTHE AERO-MARK COMPANY LLC$1.18M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

15ITEMS
  • Maintaining Traffic40%
  • Pavement Marking27%
  • Mobilization & General20%
  • Asphalt Paving13%

Top items by winning bid

ItemQtyUnit priceExtended%
423E00250 CRACK SEALING, TYPE IV Section 1 - PAVEMENT - Totals Awd $1,131,426.64 2 $971,049.00 3 $1,596,088.203,180,196 SY$0.34$1.08M91%
423E00154 CRACK SEALING, TYPE V TYPE V (MASTIC)44,000 LB$1.14$50k4%
624E15001 MOBILIZATION, AS PER PLAN Section 4 - INCIDENTALS - Totals Awd $27,913.36 2 $464,031.25 3 $147,600.0034 EACH$500$17k1%
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST150 HOUR$65$10k1%
642E00114 EDGE LINE, 6", TYPE 1A10 MILE$550$6k0%
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$5,313$5k0%
614E11001 MAINTAINING TRAFFIC, AS PER PLAN1 LS$5,000$5k0%
642E00214 LANE LINE, 6", TYPE 1A10 MILE$225$2k0%
642E00310 CENTER LINE, TYPE 1A5 MILE$450$2k0%
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN Section 3 - MAINTENANCE OF TRAFFIC - Totals Awd $11,750.00 2 $13,500.00 3 $29,750.0020 SNMT$100$2k0%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 15items by winning bid’s extended amount.

Rank 1The Aero-mark Company LLC$1.18MRank 2Annseal INC$1.45MRank 3Scodeller Construction INC$1.80M
ItemQuantityR1The Aero-mark Company LLCR2Annseal INCR3Scodeller Construction INC
423E00250 CRACK SEALING, TYPE IV Section 1 - PAVEMENT - Totals Awd $1,131,426.64 2 $971,049.00 3 $1,596,088.203,180,196 SY$0.34$0.25$0.45
423E00154 CRACK SEALING, TYPE V TYPE V (MASTIC)44,000 LB$1.14$4.00$3.75
624E15001 MOBILIZATION, AS PER PLAN Section 4 - INCIDENTALS - Totals Awd $27,913.36 2 $464,031.25 3 $147,600.0034 EACH$500$1,635$1,800
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST150 HOUR$65.00$80.00$105
642E00114 EDGE LINE, 6", TYPE 1A10 MILE$550$100$850
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$5,313$8,932$6,000
614E11001 MAINTAINING TRAFFIC, AS PER PLAN1 LS$5,000$369,509$72,000
642E00214 LANE LINE, 6", TYPE 1A10 MILE$225$100$850
642E00310 CENTER LINE, TYPE 1A5 MILE$450$100$1,200
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN Section 3 - MAINTENANCE OF TRAFFIC - Totals Awd $11,750.00 2 $13,500.00 3 $29,750.0020 SNMT$100$75.00$700
642E00414 CHANNELIZING LINE, 12", TYPE 1A120 FT$7.00$0.45$2.00
642E00410 CHANNELIZING LINE, 8", TYPE 1A120 FT$6.75$0.45$1.50
642E01516 DOTTED LINE, 6", TYPE 1A Section 2 - TRAFFIC CONTROL - Totals Awd $12,910.00 2 $2,716.00 3 $24,440.00120 FT$5.50$0.45$1.50
642E00510 STOP LINE, TYPE 1A120 FT$5.00$0.45$7.00
619E16010 FIELD OFFICE, TYPE B12 MNTH$50.00$2,500$700

Project details

Description
D04-CS FY2026
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →