HAM-SR 264-06.02 Sidewalk
HAM County · est $0.3M
Bid dateThursday, January 25—
HAM County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1Tri-state Concrete Construction INC | R2R B Jergens Contractors INC | R3Adleta INC | R4Prus Construction Company | R5Ford Development CORP | R6Rack & Ballauer Excavating CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 608E12000 5" CONCRETE WALK | 12,541 SF | $4.75 | $5.15 | $5.60 | $7.50 | $9.00 | $11.00 | 26% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 261 SY | $67.50 | $65.00 | $95.00 | $105 | $180 | $130 | 8% |
| 203E10000 EXCAVATION | 334 CY | $48.00 | $31.00 | $84.00 |
| Item | Quantity | R1Tri-state Concrete Construction INC | R2R B Jergens Contractors INC | R3Adleta INC | R4Prus Construction Company | R5Ford Development CORP | R6Rack & Ballauer Excavating CO INC |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 33 SY | $40.00 | $25.90 | $16.00 | $50.00 | $2.00 | $40.00 |
| 202E30000 WALK REMOVED | 396 SF | $2.50 | $1.85 | $1.50 | $8.00 | $1.00 | $6.00 |
| 202E32000 CURB REMOVED | 44 FT | $20.00 | $4.05 | $10.00 | $20.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $90.00 |
| $10.00 |
| $90.00 |
| 7% |
| 832E30000 EROSION CONTROL | 12,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $41,250 | $60,000 | $50,000 | $53,100 | $6,500 | 6% |
| 608E15000 8" CONCRETE WALK | 1,577 SF | $6.85 | $7.30 | $11.30 | $13.00 | $20.00 | $13.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $16,000 | $2,000 | $10,000 | $20,000 | $18,000 | 4% |
| 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS) | 21 CY | $465 | $367 | $275 | $600 | $300 | $550 | 4% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 590 SY | $16.50 | $9.80 | $17.25 | $35.00 | $2.00 | $16.00 | 4% |
| 659E00300 TOPSOIL | 171 CY | $50.00 | $57.40 | $64.00 | $75.00 | $40.00 | $50.00 | 4% |
| 638E20778 SPECIAL - 2" COPPER WATER SERVICE LINE (CIN. 1126) | 63 FT | $134 | $64.90 | $220 | $150 | $90.00 | $240 | 4% |
| 611E98510 CATCH BASIN, NO. 2-3 | 3 EACH | $2,200 | $2,391 | $2,400 | $1,975 | $3,000 | $2,700 | 3% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 109 SY | $59.80 | $57.70 | $74.00 | $88.00 | $160 | $140 | 3% |
| 611E04400 12" CONDUIT, TYPE B | 154 FT | $40.00 | $60.10 | $90.00 | $55.00 | $80.00 | $90.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $3,100 | $4,000 | $10,000 | $6,000 | $5,000 | 3% |
| 203E20000 EMBANKMENT | 113 CY | $50.00 | $18.60 | $70.00 | $64.00 | $10.00 | $130 | 2% |
| 638E98000 WATER WORK, MISC.: RELOCATING EXISTING 2" FROST-PR | 3 EACH | $1,850 | $1,055 | $1,645 | $1,150 | $3,000 | $3,000 | 2% |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING CURB | 8 EACH | $675 | $641 | $377 | $110 | $100 | $250 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $13,500 | $17,000 | $12,500 | $20,000 | $25,100 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $4,150 | $3,750 | $6,500 | $8,000 | $7,500 | 2% |
| $30.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 140 FT | $22.00 | $22.30 | $19.00 | $35.00 | $1.00 | $30.00 |
| 202E75000 FENCE REMOVED | 17 FT | $15.00 | $24.40 | $20.00 | $15.00 | $1.00 | $10.00 |
| 202E98100 REMOVAL MISC.:CURB STOP REMOVED | 1 EACH | $100 | $375 | $70.00 | $60.00 | $10.00 | $200 |
| 202E98200 REMOVAL MISC.:WALL REMOVED | 4 FT | $35.00 | $126 | $65.00 | $75.00 | $10.00 | $200 |
| 202E98400 REMOVAL MISC.:ROCK FILL REMOVED | 21 SF | $10.00 | $2.50 | $12.50 | $25.00 | $2.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 1,394 SY | $1.95 | $2.25 | $4.00 | $4.00 | $1.00 | $3.85 |
| 608E13000 6" CONCRETE WALK | 342 SF | $6.10 | $6.00 | $7.40 | $10.00 | $18.00 | $12.00 |
| 608E52000 CURB RAMP | 297 SF | $11.60 | $13.10 | $17.80 | $24.00 | $16.00 | $20.00 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $400 | $249 | $135 | $225 | $100 | $200 |
| 690E98400 SPECIAL - SPECIAL MISC.: CONSULTANT FOR CONCRETE Q | 1 LS | $3,600 | $11,310 | $13,200 | $2,500 | $10,000 | $11,000 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,350 | $5,515 | $4,000 | $2,500 | $5,000 | $3,000 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1 CY | $415 | $189 | $210 | $250 | $200 | $500 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 4,290 SY | $0.75 | $1.25 | $1.30 | $2.50 | $1.00 | $1.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.58 TON | $1,000 | $657 | $650 | $4,000 | $600 | $625 |
| 659E31000 LIME | 0.89 ACRE | $250 | $116 | $121 | $2,800 | $200 | $110 |
| 659E35000 WATER | 23 MGAL | $10.00 | $1.05 | $1.10 | $62.00 | $10.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $800 | $1,095 | $900 | $600 | $1,000 | $500 |
| 611E00400 4" CONDUIT, TYPE E | 20 FT | $23.00 | $15.10 | $28.00 | $10.00 | $8.00 | $30.00 |
| 611E01100 6" CONDUIT, TYPE C | 20 FT | $25.00 | $17.20 | $30.00 | $10.00 | $10.00 | $30.00 |
| 611E04600 12" CONDUIT, TYPE C | 107 FT | $40.50 | $60.10 | $95.00 | $78.00 | $60.00 | $89.00 |
| 611E04900 12" CONDUIT, TYPE D | 25 FT | $29.00 | $42.70 | $85.00 | $78.00 | $60.00 | $90.00 |
| 611E05200 12" CONDUIT, TYPE F | 20 FT | $28.00 | $42.70 | $85.00 | $40.00 | $14.00 | $75.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,650 | $1,558 | $1,400 | $1,750 | $2,000 | $2,050 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $750 | $1,587 | $525 | $1,500 | $1,000 | $1,600 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,800 | $2,478 | $2,550 | $3,500 | $4,000 | $2,800 |
| 611E99920 DRAINAGE STRUCTURE, MISC.:CORE INTO EXISTING CATCH | 1 LS | $275 | $1,395 | $550 | $650 | $500 | $1,200 |
| 611E99920 DRAINAGE STRUCTURE, MISC.:TRENCH DRAIN UNPLUGGED | 1 LS | $625 | $1,000 | $1,100 | $250 | $500 | $1,000 |
| 407E10000 TACK COAT | 8 GAL | $5.00 | $7.00 | $11.00 | $50.00 | $20.00 | $20.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $530 | $552 | $385 | $600 | $500 | $1,500 |
| 609E26000 CURB, TYPE 6 | 2 FT | $130 | $94.30 | $75.00 | $200 | $100 | $500 |
| 509E25000 REINFORCING STEEL (CIN. 509) | 30 LB | $0.75 | $6.65 | $0.01 | $1.00 | $1.00 | $1.00 |
| 602E98200 MASONRY, MISC.: CONCRETE, CLASS C (CIN. 1110) | 1 CY | $450 | $533 | $0.01 | $500 | $100 | $1.00 |
| 638E20064 SPECIAL - 6" WATER MAIN DIP CLASS 55 MECHANICAL JO | 24 FT | $122 | $219 | $322 | $260 | $100 | $415 |
| 638E20498 SPECIAL - VALVE BOX (CIN. 1116) | 1 EACH | $2,050 | $977 | $850 | $500 | $500 | $200 |
| 638E20500 SPECIAL - VALVE BOX ADJUSTED TO GRADE (CIN. 1125) | 1 EACH | $125 | $739 | $175 | $400 | $50.00 | $300 |
| 638E20750 SPECIAL - 6" FIRE HYDRANT (CIN. 1114) | 1 EACH | $3,500 | $3,004 | $7,968 | $3,100 | $15,000 | $4,100 |
| 638E20760 SPECIAL - FIRE HYDRANT REMOVED AND DISPOSED OF (CI | 1 EACH | $550 | $1,021 | $300 | $425 | $300 | $500 |
| 638E20762 SPECIAL - FIRE HYDRANT SERVICE LINE EXTENDED AND A | 1 EACH | $800 | $950 | $475 | $500 | $600 | $400 |
| 638E20762 SPECIAL - FIRE HYDRANT SERVICE LINE EXTENDED AND A | 1 EACH | $665 | $882 | $400 | $400 | $400 | $500 |
| 638E20766 SPECIAL - 3/4" COPPER WATER SERVICE LINE (CIN. 112 | 27 FT | $82.50 | $49.20 | $109 | $125 | $70.00 | $100 |
| 638E98000 WATER WORK, MISC.: ADJUST EXISTING VALVE CHAMBER | 1 EACH | $185 | $680 | $830 | $575 | $500 | $500 |
| 638E98000 WATER WORK, MISC.: RELOCATING EXISTING 5/8" FROST- | 1 EACH | $2,000 | $577 | $1,051 | $1,100 | $2,000 | $2,500 |
| 638E98000 WATER WORK, MISC.: REMOVING EXISTING VALVE BOX (CI | 1 EACH | $450 | $346 | $150 | $225 | $10.00 | $200 |
| 638E98000 WATER WORK, MISC.: RESETTING EXISTING CURB AND ROA | 2 EACH | $600 | $692 | $175 | $175 | $300 | $100 |
| 611E99654 MANHOLE ADJUSTED TO GRADEFOR GREATER CINCINNATI WA | 3 EACH | $465 | $680 | $500 | $650 | $500 | $500 |
| 611E99690 MANHOLE, MISC.:REMOVE & REPLACE LID WITH ADA COMPL | 3 EACH | $600 | $504 | $300 | $280 | $500 | $350 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 1 EACH | $125 | $165 | $300 | $350 | $100 | $500 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $85.00 | $36.70 | $40.00 | $75.00 | $25.00 | $200 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $125 | $68.20 | $72.00 | $95.00 | $25.00 | $200 |
| 642E00290 CENTER LINE | 0 MILE | $10,000 | $498,560 | $522,500 | $200,000 | $525,000 | $475,000 |
| 642E00390 CHANNELIZING LINE, 8" | 5 FT | $15.00 | $16.80 | $17.60 | $38.15 | $18.00 | $16.00 |
| 642E00490 STOP LINE | 30 FT | $25.00 | $10.50 | $11.00 | $40.15 | $11.00 | $10.00 |
| 642E01290 LANE ARROW | 5 EACH | $250 | $137 | $143 | $100 | $143 | $130 |
| 410E10000 TRAFFIC COMPACTED SURFACE, TYPE A | 37 CY | $117 | $61.20 | $172 | $80.00 | $40.00 | $150 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E12000 5" CONCRETE WALK | 12,541 SF | $4.75 | $60k | 20% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 261 SY | $67.5 | $18k | 6% |
| 203E10000 EXCAVATION | 334 CY | $48 | $16k | 5% |
| 832E30000 EROSION CONTROL | 12,500 EACH | $1 | $13k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $13k | 4% |
| 608E15000 8" CONCRETE WALK | 1,577 SF | $6.85 | $11k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS) | 21 CY | $465 | $10k | 3% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 590 SY | $16.5 | $10k | 3% |
| 659E00300 TOPSOIL | 171 CY | $50 | $9k | 3% |