TUS-IR 77-19.80
TUS County · est $2.9M
Bid dateThursday, January 25—
TUS County · est $2.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 138 more items below.
| Item | Quantity | R1J D Williamson Construction CO INC | R2Keffler Bridge Company | R3Shelly & Sands INC | R4Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 16,920 SY | $28.00 | $55.00 | $51.50 | $55.00 | 22% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $400,000 | $198,000 | $388,000 | $300,000 | 18% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $97,000 | $129,600 | $70,000 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $110,000 | $110,000 | $75,000 |
| Item | Quantity | R1J D Williamson Construction CO INC | R2Keffler Bridge Company | R3Shelly & Sands INC | R4Complete General Construction Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $7,000 | $4,500 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 540 SY | $13.50 | $16.00 | $16.00 | $18.00 |
| 202E32000 CURB REMOVED | 24 FT | $4.00 | $10.00 | $6.00 | $14.00 |
| 202E38000 GUARDRAIL REMOVED | 4,090 FT | $1.60 | $1.50 | $2.00 | $1.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100,000 |
| 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $110,000 | $110,000 | $75,000 | $100,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $100,000 | 5% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 154 CY | $630 | $700 | $700 | $950 | 4% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 154 CY | $630 | $700 | $650 | $950 | 4% |
| 832E30000 EROSION CONTROL | 88,492 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 4,210 FT | $17.30 | $11.00 | $13.00 | $20.00 | 3% |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 2 EACH | $31,000 | $30,000 | $28,000 | $18,000 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 4,150 FT | $14.00 | $7.00 | $10.50 | $11.00 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 3,800 FT | $15.00 | $17.00 | $16.50 | $14.40 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 55,881 LB | $1.02 | $1.25 | $1.00 | $0.95 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 55,880 LB | $1.02 | $1.25 | $1.00 | $0.95 | 3% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 242 SY | $235 | $240 | $275 | $235 | 3% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 242 SY | $235 | $240 | $275 | $235 | 3% |
| 614E11500 WORKSITE TRAFFIC SUPERVISOR | 9 MNTH | $5,200 | $2,500 | $6,100 | $3,600 | 2% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 244 CY | $160 | $200 | $300 | $230 | 2% |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 28 SNMT | $1,250 | $300 | $1,000 | $800 | 2% |
| 2 EACH |
| $140 |
| $200 |
| $158 |
| $135 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $75.00 | $200 | $53.00 | $70.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 2 EACH | $115 | $110 | $160 | $110 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 6 EACH | $62.00 | $100 | $132 | $60.00 |
| 203E10000 EXCAVATION | 1,622 CY | $17.50 | $11.00 | $11.00 | $12.00 |
| 203E20000 EMBANKMENT | 792 CY | $17.00 | $8.00 | $10.00 | $13.00 |
| 204E10000 SUBGRADE COMPACTION | 1,451 SY | $4.50 | $1.00 | $3.00 | $5.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 2 EACH | $1,750 | $2,000 | $1,800 | $1,670 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 2 EACH | $1,900 | $2,100 | $2,000 | $1,840 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $775 | $800 | $850 | $745 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,000 | $2,300 | $2,000 | $1,935 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $400 | $450 | $425 | $385 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 12 SY | $105 | $100 | $100 | $100 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 170 SY | $65.00 | $45.00 | $45.00 | $64.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $105 | $52.00 | $90.00 | $88.00 |
| 659E00300 TOPSOIL | 649 CY | $25.00 | $12.00 | $5.00 | $15.00 |
| 659E10000 SEEDING AND MULCHING | 1,899 SY | $1.30 | $2.00 | $0.90 | $0.86 |
| 659E14000 REPAIR SEEDING AND MULCHING | 95 SY | $0.70 | $0.50 | $0.90 | $0.68 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $500 | $525 | $700 | $650 |
| 659E31000 LIME | 0.39 ACRE | $105 | $105 | $160 | $150 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 3,944 SY | $2.40 | $1.40 | $2.00 | $1.32 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,600 | $1,500 | $2,500 | $6,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $30,000 | $3,000 | $30,000 | $15,000 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 602 FT | $10.25 | $14.00 | $13.50 | $13.00 |
| 611E00900 6" CONDUIT, TYPE B | 160 FT | $24.50 | $24.00 | $14.00 | $24.00 |
| 611E01500 6" CONDUIT, TYPE F | 87 FT | $18.50 | $9.00 | $18.00 | $14.00 |
| 611E06100 15" CONDUIT, TYPE C | 100 FT | $53.00 | $25.00 | $83.00 | $60.00 |
| 611E09100 21" CONDUIT, TYPE C | 20 FT | $61.50 | $30.00 | $160 | $110 |
| 611E98230 CATCH BASIN, NO. 4 | 2 EACH | $2,750 | $2,800 | $5,000 | $2,700 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $250 | $150 | $229 | $230 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.5" | 844 SY | $10.00 | $9.00 | $11.00 | $18.00 |
| 254E01600 PATCHING PLANED SURFACE | 85 SY | $5.00 | $16.00 | $5.00 | $10.00 |
| 304E20000 AGGREGATE BASE | 238 CY | $50.00 | $70.00 | $110 | $75.00 |
| 407E10000 TACK COAT | 129 GAL | $4.50 | $5.00 | $2.00 | $3.00 |
| 408E10000 PRIME COAT | 15 GAL | $15.00 | $20.00 | $35.00 | $40.00 |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 60 CY | $200 | $700 | $700 | $450 |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 84 CY | $180 | $500 | $500 | $335 |
| 609E24510 CURB, TYPE 4-C | 140 FT | $26.00 | $36.00 | $28.00 | $50.00 |
| 617E10100 COMPACTED AGGREGATE | 8 CY | $105 | $120 | $51.00 | $175 |
| 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) | 2.25 MILE | $2,650 | $3,000 | $2,500 | $2,400 |
| 621E00100 RPM | 84 EACH | $53.00 | $50.00 | $65.00 | $45.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 84 EACH | $21.00 | $5.00 | $14.00 | $10.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (1-WAY) | 8 EACH | $7.00 | $8.00 | $11.00 | $6.60 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1-WAY) | 42 EACH | $7.00 | $8.00 | $8.00 | $6.60 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $15.50 | $16.00 | $13.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 2 SF | $62.00 | $66.00 | $32.00 | $60.00 |
| 646E10010 EDGE LINE, 6" | 2.98 MILE | $3,650 | $4,000 | $4,200 | $4,017 |
| 646E10110 LANE LINE, 6" | 1.9 MILE | $1,900 | $3,000 | $3,000 | $2,865 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 120 FT | $20.00 | $5.00 | $16.00 | $15.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $375 | $300 | $325 | $500 |
| 611E05900 15" CONDUIT, TYPE B | 163 FT | $45.50 | $35.00 | $75.00 | $85.00 |
| 611E09100 21" CONDUIT, TYPE C | 4 FT | $30.00 | $100 | $120 | $145 |
| 611E98300 CATCH BASIN, NO. 5 | 2 EACH | $3,000 | $2,500 | $4,800 | $3,500 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,000 | $800 | $2,650 | $1,500 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $375 | $750 | $2,975 | $1,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $70.00 | $70.00 | $80.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 2,195 FT | $2.10 | $1.00 | $0.75 | $3.00 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 300 FT | $31.25 | $20.00 | $30.00 | $31.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 10 EACH | $1,850 | $2,000 | $2,100 | $1,800 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 10 EACH | $215 | $200 | $155 | $150 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 2,377 EACH | $5.75 | $6.00 | $13.00 | $12.50 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $100 | $200 | $180 | $165 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1-WAY) | 241 EACH | $8.25 | $8.00 | $5.00 | $40.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (1-WAY) | 18 EACH | $16.00 | $8.00 | $8.00 | $40.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 87 EACH | $13.25 | $11.00 | $13.00 | $40.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 86 EACH | $13.50 | $14.00 | $13.00 | $40.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,100 | $500 | $900 | $1,350 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 0.93 MILE | $450 | $500 | $1,800 | $1,445 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 11.21 MILE | $575 | $600 | $1,400 | $1,335 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 12,560 FT | $0.60 | $0.60 | $0.50 | $0.45 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 120 FT | $2.35 | $3.00 | $10.00 | $10.00 |
| 616E10000 WATER | 10 MGAL | $5.00 | $5.00 | $41.00 | $60.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 360 FT | $15.00 | $30.00 | $18.00 | $17.00 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $21.00 | $20.00 | $25.00 | $40.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $35,000 | $10,000 | $14,499 | $30,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 49 CY | $250 | $250 | $105 | $575 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 120 EACH | $17.50 | $10.00 | $21.00 | $20.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,700 | $4,000 | $1,780 | $6,000 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 45 CY | $665 | $440 | $500 | $660 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 67 CY | $465 | $500 | $679 | $840 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 334 SY | $20.00 | $20.00 | $23.00 | $23.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 81 SY | $18.00 | $30.00 | $16.00 | $16.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 33 SY | $13.00 | $20.00 | $35.00 | $35.00 |
| 512E33000 TYPE 2 WATERPROOFING | 16 SY | $18.00 | $25.00 | $39.00 | $45.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 1,059 LB | $4.00 | $7.00 | $7.00 | $5.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,560 EACH | $3.25 | $4.00 | $3.25 | $3.07 |
| 514E00300 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1 LS | $19,000 | $10,000 | $19,000 | $18,600 |
| 514E00400 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1 LS | $15,000 | $10,000 | $16,000 | $15,000 |
| 514E27700 FIELD PAINTING, MISC.:THREE COAT SYSTEM FOR SPOT R | 53 SF | $245 | $200 | $253 | $240 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 18 SF | $5.00 | $10.00 | $11.00 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 42 SF | $5.50 | $13.00 | $14.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 117 FT | $41.00 | $40.00 | $28.00 | $45.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $750 | $900 | $1,275 | $728 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $775 | $800 | $1,275 | $707 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $12,500 | $10,000 | $9,000 | $15,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 61 CY | $70.00 | $90.00 | $100 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 124 FT | $12.00 | $10.00 | $5.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $12.00 | $20.00 | $6.00 | $18.00 |
| 526E90010 TYPE A INSTALLATION | 80 FT | $80.00 | $125 | $135 | $250 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 29 CY | $120 | $150 | $56.00 | $75.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 34 CF | $360 | $310 | $370 | $348 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $21.00 | $20.00 | $25.00 | $40.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $35,000 | $10,000 | $14,500 | $30,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 49 CY | $250 | $250 | $100 | $575 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 120 EACH | $17.50 | $10.00 | $21.00 | $20.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,700 | $4,000 | $1,700 | $6,000 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 45 CY | $665 | $440 | $500 | $660 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 67 CY | $465 | $500 | $675 | $840 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 334 SY | $18.50 | $20.00 | $23.00 | $23.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 81 SY | $19.00 | $30.00 | $16.00 | $16.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 33 SY | $12.50 | $20.00 | $35.00 | $35.00 |
| 512E33000 TYPE 2 WATERPROOFING | 16 SY | $18.00 | $25.00 | $40.00 | $45.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 1,059 LB | $4.00 | $7.00 | $7.00 | $5.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,560 EACH | $3.25 | $4.00 | $3.25 | $3.07 |
| 514E00300 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1 LS | $19,000 | $10,000 | $19,000 | $18,600 |
| 514E00400 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1 LS | $15,000 | $10,000 | $18,900 | $15,000 |
| 514E27700 FIELD PAINTING, MISC.:THREE COAT SYSTEM FOR SPOT R | 53 SF | $245 | $200 | $253 | $240 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 18 SF | $4.25 | $10.00 | $11.00 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 42 SF | $5.50 | $13.00 | $14.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 117 FT | $41.00 | $40.00 | $28.00 | $45.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $750 | $900 | $1,275 | $728 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $775 | $800 | $1,275 | $707 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $12,500 | $10,000 | $9,000 | $15,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 61 CY | $61.00 | $90.00 | $98.00 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 124 FT | $12.00 | $10.00 | $5.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $12.00 | $20.00 | $6.00 | $18.00 |
| 526E90010 TYPE A INSTALLATION | 80 FT | $82.00 | $125 | $135 | $250 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 29 CY | $120 | $150 | $56.00 | $75.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 34 CF | $360 | $310 | $365 | $348 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $35,000 | $21,000 | $30,000 | $37,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $1,500 | $2,000 | $1,800 | $1,750 |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $1,200 | $2,200 | $2,600 | $1,900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $14,000 | $25,000 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 16,920 SY | $28 | $474k | 15% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $400,000 | $400k | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $125k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $110,000 | $110k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $110,000 | $110k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 154 CY | $630 | $97k | 3% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 154 CY | $630 | $97k | 3% |
| 832E30000 EROSION CONTROL | 88,492 EACH | $1 | $88k | 3% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 4,210 FT | $17.3 | $73k | 2% |