Two Lane Resurfacing
Columbiana County · plans pulled by 4 GCs
Columbiana County · plans pulled by 4 GCs
3 primes + 1 sub pulled plans · Shelly & Sands INC finishes low on 52% of OH pavement bids it enters
If your number lands…historical low-bid frequency, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and finished low (n=8,848 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans3 primes · 1 sub
Likely also biddingOH pavement regulars · 5
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH pavement work in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Low-bid rate is historical — the share of bids where that firm finished rank one, not a verified award or a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
30 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 251E01042 | PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BASE) | 20 CY |
| 253E02000 | PAVEMENT REPAIR | 60 CY |
| 254E01000 | PAVEMENT PLANING, ASPHALT CONCRETE, 2.25" | 66,995 SY |
| 407E10000 | TACK COAT | 9,379 GAL |
| 408E10001 | PRIME COAT, AS PER PLAN | 3,750 GAL |
| 441E10100 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG70-22M | 2,399 CY |
| 441E50200 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448) | 1,862 CY |
| 441E70501 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), (DRIVEWAYS), AS PER PLAN | 30 CY |
| 617E10101 | COMPACTED AGGREGATE, AS PER PLAN | 325 CY |
| 617E20001 | SHOULDER PREPARATION, AS PER PLAN | 10,271 SY |
| 202E23500 | WEARING COURSE REMOVED | 861 SY |
| 209E72051 | PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLAN | 8.82 MILE |
| 623E39601 | MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH |
| 690E50100 | SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH |
| 690E50200 | SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH |
| 621E00100 | RPM | 576 EACH |
| 621E54000 | RAISED PAVEMENT MARKER REMOVED | 576 EACH |
| 646E10010 | EDGE LINE, 6" | 8.7 MILE |
| 646E10200 | CENTER LINE | 4.35 MILE |
| 646E10400 | STOP LINE | 28 FT |
| 614E12460 | WORK ZONE MARKING SIGN | 21 EACH |
| 614E21500 | WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 4.38 MILE |
| 614E21550 | WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.38 MILE |
| 614E26610 | WORK ZONE STOP LINE, CLASS III, 642 PAINT | 28 FT |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 619E16010 | FIELD OFFICE, TYPE B | 3 MNTH |
| 624E10000 | MOBILIZATION | Lump sum |
| 832E30000 | EROSION CONTROL | 1,000 EACH |
| 605E31100 | AGGREGATE DRAINS | 60 FT |