ALL-Lafayette Improvements
ALL County · est $1.5M
Bid dateThursday, March 26—
Awarded toR D JONES EXCAVATING INC$1.19M
ALL County · est $1.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E10000 4" CONCRETE WALK | 16,694 SF | $7.75 | $129k | 11% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 525 CY | $236 | $124k | 10% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $141,560.00 2 $151,250.00 | 1 LS | $89,260 | $89k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 275 CY | $222 | $61k | 5% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,230 CY | $45 | $55k | 5% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 250 CY | $207 | $52k | 4% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 1,189 FT | $34 | $40k | 3% |
| 304E20000 AGGREGATE BASE | 883 CY | $45 | $40k | 3% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,741 SF | $19.5 | $34k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (160 CY | $209 | $33k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1R D Jones Excavating INC | R2Fenson Contracting LLC | % of bid |
|---|---|---|---|---|
| 608E10000 4" CONCRETE WALK | 16,694 SF | $7.75 | $10.00 | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 525 CY | $236 | $280 | 14% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $141,560.00 2 $151,250.00 | 1 LS | $89,260 | $40,000 | 10% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 275 CY | $222 | $220 | 7% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,230 CY | $45.00 | $55.00 | 6% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 250 CY | $207 | $290 | 6% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 1,189 FT | $34.00 | $33.00 | 4% |
| 304E20000 AGGREGATE BASE | 883 CY | $45.00 | $57.00 | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,741 SF | $19.50 | $28.00 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (160 CY | $209 | $250 | 4% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 285 SY | $105 | $122 | 3% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 9 EACH | $2,950 | $4,400 | 3% |
| 638E01710 8" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS | 200 FT | $125 | $230 | 3% |
| 202E23000 PAVEMENT REMOVED | 3,857 SY | $6.45 | $10.00 | 3% |
| 202E30000 WALK REMOVED | 15,018 SF | $1.55 | $2.50 | 3% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 277 SY | $82.75 | $100 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $22,700 | $25,000 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1 1/2" | 9,303 SY | $2.40 | $2.50 | 2% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,230 CY | $18.00 | $18.00 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 492 FT | $42.00 | $110 | 2% |
| Item | Quantity | R1R D Jones Excavating INC | R2Fenson Contracting LLC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,550 | $30,000 |
| 202E32000 CURB REMOVED | 380 FT | $3.50 | $20.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 668 FT | $15.00 | $50.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 80 FT | $15.00 | $85.00 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $250 | $750 |
| 202E58100 CATCH BASIN REMOVED | 9 EACH | $250 | $750 |
| 203E10000 EXCAVATION | 305.5 CY | $18.50 | $40.00 |
| 203E20000 EMBANKMENT | 23.9 CY | $35.00 | $200 |
| 204E10000 SUBGRADE COMPACTION | 4,261 SY | $3.55 | $2.50 |
| 204E45000 PROOF ROLLING | 2 HOUR | $185 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 3,691 SY | $2.45 | $2.00 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $2,000 | $1,500 |
| 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET Section 1 - ROADWAY - Totals Awd $377,601.30 2 $556,727.50 | 20 EACH | $950 | $2,500 |
| 659E00300 TOPSOIL | 193 CY | $45.00 | $90.00 |
| 659E10000 SEEDING AND MULCHING | 1,736 SY | $3.50 | $9.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.24 TON | $850 | $950 |
| 659E35000 WATER | 9.5 MGAL | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $30,060.00 2 $48,231.50 | 15,000 EACH | $1.00 | $1.00 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 395 FT | $25.00 | $22.00 |
| 611E00406 4" CONDUIT, TYPE F | 30 FT | $45.00 | $22.00 |
| 611E01800 8" CONDUIT, TYPE B | 11 FT | $85.00 | $105 |
| 611E07400 18" CONDUIT, TYPE B | 232 FT | $48.00 | $145 |
| 611E16400 36" CONDUIT, TYPE B | 80 FT | $120 | $205 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN NO BACK | 1 EACH | $2,950 | $4,100 |
| 611E99574 MANHOLE, NO. 3 Section 3 - DRAINAGE - Totals Awd $87,710.00 2 $167,365.00 | 1 EACH | $4,650 | $9,000 |
| 254E01600 PATCHING PLANED SURFACE | 182 SY | $10.00 | $13.50 |
| 407E20000 NON-TRACKING TACK COAT | 875 GAL | $3.00 | $3.00 |
| 609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $380,796.45 2 $431,427.50 | 71 FT | $39.00 | $50.00 |
| 638E04900 1" COPPER SERVICE BRANCH | 400 FT | $50.00 | $75.00 |
| 638E10600 FIRE HYDRANT AND GATE VALVE REMOVED AND RESET | 3 EACH | $2,650 | $3,000 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $500 | $950 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 7 EACH | $500 | $300 |
| 638E11100 METER AND CHAMBER REMOVED AND RESET Section 5 - WATER WORK - Totals Awd $64,500.00 2 $101,300.00 | 6 EACH | $1,175 | $2,050 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 377 FT | $21.52 | $14.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 80.5 FT | $21.52 | $16.00 |
| 630E08600 SIGN POST REFLECTOR | 21 EACH | $76.60 | $50.00 |
| 630E80100 SIGN, FLAT SHEET | 206.25 SF | $25.11 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 55 EACH | $26.41 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 35 EACH | $35.21 | $30.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.58 MILE | $2,500 | $2,800 |
| 643E00500 STOP LINE | 27 FT | $18.00 | $20.00 |
| 643E00620 CROSSWALK LINE, 12" Section 6 - TRAFFIC CONTROL - Totals Awd $29,744.84 2 $28,371.50 | 1,213 FT | $7.00 | $8.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 93 CY | $60.00 | $72.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 100 CY | $60.00 | $82.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $9,950 | $9,000 |
| 616E10000 WATER Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $73,380.00 2 $96,796.00 | 10 MGAL | $10.00 | $40.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $1,500 | $6,250 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $50,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $6,300 | $5,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $6,300 | $5,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →