POR-SR 303-(00.70)(01.21)
POR County · est $2.3M
Bid dateThursday, January 25—
POR County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 71 more items below.
| Item | Quantity | R1M Campbell Contracting LLC | R2Shelly & Sands INC | R3Independence Excavating INC | R4S E T INC | R5Kenmore Construction CO INC | R6Marucci & Gaffney Excavating CO | R7Burton Scot Contractors LLC | R8Lockhart Concrete CO | R9Fabrizi Trucking & Paving CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 203E98000 ROADWAY, MISC.: LIGHTWEIGHT AGGREGATE | 10,016 CY | $52.00 | $55.00 | $65.50 | $65.00 | $60.00 | $60.00 | $70.00 | $80.00 | $88.50 | 26% |
| 203E10000 EXCAVATION (FOR FINAL GRADING) | 15,132 CY |
| Item | Quantity | R1M Campbell Contracting LLC | R2Shelly & Sands INC | R3Independence Excavating INC | R4S E T INC | R5Kenmore Construction CO INC | R6Marucci & Gaffney Excavating CO | R7Burton Scot Contractors LLC | R8Lockhart Concrete CO | R9Fabrizi Trucking & Paving CO INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,560 | $10,000 | $10,000 | $111,900 | $15,000 | $5,000 | $25,000 | $2,000 | $22,000 |
| 202E23000 PAVEMENT REMOVED | 1,334 SY | $16.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $13.70 |
| $16.00 |
| $10.00 |
| $15.00 |
| $18.00 |
| $18.00 |
| $19.00 |
| $34.00 |
| $21.75 |
| 10% |
| 203E20000 EMBANKMENT (FOR SURCHARGE PHASE) | 7,805 CY | $25.00 | $16.00 | $15.00 | $17.50 | $18.00 | $27.00 | $18.00 | $28.00 | $26.75 | 10% |
| 203E07504 SPECIAL - WICK DRAIN (PREFABRICATED VERTICAL DRAIN | 239,250 FT | $0.70 | $0.50 | $0.48 | $1.00 | $0.70 | $0.50 | $0.55 | $1.00 | $0.60 | 8% |
| 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN (NO. 67 LIM | 3,438 CY | $44.00 | $45.00 | $57.00 | $58.00 | $55.00 | $61.00 | $80.00 | $74.00 | $60.00 | 8% |
| 611E58901 87" X 63" CONDUIT, TYPE A, AS PER PLAN, 707.02 (7 | 270 FT | $412 | $300 | $380 | $250 | $400 | $275 | $550 | $560 | $575 | 6% |
| 203E20000 EMBANKMENT (FOR SURCHARGE SETTLEMENT) | 7,000 CY | $14.00 | $12.00 | $11.25 | $4.00 | $18.00 | $29.00 | $18.00 | $28.00 | $26.75 | 5% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 715 CY | $116 | $110 | $120 | $121 | $125 | $125 | $130 | $142 | $139 | 4% |
| 203E10000 EXCAVATION (FOR SURCHARGE PHASE) | 4,131 CY | $17.75 | $17.00 | $10.00 | $15.00 | $18.00 | $20.00 | $20.00 | $32.00 | $22.00 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 309 CY | $156 | $145 | $181 | $185 | $160 | $189 | $185 | $205 | $205 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $47,800 | $20,000 | $15,000 | $28,000 | $25,000 | $20,000 | $30,000 | $25,459 | $19,000 | 2% |
| 607E20001 FENCE, TYPE CL, AS PER PLAN | 1,200 FT | $35.00 | $30.00 | $31.00 | $32.50 | $24.60 | $38.00 | $24.60 | $16.00 | $35.00 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (294 CY | $137 | $120 | $151 | $154 | $140 | $160 | $155 | $180 | $168 | 2% |
| 203E07510 SPECIAL - PIEZOMETER (VIBRATING WIRE) | 4 EACH | $8,303 | $25,000 | $12,000 | $1,500 | $2,500 | $5,000 | $3,500 | $5,250 | $5,500 | 2% |
| 253E01000 PAVEMENT REPAIR | 472 SY | $67.50 | $80.00 | $100 | $35.00 | $55.00 | $100 | $140 | $59.00 | $141 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $31,585 | $50,000 | $40,000 | $25,000 | $30,000 | $50,000 | $15,000 | $4,600 | $75,000 | 2% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 487 CY | $58.00 | $58.00 | $50.00 | $55.00 | $55.00 | $58.00 | $50.00 | $50.00 | $65.00 | 1% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 1,325 FT | $21.00 | $20.00 | $19.50 | $20.00 | $19.44 | $21.00 | $19.44 | $16.00 | $22.00 | 1% |
| 659E00300 TOPSOIL | 400 CY | $65.00 | $34.00 | $35.00 | $31.00 | $30.00 | $32.00 | $21.00 | $50.00 | $58.00 | 1% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| $13.00 |
| $15.00 |
| $15.00 |
| $10.00 |
| $14.00 |
| $20.00 |
| $10.00 |
| $12.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 140 SY | $16.50 | $8.00 | $12.00 | $10.00 | $12.00 | $20.00 | $25.00 | $10.00 | $12.00 |
| 202E23500 WEARING COURSE REMOVED | 1 SY | $5.00 | $200 | $300 | $350 | $500 | $350 | $500 | $40.00 | $200 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 75 FT | $90.00 | $12.00 | $30.00 | $20.00 | $30.00 | $35.00 | $20.00 | $10.00 | $90.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 108 FT | $57.00 | $17.00 | $22.00 | $20.00 | $18.00 | $38.00 | $50.00 | $20.00 | $20.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 79 CY | $33.00 | $15.00 | $22.00 | $15.00 | $20.00 | $35.00 | $40.00 | $32.00 | $40.00 |
| 203E20000 EMBANKMENT (FOR FINAL GRADING) | 156 CY | $53.00 | $9.00 | $50.00 | $20.00 | $18.00 | $30.00 | $66.00 | $28.00 | $25.00 |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 8 CY | $40.00 | $30.00 | $57.00 | $55.00 | $50.00 | $100 | $200 | $57.00 | $80.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 3 EACH | $3,900 | $1,000 | $1,000 | $5,500 | $2,000 | $2,500 | $12,000 | $875 | $1,500 |
| 204E10000 SUBGRADE COMPACTION | 152 SY | $1.50 | $3.50 | $12.00 | $2.00 | $5.00 | $2.50 | $30.00 | $7.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 240 CY | $15.00 | $20.00 | $40.00 | $10.00 | $20.00 | $29.00 | $40.00 | $32.00 | $25.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 240 CY | $53.00 | $52.00 | $60.00 | $25.00 | $60.00 | $61.00 | $75.00 | $50.00 | $60.00 |
| 204E50000 GEOTEXTILE FABRIC, 712.09, TYPE D | 8,498 SY | $1.50 | $1.00 | $1.25 | $1.00 | $1.50 | $2.25 | $5.00 | $2.00 | $1.25 |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 9 STA | $200 | $90.00 | $850 | $150 | $200 | $400 | $800 | $16.00 | $1,000 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 2 EACH | $1,810 | $1,800 | $1,725 | $1,800 | $1,730 | $1,800 | $1,730 | $1,785 | $1,950 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $1,970 | $1,900 | $1,875 | $2,100 | $1,865 | $2,000 | $1,865 | $2,100 | $2,100 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $710 | $840 | $675 | $950 | $800 | $850 | $795 | $840 | $750 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $250 | $230 | $360 | $400 | $350 | $650 | $1,000 | $350 | $750 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 10,517 SY | $2.15 | $1.60 | $2.00 | $2.00 | $2.50 | $2.00 | $3.00 | $3.00 | $2.00 |
| 863E00200 GEOGRID, TYPE P2 (FOR REINFORCED SOIL SLOPES) | 5,240 SY | $3.30 | $3.80 | $5.00 | $3.00 | $2.75 | $5.50 | $10.00 | $2.50 | $6.00 |
| 601E10000 RIPRAP | 26 SY | $141 | $230 | $500 | $115 | $115 | $250 | $500 | $30.00 | $65.00 |
| 659E10000 SEEDING AND MULCHING | 4,963 SY | $1.30 | $0.90 | $1.20 | $1.30 | $1.75 | $2.00 | $0.73 | $2.00 | $1.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 5,143 SY | $1.30 | $0.90 | $1.20 | $0.80 | $1.00 | $1.50 | $0.01 | $2.00 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 1.16 TON | $1,890 | $640 | $310 | $1,200 | $500 | $500 | $700 | $525 | $700 |
| 659E31000 LIME | 1.77 ACRE | $788 | $60.00 | $50.00 | $350 | $100 | $250 | $1.00 | $420 | $400 |
| 659E35000 WATER | 46 MGAL | $84.00 | $1.00 | $1.00 | $25.00 | $1.00 | $1.00 | $0.10 | $2.00 | $10.00 |
| 671E15040 EROSION CONTROL MAT, TYPE E | 3,604 SY | $2.50 | $2.40 | $2.00 | $2.50 | $2.30 | $2.50 | $2.00 | $2.00 | $2.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $22,000 | $1,300 | $18,000 | $1,500 | $2,000 | $5,000 | $1,200 | $3,675 | $8,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,400 | $20,000 | $6,000 | $23,850 | $7,000 | $25,000 | $4,160 | $3,675 | $15,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (EAST BOWL) | 1 LS | $9,500 | $10,000 | $23,000 | $2,500 | $2,000 | $60,000 | $15,000 | $9.00 | $10,000 |
| 602E20000 CONCRETE MASONRY | 9.4 CY | $1,472 | $800 | $800 | $1,500 | $1,300 | $1,200 | $5,000 | $850 | $1,600 |
| 611E16201 36" CONDUIT, TYPE A, AS PER PLAN | 106 FT | $155 | $150 | $100 | $125 | $110 | $160 | $270 | $145 | $152 |
| 611E20701 48" CONDUIT, TYPE A, AS PER PLAN | 54 FT | $185 | $215 | $150 | $175 | $120 | $200 | $315 | $190 | $193 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $500 | $800 | $678 | $600 | $500 | $750 | $800 | $1,050 | $1,500 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 269 SY | $47.00 | $41.00 | $28.00 | $25.00 | $25.00 | $30.00 | $75.00 | $42.00 | $60.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 4,471 SY | $2.75 | $5.00 | $4.00 | $5.00 | $3.00 | $5.00 | $3.50 | $6.00 | $4.10 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 79 CY | $39.50 | $34.00 | $69.00 | $25.00 | $55.00 | $70.00 | $60.00 | $50.00 | $85.00 |
| 407E20000 NON-TRACKING TACK COAT | 981 GAL | $2.10 | $3.00 | $4.00 | $4.00 | $4.00 | $4.00 | $3.00 | $4.00 | $7.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 262 GAL | $3.75 | $3.00 | $5.00 | $5.00 | $4.00 | $5.25 | $5.00 | $3.00 | $7.00 |
| 441E50700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (35 CY | $394 | $230 | $345 | $350 | $225 | $360 | $220 | $180 | $216 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 37 CY | $49.00 | $80.00 | $100 | $60.00 | $60.00 | $110 | $125 | $50.00 | $119 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $100 | $90.00 | $400 | $200 | $100 | $175 | $500 | $325 | $750 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 17 EACH | $10.00 | $6.00 | $10.00 | $12.00 | $7.00 | $7.00 | $6.00 | $9.00 | $40.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 53 FT | $10.50 | $10.00 | $10.00 | $11.00 | $6.00 | $11.00 | $10.00 | $9.00 | $12.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 15 FT | $16.00 | $15.00 | $15.00 | $18.00 | $7.00 | $16.00 | $15.00 | $9.00 | $17.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $32.00 | $31.00 | $30.00 | $32.00 | $29.00 | $32.00 | $30.00 | $7.00 | $34.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $27.00 | $26.00 | $25.00 | $27.00 | $43.00 | $26.00 | $25.00 | $53.00 | $28.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $16.00 | $16.00 | $15.00 | $20.00 | $22.00 | $16.00 | $15.00 | $27.00 | $17.00 |
| 644E00104 EDGE LINE, 6" | 0.8 MILE | $4,200 | $4,200 | $4,000 | $4,100 | $4,200 | $4,500 | $4,000 | $11,100 | $4,480 |
| 644E00300 CENTER LINE | 0.66 MILE | $6,300 | $6,300 | $6,000 | $6,200 | $6,500 | $6,500 | $6,000 | $9,000 | $6,720 |
| 644E00400 CHANNELIZING LINE, 8" | 111 FT | $1.60 | $1.60 | $1.50 | $2.00 | $1.25 | $5.00 | $1.50 | $2.00 | $2.00 |
| 644E00500 STOP LINE | 20 FT | $13.00 | $13.00 | $12.50 | $13.00 | $6.00 | $15.00 | $12.00 | $12.00 | $14.00 |
| 644E01300 LANE ARROW | 2 EACH | $158 | $150 | $150 | $155 | $125 | $160 | $150 | $163 | $170 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $5,000 | $4,675 | $10,500 | $15,000 | $10,000 | $4,675 | $5,250 | $5,250 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $300 | $150 | $278 | $200 | $100 | $275 | $250 | $237 | $225 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,050 | $1,000 | $1,000 | $1,100 | $950 | $1,200 | $1,000 | $1,105 | $1,150 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $2,500 | $10,000 | $30,000 | $5,500 | $8,000 | $15,000 | $12,000 | $28,000 | $22,040 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $2,500 | $15,000 | $10,000 | $12,870 | $7,500 | $12,000 | $20,000 | $4,600 | $22,040 |
| 601E23000 ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM, TYPE | 103 SY | $230 | $230 | $150 | $90.00 | $150 | $300 | $230 | $132 | $215 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $12.50 | $12.00 | $12.00 | $13.00 | $7.00 | $15.00 | $12.00 | $11.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET , 730.20 | 2 SF | $21.00 | $20.00 | $20.00 | $22.00 | $24.25 | $21.00 | $20.00 | $23.00 | $23.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $21.00 | $20.00 | $20.00 | $22.00 | $28.00 | $21.00 | $20.00 | $23.00 | $23.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $26.00 | $26.00 | $25.00 | $26.00 | $43.50 | $27.00 | $25.00 | $27.00 | $28.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $21.00 | $20.00 | $20.00 | $22.00 | $22.00 | $21.00 | $20.00 | $23.00 | $23.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $27.00 | $26.00 | $20.00 | $30.00 | $56.00 | $27.00 | $25.00 | $27.00 | $28.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $4,000 | $1,000 | $3,500 | $2,500 | $4,000 | $10,000 | $5,000 | $2,000 | $8,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $40,000 | $2,000 | $25,000 | $25,000 | $30,000 | $10,000 | $11,000 | $40,000 |
| 619E16010 FIELD OFFICE, TYPE B | 10 MNTH | $400 | $2,200 | $3,000 | $1,500 | $2,000 | $1,500 | $1,500 | $790 | $2,900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $18,000 | $36,000 | $25,000 | $18,500 | $30,000 | $25,000 | $25,000 | $16,000 | $24,000 |
| 624E10000 MOBILIZATION | 1 LS | $23,500 | $100,000 | $93,000 | $142,000 | $200,000 | $100,000 | $100,000 | $26,805 | $92,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E98000 ROADWAY, MISC.: LIGHTWEIGHT AGGREGATE | 10,016 CY | $52 | $521k | 22% |
| 203E10000 EXCAVATION (FOR FINAL GRADING) | 15,132 CY | $13.7 | $207k | 9% |
| 203E20000 EMBANKMENT (FOR SURCHARGE PHASE) | 7,805 CY | $25 | $195k | 8% |
| 203E07504 SPECIAL - WICK DRAIN (PREFABRICATED VERTICAL DRAIN | 239,250 FT | $0.7 | $167k | 7% |
| 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN (NO. 67 LIM | 3,438 CY | $44 | $151k | 6% |
| 611E58901 87" X 63" CONDUIT, TYPE A, AS PER PLAN, 707.02 (7 | 270 FT | $412 | $111k | 5% |
| 203E20000 EMBANKMENT (FOR SURCHARGE SETTLEMENT) | 7,000 CY | $14 | $98k | 4% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 715 CY | $115.5 | $83k | 3% |
| 203E10000 EXCAVATION (FOR SURCHARGE PHASE) | 4,131 CY | $17.75 | $73k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 309 CY | $156 | $48k | 2% |