HAN-SR 330-00.26
HAN County · est $1.1M
Bid dateThursday, January 11—
HAN County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 56 more items below.
| Item | Quantity | R1E S Wagner Company | R2Global Outdoor Solutions | R3Eagle Bridge CO | R4Complete General Construction Company | R5Miller Bros Const INC | R6Rietschlin Construction INC | R7Vernon Nagel INC | R8Mosser Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 277 CY | $675 | $625 | $725 | $800 | $725 | $740 | $850 | $675 | 21% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $116,232 | $135,000 | $107,000 | $80,000 | $130,000 |
| Item | Quantity | R1E S Wagner Company | R2Global Outdoor Solutions | R3Eagle Bridge CO | R4Complete General Construction Company | R5Miller Bros Const INC | R6Rietschlin Construction INC | R7Vernon Nagel INC | R8Mosser Construction INC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $3,000 | $2,500 | $9,000 | $1,000 | $3,500 | $1,000 | $2,000 |
| 202E38000 GUARDRAIL REMOVED | 524 FT | $1.60 | $2.00 | $1.50 | $5.75 | $2.00 | $3.25 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $135,000 |
| $161,000 |
| $220,000 |
| 13% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 90,767 LB | $0.90 | $1.05 | $1.00 | $0.95 | $1.05 | $1.00 | $1.00 | $0.92 | 9% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,290 SF | $10.15 | $16.25 | $15.03 | $16.54 | $10.00 | $12.25 | $12.00 | $10.41 | 8% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $50,000 | $31,000 | $27,500 | $35,000 | $40,000 | $22,345 | $45,000 | $35,000 | 6% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 179 SY | $250 | $235 | $245 | $215 | $235 | $215 | $240 | $215 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | $40,000 | $40,000 | $30,000 | $40,000 | 5% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 82 CY | $450 | $475 | $500 | $450 | $535 | $500 | $500 | $625 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 167 CY | $180 | $195 | $180 | $174 | $180 | $180 | $165 | $180 | 3% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $30,000 | $4,000 | $35,000 | $30,000 | $28,000 | $36,000 | $35,000 | $30,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $5,000 | $23,000 | $10,000 | $20,000 | $37,500 | $20,000 | $90,000 | 3% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 34 CY | $850 | $850 | $900 | $1,025 | $875 | $760 | $1,000 | $725 | 3% |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 371 FT | $71.50 | $73.00 | $67.15 | $56.00 | $67.00 | $84.75 | $56.00 | $56.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 87 CY | $220 | $240 | $221 | $195 | $220 | $202 | $185 | $220 | 2% |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 842 SY | $22.34 | $20.00 | $21.00 | $20.00 | $26.00 | $21.80 | $12.00 | $22.00 | 2% |
| 203E10000 EXCAVATION | 498 CY | $30.00 | $45.00 | $30.00 | $21.00 | $25.00 | $21.00 | $25.00 | $35.00 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,290 SF | $2.03 | $1.25 | $1.00 | $1.10 | $2.00 | $4.50 | $2.00 | $2.10 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,290 SF | $2.03 | $1.25 | $1.00 | $1.10 | $2.00 | $3.50 | $2.00 | $2.10 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,290 SF | $2.03 | $0.75 | $0.50 | $0.55 | $2.00 | $3.50 | $2.00 | $2.10 | 2% |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 203 SY | $70.00 | $65.00 | $45.00 | $50.00 | $70.00 | $41.00 | $65.00 | $60.00 | 2% |
| $2.00 |
| $5.75 |
| 203E20000 EMBANKMENT | 15 CY | $50.00 | $30.00 | $30.00 | $30.00 | $20.00 | $46.00 | $30.00 | $75.00 |
| 204E10000 SUBGRADE COMPACTION | 1,298 SY | $3.00 | $4.00 | $3.50 | $5.00 | $1.00 | $2.00 | $1.00 | $3.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 3 STA | $300 | $60.00 | $50.00 | $700 | $250 | $500 | $45.00 | $50.00 |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 350 FT | $17.60 | $18.00 | $23.80 | $23.75 | $23.75 | $21.00 | $18.00 | $23.75 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,365 | $2,500 | $1,716 | $1,713 | $1,713 | $2,047 | $2,365 | $1,713 |
| 659E10000 SEEDING AND MULCHING | 750 SY | $3.79 | $7.00 | $5.00 | $3.70 | $3.70 | $3.50 | $3.70 | $3.70 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $486 | $750 | $1,000 | $600 | $600 | $700 | $600 | $600 |
| 659E35000 WATER | 4 MGAL | $1.19 | $5.00 | $10.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 182 FT | $14.00 | $12.00 | $9.00 | $20.00 | $12.00 | $11.00 | $15.00 | $17.00 |
| 304E20000 AGGREGATE BASE | 244 CY | $55.00 | $65.00 | $55.00 | $45.00 | $58.00 | $51.00 | $65.00 | $50.00 |
| 407E10000 TACK COAT | 57 GAL | $1.00 | $3.00 | $1.00 | $3.16 | $1.00 | $3.50 | $3.00 | $1.00 |
| 609E24510 CURB, TYPE 4-C | 104 FT | $30.00 | $30.00 | $30.00 | $50.00 | $25.00 | $27.25 | $25.00 | $30.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 4 EACH | $65.00 | $70.00 | $80.19 | $65.00 | $65.00 | $45.00 | $65.00 | $40.05 |
| 621E00100 RPM | 4 EACH | $475 | $580 | $503 | $502 | $502 | $681 | $475 | $475 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $50.00 | $50.00 | $8.18 | $20.15 | $10.00 | $60.00 | $30.92 | $50.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, (BI-DIRECTIONAL) | 6 EACH | $6.10 | $7.00 | $25.06 | $25.00 | $25.00 | $8.00 | $6.10 | $25.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 8 EACH | $6.25 | $7.00 | $25.06 | $25.00 | $25.00 | $8.18 | $6.25 | $25.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 8 FT | $32.50 | $33.00 | $35.08 | $24.00 | $32.50 | $28.00 | $32.50 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $65.00 | $175 | $48.11 | $150 | $65.00 | $59.95 | $65.00 | $55.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $10.00 | $18.00 | $13.03 | $15.00 | $10.00 | $17.00 | $10.00 | $15.00 |
| 642E00094 EDGE LINE, 6" | 0.23 MILE | $6,000 | $3,700 | $4,037 | $3,500 | $4,028 | $6,540 | $3,500 | $4,028 |
| 642E00290 CENTER LINE | 0.11 MILE | $6,000 | $7,800 | $7,723 | $7,500 | $7,705 | $6,540 | $7,500 | $7,705 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $340 | $365 | $340 | $300 | $340 | $346 | $275 | $340 |
| 407E10000 TACK COAT | 20 GAL | $1.00 | $3.00 | $1.00 | $3.16 | $1.00 | $3.50 | $3.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $185 | $210 | $185 | $211 | $185 | $218 | $200 | $185 |
| 616E10000 WATER | 1 MGAL | $117 | $5.00 | $20.00 | $60.00 | $80.00 | $10.90 | $1.00 | $15.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $40.00 | $15.00 | $70.00 | $75.00 | $75.00 | $100 | $50.00 | $55.00 |
| 202E22900 APPROACH SLAB REMOVED | 175 SY | $35.00 | $35.00 | $33.00 | $50.00 | $28.00 | $33.00 | $35.00 | $45.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1.00 | $6,000 | $1.00 | $1,200 | $1.00 | $8,500 | $1,500 | $1,500 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 364 EACH | $22.00 | $18.00 | $17.00 | $15.00 | $19.00 | $18.25 | $22.00 | $25.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,200 | $1,200 | $3,000 | $4,000 | $1,900 | $2,225 | $2,500 | $3,000 |
| 511E42510 CLASS QC1 CONCRETE, PIER CAP | 17 CY | $800 | $1,200 | $1,750 | $1,400 | $1,000 | $1,200 | $2,000 | $1,200 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 20 CY | $550 | $1,100 | $575 | $750 | $600 | $550 | $600 | $625 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,896 EACH | $3.25 | $3.50 | $3.25 | $3.25 | $3.50 | $3.50 | $3.50 | $3.20 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 15 MNHR | $102 | $0.30 | $100 | $110 | $100 | $138 | $100 | $104 |
| 514E10000 FINAL INSPECTION REPAIR | 1 EACH | $305 | $350 | $301 | $331 | $300 | $218 | $300 | $315 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $8.00 | $12.00 | $6.00 | $10.00 | $6.00 | $16.50 | $10.00 | $14.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 437 SF | $10.00 | $10.00 | $10.00 | $12.00 | $7.00 | $5.75 | $7.00 | $15.00 |
| 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE | 74 FT | $25.00 | $12.00 | $28.00 | $55.00 | $29.00 | $27.00 | $35.00 | $55.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,100 | $1,000 | $750 | $930 | $1,300 | $659 | $1,200 | $1,450 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,000 | $900 | $675 | $840 | $1,200 | $561 | $1,100 | $1,350 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,225 | $1,020 | $800 | $980 | $1,350 | $973 | $1,400 | $1,750 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $5,000 | $3,000 | $8,500 | $7,500 | $8,000 | $4,700 | $5,000 | $5,500 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 220 FT | $6.00 | $10.00 | $10.00 | $10.00 | $7.50 | $9.00 | $10.00 | $14.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 140 FT | $20.00 | $8.00 | $10.00 | $13.00 | $13.50 | $13.00 | $10.00 | $14.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 5 SF | $160 | $100 | $500 | $250 | $175 | $418 | $90.00 | $125 |
| 526E90010 TYPE A INSTALLATION | 68 FT | $80.00 | $120 | $125 | $225 | $140 | $130 | $135 | $125 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 50 SY | $20.00 | $75.00 | $20.00 | $20.00 | $27.00 | $45.00 | $120 | $55.00 |
| 843E50001 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 5 SF | $160 | $100 | $500 | $300 | $150 | $310 | $90.00 | $175 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 28 CF | $300 | $325 | $340 | $293 | $293 | $322 | $310 | $320 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,189 | $12,000 | $12,000 | $11,000 | $9,000 | $10,000 | $15,000 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,750 | $1,000 | $1,750 | $2,200 | $2,350 | $1,790 | $1,500 | $2,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,500 | $6,000 | $6,500 | $7,500 | $6,400 | $4,578 | $14,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 277 CY | $675 | $187k | 17% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $116,232 | $116k | 11% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 90,767 LB | $0.9 | $82k | 8% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,290 SF | $10.15 | $74k | 7% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $50,000 | $50k | 5% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 179 SY | $250 | $45k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 82 CY | $450 | $37k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 167 CY | $180 | $30k | 3% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $30,000 | $30k | 3% |