Bridge Repair
plans pulled by 2 GCs
plans pulled by 2 GCs
2 subs pulled plans · Bcc Ohio INC wins 54% of OH bridge bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,410 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans2 subs
Likely also biddingOH bridge regulars · 8
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH bridge work in the last 5 years, ranked by frequency. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
13 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 642E00104 | EDGE LINE, 6", TYPE 1 | 6.33 MILE |
| 642E00204 | LANE LINE, 6", TYPE 1 | 2.19 MILE |
| 642E00300 | CENTER LINE, TYPE 1 | 1.49 MILE |
| 642E00404 | CHANNELIZING LINE, 12", TYPE 1 | 906 FT |
| 642E00700 | TRANSVERSE/DIAGONAL LINE, TYPE 1 | 784 FT |
| 642E01300 | LANE ARROW, TYPE 1 | 10 EACH |
| 100E00300 | PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY AND PROPERTY DAMAGE LIABILITY INSURANCE | Lump sum |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |
| 614E18601 | PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT |
| 900E00100 | RAILROAD FLAGGING SERVICES | 17,400 EACH |
| 512E73501 | TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RESIN, AS PER PLAN | 74,913 SY |