ERI-/ERI BH FY2018
ERI County · est $0.4M
Bid dateThursday, February 1—
ERI County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 62 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Suburban Maintenance & Construction | R3Global Outdoor Solutions | R4Complete General Construction Company | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,675 | $27,000 | $28,000 | $25,000 | $64,517 | 11% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 353 SY | $56.16 | $76.00 | $95.00 | $46.00 | $112 | 8% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 21 CY | $895 | $1,000 | $1,000 | $1,600 | $1,240 | 8% |
| 517E75600 |
| Item | Quantity | R1Bcc Ohio INC | R2Suburban Maintenance & Construction | R3Global Outdoor Solutions | R4Complete General Construction Company | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 646E10200 CENTER LINE | 0.04 MILE | $100,643 | $75,000 | $96,000 | $81,800 | $86,807 |
| 614E12350 WORK ZONE IMPACT ATTENUATOR | 4 EACH | $1,302 | $1,780 | $2,000 | $1,800 | $1,889 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,814 | $10,000 | $6,000 | $9,000 | $5,012 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 24 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 212 FT |
| $86.10 |
| $82.00 |
| $84.00 |
| $100 |
| $88.00 |
| 8% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 353 SY | $51.54 | $60.00 | $80.00 | $90.00 | $103 | 8% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 200 SY | $85.73 | $76.00 | $150 | $70.00 | $178 | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 200 SY | $58.44 | $60.00 | $80.00 | $105 | $113 | 5% |
| 511E34411 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN (R | 10 CY | $1,131 | $1,500 | $1,000 | $1,000 | $2,225 | 5% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 10 CY | $1,083 | $1,500 | $800 | $3,000 | $3,500 | 5% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 120 FT | $86.94 | $82.80 | $84.00 | $115 | $88.00 | 4% |
| 511E34411 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN (R | 8 CY | $1,151 | $2,800 | $1,200 | $3,000 | $4,100 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $8,733 | $10,000 | $27,000 | $20,000 | $20,000 | 4% |
| 646E10010 EDGE LINE, 6" | 0.08 MILE | $100,643 | $45,000 | $96,000 | $80,195 | $85,104 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,041 LB | $1.88 | $2.00 | $1.75 | $2.15 | $2.00 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 7 SNMT | $1,065 | $650 | $1,200 | $950 | $849 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $58.80 | $50.00 | $85.00 | $80.00 | $77.00 | 3% |
| 511E46011 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7 CY | $1,004 | $1,500 | $1,100 | $1,850 | $1,736 | 3% |
| 511E45711 CLASS QC1 CONCRETE, ABUTMENT, AS PER PLAN | 4 CY | $1,444 | $1,500 | $850 | $4,200 | $3,611 | 2% |
| 601E27000 DUMPED ROCK FILL, TYPE C | 58 CY | $96.98 | $60.00 | $100 | $75.00 | $145 | 2% |
| 848E50200 FULL-DEPTH REPAIR | 6 CY | $926 | $300 | $500 | $800 | $630 | 2% |
| $15.75 |
| $15.00 |
| $15.00 |
| $8.00 |
| $11.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 20 EACH | $15.75 | $15.00 | $15.00 | $8.00 | $8.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 16 EACH | $13.13 | $12.50 | $13.00 | $16.00 | $15.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.16 MILE | $11,550 | $11,000 | $11,200 | $8,976 | $11,673 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.34 MILE | $6,300 | $6,000 | $7,000 | $6,072 | $6,367 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 57 FT | $6.30 | $6.00 | $7.00 | $3.90 | $7.00 |
| 622E41000 PORTABLE BARRIER, 32" | 300 FT | $5.94 | $22.50 | $21.00 | $22.50 | $20.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED (UNANCHORED) | 240 FT | $4.61 | $22.50 | $22.00 | $23.50 | $25.00 |
| 516E46700 RESET BEARING | 3 EACH | $840 | $800 | $1,200 | $1,050 | $1,220 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $788 | $10,000 | $2,000 | $10,000 | $800 |
| 202E98200 REMOVAL MISC.: JOINT SEAL | 166 FT | $1.77 | $10.00 | $10.00 | $15.00 | $15.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,770 | $7,000 | $5,000 | $15,000 | $9,365 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 631 LB | $1.88 | $2.00 | $3.00 | $3.75 | $3.50 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 200 SY | $20.81 | $30.00 | $16.00 | $25.00 | $27.00 |
| 516E31000 JOINT SEALER | 166 FT | $12.76 | $30.00 | $15.00 | $25.50 | $17.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 46 SF | $90.07 | $130 | $100 | $175 | $182 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 100 FT | $1.68 | $1.60 | $3.00 | $1.60 | $2.00 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 106 FT | $47.25 | $45.00 | $47.00 | $45.00 | $48.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $68.25 | $65.00 | $68.00 | $65.00 | $69.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 1 STA | $78.75 | $75.00 | $80.00 | $75.00 | $729 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50") | 107 SY | $5.04 | $40.00 | $45.00 | $45.00 | $20.00 |
| 407E13900 TACK COAT, 702.13 | 9 GAL | $15.75 | $2.25 | $25.00 | $6.10 | $5.00 |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 4 CY | $1,216 | $1,100 | $1,200 | $990 | $1,034 |
| 510E09950 DOWEL HOLES WITH CEMENT GROUT | 76 EACH | $19.73 | $30.00 | $17.00 | $15.00 | $30.00 |
| 511E45711 CLASS QC1 CONCRETE, ABUTMENT, AS PER PLAN (REPAIR) | 4 CY | $1,261 | $1,500 | $1,200 | $4,000 | $3,800 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: APPROACH SLAB REPAIR | 3 CY | $1,083 | $500 | $850 | $1,800 | $867 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: BACKWALL REPAIR | 1 CY | $3,290 | $500 | $1,000 | $3,000 | $821 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 100 FT | $14.28 | $13.60 | $14.00 | $13.60 | $15.00 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $730 | $695 | $700 | $695 | $738 |
| 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 6 CY | $218 | $200 | $300 | $150 | $162 |
| 848E50000 HAND CHIPPING | 20 SY | $116 | $64.00 | $120 | $75.00 | $85.00 |
| 848E50100 TEST SLAB | 1 LS | $830 | $500 | $1,000 | $500 | $1,900 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1.50") | 353 SY | $12.28 | $12.00 | $17.00 | $27.00 | $17.00 |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 5 CY | $927 | $800 | $1,200 | $2,500 | $2,800 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 100 FT | $1.68 | $1.60 | $4.00 | $1.60 | $2.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $68.25 | $95.00 | $70.00 | $65.00 | $69.00 |
| 202E98100 REMOVAL MISC.: EXISTING PILE ENCASEMENT | 4 EACH | $716 | $300 | $650 | $2,000 | $3,073 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 1 STA | $78.75 | $75.00 | $75.00 | $75.00 | $2,573 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50") | 107 SY | $5.61 | $40.00 | $45.00 | $45.00 | $20.00 |
| 407E13900 TACK COAT, 702.13 | 9 GAL | $15.75 | $2.25 | $25.00 | $6.10 | $5.00 |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 4 CY | $1,216 | $1,100 | $1,000 | $990 | $1,034 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,770 | $4,000 | $5,000 | $15,000 | $12,500 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 774 LB | $1.88 | $2.00 | $2.00 | $2.00 | $3.38 |
| 510E09950 DOWEL HOLES WITH CEMENT GROUT | 44 EACH | $19.73 | $30.00 | $18.00 | $15.00 | $21.00 |
| 511E43211 CLASS QC1 CONCRETE, PIER, AS PER PLAN (REPAIR) | 3 CY | $1,580 | $1,500 | $2,000 | $2,200 | $4,208 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: APPROACH SLAB REPAIR | 3 CY | $927 | $500 | $900 | $1,800 | $775 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: BACKWALL REPAIR | 1 CY | $1,902 | $500 | $1,500 | $3,000 | $1,200 |
| 601E27000 DUMPED ROCK FILL, TYPE C | 47 CY | $96.98 | $60.00 | $100 | $75.00 | $147 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 100 FT | $14.28 | $13.60 | $15.00 | $13.60 | $15.00 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $730 | $695 | $700 | $695 | $738 |
| 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 4 CY | $218 | $200 | $300 | $145 | $279 |
| 848E50000 HAND CHIPPING | 12 SY | $116 | $64.00 | $120 | $75.00 | $71.00 |
| 848E50100 TEST SLAB | 1 LS | $830 | $500 | $1,000 | $500 | $1,900 |
| 848E50200 FULL-DEPTH REPAIR | 3 CY | $926 | $300 | $500 | $800 | $576 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1.25") | 200 SY | $13.05 | $12.00 | $17.00 | $35.00 | $16.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $10,000 | $2,800 | $5,000 | $2,839 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,559 | $8,500 | $4,000 | $6,000 | $3,661 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,179 | $1,000 | $1,000 | $2,000 | $2,582 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $863 | $500 | $4,000 | $3,000 | $2,525 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,675 | $25k | 7% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 353 SY | $56.16 | $20k | 5% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 21 CY | $895 | $19k | 5% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 212 FT | $86.1 | $18k | 5% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 353 SY | $51.54 | $18k | 5% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 200 SY | $85.73 | $17k | 5% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 200 SY | $58.44 | $12k | 3% |
| 511E34411 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN (R | 10 CY | $1,131 | $11k | 3% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 10 CY | $1,083 | $11k | 3% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 120 FT | $86.94 | $10k | 3% |