Four Lane Resurfacing
Hamilton County · plans pulled by 2 GCs
Hamilton County · plans pulled by 2 GCs
1 prime + 1 sub pulled plans · Shelly & Sands INC finishes low on 52% of OH pavement bids it enters
If your number lands…historical low-bid frequency, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and finished low (n=8,848 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans1 prime · 1 sub
Likely also biddingOH pavement regulars · 7
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH pavement work in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Low-bid rate is historical — the share of bids where that firm finished rank one, not a verified award or a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
35 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 621E00100 | RPM | 79 EACH |
| 621E54000 | RAISED PAVEMENT MARKER REMOVED | 79 EACH |
| 644E00104 | EDGE LINE, 6" | 1.72 MILE |
| 644E00204 | LANE LINE, 6" | 0.49 MILE |
| 644E00300 | CENTER LINE | 1.05 MILE |
| 644E00400 | CHANNELIZING LINE, 8" | 541 FT |
| 644E00500 | STOP LINE | 350 FT |
| 644E00620 | CROSSWALK LINE, 12" | 1,250 FT |
| 644E00700 | TRANSVERSE/DIAGONAL LINE | 250 FT |
| 644E01300 | LANE ARROW | 8 EACH |
| 644E01510 | DOTTED LINE, 6" | 55 FT |
| 614E11110 | LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSISTANCE | 40 HOUR |
| 614E20560 | WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.49 MILE |
| 614E21550 | WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 6.05 MILE |
| 614E22360 | WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.72 MILE |
| 614E23680 | WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PAINT | 541 FT |
| 614E26610 | WORK ZONE STOP LINE, CLASS III, 642 PAINT | 36 FT |
| 614E27250 | WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAINT | 1,250 FT |
| 614E30650 | WORK ZONE ARROW, CLASS III, 642 PAINT | 8 EACH |
| 253E02000 | PAVEMENT REPAIR | 110 CY |
| 254E01000 | PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 30,985 SY |
| 254E01600 | PATCHING PLANED SURFACE | 311 SY |
| 407E20000 | NON-TRACKING TACK COAT | 2,789 GAL |
| 442E20000 | ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (448) | 1,722 CY |
| 202E30000 | WALK REMOVED | 68 SF |
| 202E32500 | CURB AND GUTTER REMOVED | 10 FT |
| 608E53020 | DETECTABLE WARNING | 68 SF |
| 609E23000 | COMBINATION CURB AND GUTTER, TYPE 4 | 10 FT |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 623E10001 | CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER PLAN | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |
| 611E98630 | CATCH BASIN ADJUSTED TO GRADE | 40 EACH |
| 611E99654 | MANHOLE ADJUSTED TO GRADE | 52 EACH |
| 638E10800 | VALVE BOX ADJUSTED TO GRADE | 33 EACH |