| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $45k | 15% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 4,829 SF | $8 | $39k | 13% |
| 202E30001 WALK REMOVED, AS PER PLAN | 5,219 SF | $4 | $21k | 7% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $20k | 7% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $101,500.00 2 $106,045.11 3 $81,500.00 | 1 LS | $20,000 | $20k | 7% |
| 202E23000 PAVEMENT REMOVED | 528 SY | $35 | $18k | 6% |
| 609E24510 CURB, TYPE 4-C Section 4 - PAVEMENT - Totals Awd $44,898.00 2 $77,929.92 3 $89,464.00 | 464 FT | $37 | $17k | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $15k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 15 CY | $860 | $13k | 4% |
| 608E52001 CURB RAMP, AS PER PLAN Section 1 - ROADWAY - Totals Awd $107,162.00 2 $171,512.52 3 $257,283.00 | 1,142 SF | $11 | $13k | 4% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 29 more items below.
| Item | Quantity | R1Bog Construction INC | R2Madex Construction CO | R3Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $34,837 | $36,000 | 17% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 4,829 SF | $8.00 | $18.53 | $21.00 | 14% |
| 202E30001 WALK REMOVED, AS PER PLAN | 5,219 SF | $4.00 | $2.14 | $10.00 | 8% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $18,937 | $16,500 | 7% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $101,500.00 2 $106,045.11 3 $81,500.00 | 1 LS | $20,000 | $34,992 | $10,000 | 7% |
| 202E23000 PAVEMENT REMOVED | 528 SY | $35.00 | $32.94 | $45.00 | 7% |
| 609E24510 CURB, TYPE 4-C Section 4 - PAVEMENT - Totals Awd $44,898.00 2 $77,929.92 3 $89,464.00 | 464 FT | $37.00 | $78.74 | $76.00 | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $14,595 | $10,000 | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 15 CY | $860 | $1,158 | $2,000 | 5% |
| 608E52001 CURB RAMP, AS PER PLAN Section 1 - ROADWAY - Totals Awd $107,162.00 2 $171,512.52 3 $257,283.00 | 1,142 SF | $11.00 | $28.95 | $36.00 | 5% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $16,090.00 2 $14,605.59 3 $18,880.00 | 10,000 EACH | $1.00 | $1.00 | $1.00 | 4% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 5 CY | $2,000 | $3,474 | $3,000 | 4% |
| 608E15001 8" CONCRETE WALK, AS PER PLAN | 339 SF | $16.00 | $23.16 | $46.00 | 2% |
| 304E20000 AGGREGATE BASE | 23 CY | $210 | $289 | $400 | 2% |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 179 SY | $25.00 | $1.58 | $20.00 | 2% |
| 204E10000 SUBGRADE COMPACTION | 852 SY | $4.00 | $5.79 | $9.00 | 1% |
| 646E20300 LANE ARROW Section 5 - TRAFFIC CONTROL - Totals Awd $14,872.50 2 $16,033.21 3 $21,974.00 | 9 EACH | $350 | $405 | $200 | 1% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.3 MILE | $9,000 | $18,526 | $17,000 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $2,219 | $100 | 1% |
| 202E32000 CURB REMOVED | 285 FT | $8.00 | $17.37 | $50.00 | 1% |
| Item | Quantity | R1Bog Construction INC | R2Madex Construction CO | R3Craig Edward Susany INC |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 4 CY | $500 | $70.53 | $50.00 |
| 203E20000 EMBANKMENT | 2 CY | $500 | $86.84 | $500 |
| 601E28101 DUMPED ROCK FILL, AS PER PLAN | 4 CY | $150 | $579 | $190 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $89.47 | $150 |
| 659E00300 TOPSOIL | 20 CY | $40.00 | $86.84 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 9 SY | $10.00 | $1.58 | $19.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $1,000 | $2,316 | $2,000 |
| 659E31000 LIME | 0.04 ACRE | $100 | $579 | $700 |
| 659E35000 WATER | 1 MGAL | $1.00 | $7.53 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $750.00 2 $2,894.74 3 $1,000.00 | 1 EACH | $750 | $2,895 | $1,000 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 36 FT | $25.00 | $28.95 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 13 FT | $27.00 | $31.26 | $14.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 20 FT | $40.00 | $46.32 | $17.00 |
| 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST | 11 FT | $35.00 | $40.53 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 37.5 SF | $35.00 | $37.05 | $20.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 2 EACH | $475 | $579 | $125 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $100 | $70.53 | $30.00 |
| 646E10010 EDGE LINE, 6" | 0.08 MILE | $11,000 | $11,579 | $15,000 |
| 646E10110 LANE LINE, 6" | 0.15 MILE | $5,500 | $5,789 | $75,000 |
| 646E10200 CENTER LINE | 0.03 MILE | $12,000 | $13,895 | $20,000 |
| 646E10300 CHANNELIZING LINE, 8" | 241 FT | $4.00 | $3.47 | $5.00 |
| 646E10400 STOP LINE | 23 FT | $25.00 | $18.53 | $20.00 |
| 646E10510 CROSSWALK LINE, 12" | 125 FT | $15.00 | $16.21 | $15.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 63 FT | $15.00 | $17.37 | $20.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $200 | $279 | $1,000 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 310 FT | $3.00 | $2.32 | $6.00 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 3 EACH | $300 | $579 | $300 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $6,535.00 2 $10,841.10 3 $17,865.00 | 5 MGAL | $1.00 | $7.53 | $1.00 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $500 | $895 | $3,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →