GAL-SR 160-18.84
GAL County · est $1.1M
Bid dateThursday, January 11—
GAL County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 48 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Brayman Construction Corporation | % of bid |
|---|---|---|---|---|---|
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 171,800 LB | $1.56 | $1.49 | $1.40 | 25% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE DECK PANEL, | 19 EACH | $8,700 | $8,300 | $13,500 | 16% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $83,000 | $175,000 | $260,000 | 8% |
| 847E10100 LATEX MODIFIED CONCRETE OVERLAY (THICKNESS VARIES | 538 SY | $123 | $90.00 | $122 | 6% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 8,355 SF | $7.00 |
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Brayman Construction Corporation |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $5,000 | $40,000 |
| 202E23000 PAVEMENT REMOVED | 20 SY | $24.00 | $35.00 | $35.00 |
| 202E38000 GUARDRAIL REMOVED | 523 FT | $1.60 | $1.50 | $2.00 |
| 203E10000 EXCAVATION | 174 CY | $36.00 | $20.00 | $35.00 |
| 203E20000 EMBANKMENT | 43 CY | $18.00 | $24.00 | $125 |
| 204E10000 SUBGRADE COMPACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $6.60 |
| $8.50 |
| 6% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 8,355 SF | $7.00 | $6.60 | $8.50 | 6% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 37 CY | $1,190 | $950 | $2,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $95,000 | 4% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 139 SY | $260 | $270 | $500 | 3% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 58 CY | $570 | $700 | $800 | 3% |
| 511E21520 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 34 CY | $930 | $775 | $1,500 | 3% |
| 511E43210 CLASS QC1 CONCRETE, PIER | 16 CY | $1,600 | $1,800 | $2,500 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 82 CY | $310 | $220 | $232 | 2% |
| 530E01200 SPECIAL - STRUCTURES: ULTRA HIGH PERFORMANCE CONCR | 622 CF | $35.00 | $250 | $475 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 16,920 LB | $1.10 | $1.30 | $2.75 | 2% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE DECK PANEL, | 2 EACH | $8,700 | $8,300 | $13,500 | 2% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE DECK PANEL, | 2 EACH | $8,700 | $8,300 | $13,500 | 2% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE DECK PANEL, | 2 EACH | $8,700 | $8,300 | $13,500 | 2% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE DECK PANEL, | 2 EACH | $8,700 | $8,300 | $13,500 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,089 | $22,000 | $15,000 | 1% |
| 384 SY |
| $2.50 |
| $2.60 |
| $18.00 |
| 606E13000 GUARDRAIL, TYPE 5 | 500 FT | $15.50 | $16.20 | $16.20 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 1 EACH | $1,200 | $1,035 | $1,035 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $605 | $745 | $745 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,285 | $1,420 | $1,420 |
| 659E10000 SEEDING AND MULCHING | 996 SY | $3.50 | $2.72 | $3.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $800 | $625 | $790 |
| 659E31000 LIME | 0.21 ACRE | $95.00 | $110 | $90.00 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 53 FT | $20.00 | $15.00 | $195 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1 1/2") | 184 SY | $6.00 | $4.50 | $5.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 414 SY | $14.00 | $4.50 | $5.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 34 CY | $307 | $250 | $263 |
| 304E20000 AGGREGATE BASE | 88 CY | $85.00 | $103 | $205 |
| 407E10000 TACK COAT | 139 GAL | $2.10 | $2.00 | $2.10 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $20.00 | $25.00 | $25.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 6 EACH | $10.50 | $10.00 | $6.25 |
| 626E00116 BARRIER REFLECTOR, TYPE 5 (BIDIRECTIONAL) | 12 EACH | $18.00 | $17.00 | $6.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 7 FT | $9.50 | $25.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $12.50 | $15.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $42.00 | $45.00 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $12.50 | $10.00 | $10.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $42.00 | $95.00 | $95.00 |
| 642E00094 EDGE LINE, 6" | 0.21 MILE | $5,000 | $4,735 | $4,735 |
| 642E00290 CENTER LINE | 0.11 MILE | $9,100 | $8,675 | $8,675 |
| 202E23500 WEARING COURSE REMOVED | 515 SY | $9.00 | $12.00 | $16.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 254 EACH | $25.00 | $13.00 | $40.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 980 SY | $10.00 | $9.50 | $13.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 600 EACH | $3.90 | $7.00 | $7.50 |
| 514E10000 FINAL INSPECTION REPAIR | 8 EACH | $1.00 | $1.00 | $375 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 85 SF | $10.00 | $11.00 | $12.00 |
| 516E25000 NYLON REINFORCED NEOPRENE SHEETING | 542 SF | $26.00 | $8.00 | $12.00 |
| 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS | 62 FT | $22.00 | $22.00 | $7.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $800 | $665 | $1,200 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $800 | $552 | $900 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 4 EACH | $1,500 | $1,150 | $2,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 89 CY | $90.00 | $80.00 | $100 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 64 SF | $220 | $120 | $297 |
| 847E30000 TEST SLAB | 1 LS | $3,000 | $2,500 | $3,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $11,000 | $15,164 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $4,250 | $38,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,000 | $4,000 | $60,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 171,800 LB | $1.56 | $268k | 22% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE DECK PANEL, | 19 EACH | $8,700 | $165k | 13% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $83,000 | $83k | 7% |
| 847E10100 LATEX MODIFIED CONCRETE OVERLAY (THICKNESS VARIES | 538 SY | $123 | $66k | 5% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 8,355 SF | $7 | $58k | 5% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 8,355 SF | $7 | $58k | 5% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 37 CY | $1,190 | $44k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 139 SY | $260 | $36k | 3% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 58 CY | $570 | $33k | 3% |