LAK-SR 2-14.28
LAK County · est $1.5M
Bid dateThursday, February 1—
LAK County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 67 more items below.
| Item | Quantity | R1A P O'horo Company | R2Cuyahoga Bridge & Road INC | R3Keffler Bridge Company | R4Global Outdoor Solutions | R5Great Lakes Construction CO | R6J D Williamson Construction CO INC | R7Suburban Maintenance & Construction | R8INC Dot Construction CORP | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 197,000 LB | $1.33 | $1.42 | $1.49 | $1.55 | $1.43 | $1.51 | $1.52 | $2.00 | 22% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $185,000 | $226,650 | $124,000 | $185,000 |
| Item | Quantity | R1A P O'horo Company | R2Cuyahoga Bridge & Road INC | R3Keffler Bridge Company | R4Global Outdoor Solutions | R5Great Lakes Construction CO | R6J D Williamson Construction CO INC | R7Suburban Maintenance & Construction | R8INC Dot Construction CORP |
|---|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 643 FT | $1.60 | $1.60 | $1.50 | $2.00 | $1.60 | $1.75 | $2.00 | $1.60 |
| 203E10000 EXCAVATION | 278 CY | $22.00 | $20.00 | $30.00 | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $162,000 |
| $256,000 |
| $300,000 |
| $300,000 |
| 16% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 305 CY | $450 | $550 | $700 | $670 | $750 | $600 | $650 | $800 | 12% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 115,910 LB | $0.91 | $1.05 | $1.05 | $0.95 | $0.99 | $1.00 | $1.00 | $1.20 | 9% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 11,500 SF | $5.25 | $8.00 | $8.00 | $8.10 | $5.55 | $5.00 | $5.50 | $5.55 | 5% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 11,500 SF | $5.25 | $3.00 | $3.00 | $3.20 | $4.44 | $5.00 | $5.50 | $4.44 | 5% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 84 CY | $525 | $700 | $700 | $450 | $830 | $640 | $700 | $800 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $22,500 | $40,000 | $20,000 | $33,500 | $85,000 | $50,000 | $100,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | $40,000 | $40,000 | $100,000 | $40,000 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $34,326 | $12,000 | $13,000 | $19,000 | $20,000 | $25,000 | $20,000 | $20,000 | 3% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 170 SY | $170 | $210 | $270 | $230 | $250 | $325 | $265 | $250 | 2% |
| 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 481 FT | $58.00 | $65.00 | $75.00 | $65.00 | $62.40 | $72.00 | $68.00 | $62.40 | 2% |
| 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 26 CY | $940 | $700 | $770 | $1,050 | $1,500 | $1,000 | $1,500 | $800 | 2% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 44 CY | $500 | $600 | $700 | $700 | $1,540 | $675 | $1,800 | $800 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 136 CY | $148 | $155 | $140 | $205 | $202 | $156 | $202 | $202 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $2,500 | $8,000 | $4,000 | $5,000 | $18,000 | $5,000 | $5,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 96 CY | $200 | $160 | $146 | $215 | $210 | $208 | $210 | $210 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 782 SY | $22.00 | $19.00 | $27.00 | $21.00 | $22.22 | $27.00 | $22.00 | $22.22 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,000 | $5,975 | $10,000 | $8,000 | $4,925 | $15,000 | $10,000 | $2,170 | 1% |
| 304E20000 AGGREGATE BASE | 204 CY | $70.00 | $67.00 | $55.00 | $80.00 | $90.00 | $81.00 | $50.00 | $50.00 | 1% |
| $50.00 |
| $24.00 |
| $25.00 |
| $20.00 |
| 203E20000 EMBANKMENT | 24 CY | $16.00 | $20.00 | $32.00 | $50.00 | $90.00 | $50.00 | $50.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 714 SY | $3.00 | $1.50 | $1.00 | $3.00 | $10.00 | $5.00 | $3.00 | $3.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $225 | $200 | $50.00 | $250 | $300 | $175 | $200 | $100 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 4.93 STA | $680 | $130 | $250 | $250 | $220 | $250 | $100 | $220 |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $16.50 | $20.80 | $22.00 | $21.00 | $20.80 | $22.00 | $21.80 | $20.80 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 187.5 FT | $20.00 | $24.40 | $26.00 | $25.00 | $24.40 | $25.50 | $25.80 | $24.40 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $1,850 | $1,725 | $2,000 | $1,750 | $1,725 | $1,900 | $1,695 | $1,725 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $850 | $765 | $800 | $780 | $765 | $800 | $845 | $765 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $1,850 | $1,960 | $2,000 | $2,000 | $1,960 | $2,050 | $2,485 | $1,960 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $450 | $425 | $450 | $450 | $425 | $450 | $1,865 | $425 |
| 607E35000 FENCE REMOVED AND REBUILT | 86 FT | $48.00 | $29.20 | $30.00 | $30.00 | $29.20 | $30.00 | $22.00 | $29.20 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $165 | $150 | $100 | $300 | $165 | $150 | $300 | $165 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 178 SY | $50.00 | $50.00 | $50.00 | $75.00 | $110 | $75.00 | $45.00 | $50.00 |
| 659E00300 TOPSOIL | 63 CY | $30.00 | $50.00 | $25.00 | $80.00 | $50.00 | $50.00 | $30.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 566 SY | $4.00 | $1.75 | $4.00 | $5.00 | $1.75 | $2.00 | $2.80 | $1.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $725 | $800 | $1,000 | $700 | $600 | $750 | $500 | $600 |
| 659E35000 WATER | 3 MGAL | $1.00 | $0.10 | $1.00 | $5.00 | $0.33 | $1.00 | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL | 7,065 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 133 FT | $20.00 | $10.00 | $7.00 | $16.00 | $8.00 | $17.00 | $15.00 | $25.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $500 | $400 | $150 | $1,000 | $700 | $600 | $1,100 | $500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE1.5" | 182 SY | $19.50 | $22.00 | $30.00 | $14.00 | $13.05 | $45.00 | $18.00 | $13.05 |
| 407E10000 TACK COAT | 158 GAL | $5.00 | $2.00 | $1.00 | $5.00 | $3.00 | $5.00 | $3.00 | $3.00 |
| 410E10001 TRAFFIC COMPACTED SURFACE, TYPE A, AS PER PLAN | 50 CY | $40.00 | $65.00 | $20.00 | $90.00 | $29.95 | $75.00 | $120 | $50.00 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (28 CY | $330 | $250 | $275 | $250 | $242 | $345 | $242 | $242 |
| 609E24510 CURB, TYPE 4-C | 37.5 FT | $30.00 | $26.00 | $40.00 | $75.00 | $75.00 | $30.00 | $50.00 | $50.00 |
| 625E00481 CONNECTION, UNFUSED PERMANENT, AS PER PLAN | 1 EACH | $2,000 | $150 | $2,000 | $160 | $150 | $155 | $1,800 | $10,000 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $13,500 | $21,350 | $14,000 | $22,000 | $17,350 | $18,000 | $21,350 | $10,000 |
| 621E00100 RPM | 6 EACH | $150 | $420 | $450 | $600 | $150 | $400 | $63.50 | $605 |
| 626E00102 BARRIER REFLECTOR, TYPE 1BI-DIRECTIONAL | 12 EACH | $6.25 | $6.25 | $8.00 | $8.00 | $6.25 | $6.50 | $10.00 | $6.25 |
| 626E00110 BARRIER REFLECTOR, TYPE 2BI-DIRECTIONAL | 8 EACH | $7.70 | $7.70 | $8.00 | $8.00 | $7.70 | $8.00 | $10.00 | $7.70 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 29 FT | $12.00 | $12.00 | $11.00 | $22.00 | $7.00 | $12.00 | $20.00 | $12.00 |
| 630E80100 SIGN, FLAT SHEET | 18 SF | $31.50 | $31.50 | $30.00 | $22.00 | $13.00 | $30.00 | $20.00 | $31.50 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 6 EACH | $15.00 | $15.00 | $20.00 | $22.00 | $16.00 | $16.00 | $20.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $10.00 | $10.00 | $20.00 | $22.00 | $24.00 | $10.00 | $20.00 | $15.00 |
| 644E00100 EDGE LINE, 4" | 0.22 MILE | $7,315 | $5,000 | $11,000 | $5,500 | $5,000 | $9,300 | $5,000 | $7,315 |
| 644E00300 CENTER LINE | 0.2 MILE | $9,065 | $9,000 | $10,000 | $9,500 | $9,000 | $10,500 | $9,000 | $9,065 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $55.00 | $70.00 | $85.00 | $70.00 | $85.00 | $65.00 | $70.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $100 | $100 | $125 | $400 | $140 | $175 | $200 | $200 |
| 616E10000 WATER | 9 MGAL | $1.00 | $10.00 | $1.00 | $10.00 | $50.00 | $5.00 | $10.00 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $70.00 | $65.00 | $20.00 | $40.00 | $70.00 | $115 | $128 | $50.00 |
| 202E22900 APPROACH SLAB REMOVED | 175 SY | $17.00 | $18.00 | $20.00 | $35.00 | $40.00 | $25.00 | $80.00 | $25.00 |
| 202E23500 WEARING COURSE REMOVED | 175 SY | $20.00 | $2.50 | $1.00 | $15.00 | $16.00 | $7.00 | $18.00 | $20.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 138 CY | $48.00 | $42.00 | $100 | $85.00 | $280 | $128 | $25.00 | $50.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 478 EACH | $14.00 | $17.00 | $13.00 | $17.00 | $25.00 | $18.50 | $30.00 | $20.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $2,000 | $4,500 | $2,500 | $2,600 | $3,100 | $2,500 | $3,000 | $6,000 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 66 FT | $75.00 | $100 | $50.00 | $60.00 | $95.00 | $100 | $70.00 | $95.00 |
| 512E33300 TYPE A WATERPROOFING | 11 SY | $30.00 | $30.00 | $30.00 | $45.00 | $50.00 | $19.00 | $30.00 | $100 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 3,885 EACH | $3.10 | $2.90 | $3.50 | $3.00 | $2.90 | $3.00 | $3.80 | $4.00 |
| 514E10000 FINAL INSPECTION REPAIR | 10 EACH | $1.00 | $1.00 | $1.00 | $5.00 | $5.00 | $50.00 | $10.00 | $5.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 20 SF | $2.50 | $5.00 | $10.00 | $12.00 | $20.00 | $5.00 | $10.00 | $50.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 120 SF | $4.00 | $6.50 | $20.00 | $15.00 | $15.00 | $7.00 | $20.00 | $50.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 77 FT | $25.00 | $25.00 | $46.00 | $26.00 | $45.00 | $60.00 | $30.00 | $40.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $875 | $980 | $900 | $985 | $802 | $800 | $1,100 | $1,000 |
| 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 5 EACH | $825 | $725 | $800 | $775 | $718 | $700 | $1,000 | $1,000 |
| 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $800 | $830 | $800 | $825 | $754 | $750 | $1,000 | $1,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 70 CY | $80.00 | $70.00 | $90.00 | $100 | $120 | $80.00 | $85.00 | $50.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 101 FT | $8.00 | $6.00 | $10.00 | $12.00 | $20.00 | $16.00 | $12.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 51 FT | $10.00 | $10.00 | $20.00 | $13.00 | $35.00 | $16.00 | $12.00 | $12.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 39 SF | $100 | $100 | $220 | $100 | $175 | $195 | $150 | $175 |
| 526E90010 TYPE A INSTALLATION | 75 FT | $120 | $110 | $120 | $120 | $160 | $75.00 | $200 | $200 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 390 SY | $18.00 | $25.00 | $27.00 | $60.00 | $45.00 | $28.00 | $45.00 | $40.00 |
| 625E25920 CONDUIT, MISC.:4" NOMINAL SIZE FIBERGLASS (AT&T), | 1,443 FT | $8.00 | $6.00 | $3.00 | $7.00 | $9.00 | $23.00 | $23.00 | $23.00 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $3,000 | $3,650 | $2,000 | $4,000 | $500 | $3,000 | $4,500 | $5,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $1,500 | $3,000 | $1,100 | $2,500 | $2,000 | $2,000 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $8,800 | $10,000 | $7,000 | $10,000 | $18,000 | $8,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 197,000 LB | $1.33 | $262k | 19% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $185,000 | $185k | 13% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 305 CY | $450 | $137k | 10% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 115,910 LB | $0.91 | $105k | 7% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 11,500 SF | $5.25 | $60k | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 11,500 SF | $5.25 | $60k | 4% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 84 CY | $525 | $44k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $34,326 | $34k | 2% |