ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 63 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Bridge Specialists INC | R3Double Z Construction Company | R4Bcc Ohio INC | R5Eagle Bridge CO | R6Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 803 SY | $65.00 | $54.00 | $76.00 | $69.19 | $83.00 | $81.00 | 13% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 786 SY | $52.00 | $50.00 | $77.00 | $63.08 | $73.00 | $70.00 | 11% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 803 SY | $42.00 | $49.00 |
| Item | Quantity | R1Complete General Construction Company | R2Bridge Specialists INC | R3Double Z Construction Company | R4Bcc Ohio INC | R5Eagle Bridge CO | R6Shelly & Sands INC |
|---|---|---|---|---|---|---|---|
| 659E10000 SEEDING AND MULCHING | 100 SY | $10.00 | $16.80 | $10.00 | $4.83 | $25.00 | $11.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $750 | $400 | $750 | $420 | $1,250 | $794 |
| 659E35000 WATER | 0.5 MGAL | $1.00 | $2.00 | $1.00 | $2.10 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $84.00 |
| $45.62 |
| $48.00 |
| $65.00 |
| 9% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 786 SY | $40.00 | $45.00 | $84.00 | $47.34 | $48.00 | $82.00 | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 86 CY | $320 | $500 | $320 | $501 | $321 | $339 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $60,479 | $20,000 | $35,660 | $20,000 | $20,000 | 5% |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 536 FT | $32.00 | $15.00 | $28.75 | $30.19 | $28.06 | $37.00 | 4% |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 535 FT | $32.00 | $15.00 | $13.00 | $30.19 | $28.06 | $38.00 | 4% |
| 513E95020 STRUCTURAL STEEL, MISC.: REMOVAL AND REPLACEMENT O | 1 LS | $16,000 | $6,615 | $2,000 | $18,330 | $5,000 | $17,363 | 4% |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 485 FT | $32.00 | $15.00 | $13.00 | $30.19 | $27.06 | $38.00 | 4% |
| 513E95020 STRUCTURAL STEEL, MISC.: REMOVAL AND REPLACEMENT O | 1 LS | $15,000 | $5,500 | $2,000 | $18,960 | $5,500 | $17,998 | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $14,500 | $18,232 | $9,000 | $7,875 | $10,000 | $10,000 | 4% |
| 646E10000 EDGE LINE, 4" | 0.56 MILE | $23,230 | $23,230 | $23,230 | $19,415 | $23,283 | $24,574 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,500 | $2,000 | $10,000 | $1,416 | $12,500 | $6,552 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | — | $15.00 | $13.50 | $13.00 | $12.85 | $12.00 | $12.00 | 3% |
| 512E33010 TYPE 3 WATERPROOFING | 387 SY | $30.00 | $35.00 | $28.00 | $38.31 | $30.00 | $32.00 | 3% |
| 513E95020 STRUCTURAL STEEL, MISC.: REMOVAL AND REPLACEMENT O | 1 LS | $11,000 | $1,350 | $2,000 | $15,349 | $2,500 | $13,238 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $11,100 | $28,000 | $27,984 | $20,000 | $30,000 | 3% |
| 513E95020 STRUCTURAL STEEL, MISC.: WELDED JOINT EXTENSIONS | 1 LS | $9,000 | $12,058 | $1,000 | $10,658 | $12,500 | $10,884 | 2% |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 260 FT | $32.00 | $15.00 | $28.75 | $30.19 | $27.06 | $36.00 | 2% |
| $10.00 |
| $1.06 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 152 SY | $35.00 | $13.50 | $13.00 | $12.85 | $12.00 | $13.00 |
| 407E10000 TACK COAT | 155 GAL | $3.00 | $10.00 | $3.00 | $2.89 | $3.01 | $4.00 |
| 423E00200 CRACK SEALING, TYPE I | 710 SY | $5.00 | $5.00 | $2.00 | $7.70 | $7.50 | $4.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $35.45 | $20.00 | $10.00 | $22.13 | $10.00 | $47.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 30 EACH | $16.02 | $20.00 | $10.72 | $16.59 | $9.27 | $18.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 20 EACH | $16.02 | $20.00 | $13.00 | $16.59 | $9.27 | $24.00 |
| 646E10200 CENTER LINE | 0.28 MILE | $24,840 | $24,840 | $24,840 | $38,824 | $24,897 | $26,276 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $65.00 | $75.00 | $65.00 | $58.58 | $75.00 | $75.00 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $2,250 | $2,000 | $1,700 | $1,811 | $1,500 | $2,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 108 SY | $25.50 | $29.00 | $22.00 | $23.10 | $35.00 | $27.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 108 SY | $25.00 | $13.50 | $10.00 | $10.50 | $20.00 | $27.00 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 56 FT | $28.00 | $20.00 | $25.00 | $22.18 | $12.00 | $30.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 80 SF | $85.00 | $135 | $105 | $94.15 | $75.00 | $80.00 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF SCUPPERS | 22 EACH | $125 | $75.00 | $25.00 | $44.25 | $25.00 | $131 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 44 SF | $125 | $150 | $170 | $104 | $200 | $133 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $2,500 | $6,075 | $4,000 | $1,947 | $10,000 | $2,645 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 252 SY | $25.50 | $29.00 | $22.00 | $23.10 | $35.00 | $27.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 252 SY | $25.00 | $13.50 | $10.00 | $10.50 | $20.00 | $27.00 |
| 513E95020 STRUCTURAL STEEL, MISC.:WELDED JOINT EXTENSIONS | 1 LS | $4,750 | $6,078 | $4,500 | $6,098 | $6,750 | $6,019 |
| 516E46700 RESET BEARING | 8 EACH | $250 | $337 | $500 | $949 | $750 | $794 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $3,000 | $4,050 | $4,000 | $4,035 | $8,000 | $3,174 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 57 SF | $85.00 | $135 | $105 | $94.15 | $75.00 | $80.00 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF BACKWALLS | 2 EACH | $950 | $275 | $550 | $1,035 | $2,000 | $901 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF JOINTS FO | 2 EACH | $500 | $275 | $550 | $629 | $1,000 | $721 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF SCUPPERS | 16 EACH | $125 | $75.00 | $25.00 | $49.69 | $25.00 | $113 |
| 530E01100 SPECIAL - STRUCTURES: APPROACH SLAB VOID REPAIR | 5 CY | $500 | $675 | $300 | $505 | $1,250 | $2,168 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 64 SF | $125 | $150 | $200 | $101 | $200 | $132 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 24 CY | $225 | $200 | $180 | $296 | $165 | $172 |
| 848E50000 HAND CHIPPING | 118 SY | $60.00 | $75.00 | $82.00 | $100 | $50.00 | $36.00 |
| 848E50100 TEST SLAB | 1 LS | $2,000 | $1,000 | $500 | $1,066 | $500 | $1,428 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1 1/4" | 786 SY | $7.75 | $13.50 | $16.00 | $8.79 | $12.00 | $10.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 118 SY | $26.00 | $50.00 | $23.00 | $17.70 | $50.00 | $18.00 |
| 516E31000 JOINT SEALER | 53 FT | $28.00 | $15.00 | $25.00 | $23.39 | $40.00 | $30.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $2,500 | $6,075 | $4,000 | $1,947 | $10,000 | $5,290 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 119 SY | $25.50 | $29.00 | $22.00 | $23.10 | $35.00 | $27.00 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 710 SY | $8.75 | $13.50 | $10.00 | $8.24 | $10.00 | $10.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 119 SY | $25.00 | $13.50 | $10.00 | $10.50 | $20.00 | $27.00 |
| 513E95020 STRUCTURAL STEEL, MISC.:WELDED JOINT EXTENSIONS | 1 LS | $4,550 | $5,948 | $3,000 | $5,948 | $6,750 | $5,913 |
| 516E31000 JOINT SEALER | 53 FT | $28.00 | $15.00 | $25.00 | $23.39 | $40.00 | $30.00 |
| 516E46700 RESET BEARING | 8 EACH | $300 | $400 | $410 | $1,000 | $750 | $847 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $4,000 | $5,400 | $4,900 | $5,085 | $8,000 | $4,232 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 84 SF | $85.00 | $135 | $106 | $94.15 | $75.00 | $80.00 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF BACKWALLS | 2 EACH | $950 | $1,350 | $550 | $1,035 | $2,000 | $901 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF JOINTS FO | 2 EACH | $500 | $250 | $550 | $627 | $1,000 | $901 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF SCUPPERS | 12 EACH | $125 | $75.00 | $25.00 | $51.50 | $25.00 | $151 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 32 SF | $125 | $150 | $200 | $103 | $200 | $133 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 117 SY | $25.50 | $29.00 | $22.00 | $23.06 | $35.00 | $27.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 117 SY | $25.00 | $13.50 | $10.00 | $10.50 | $20.00 | $27.00 |
| 516E46700 RESET BEARING | 8 EACH | $250 | $337 | $360 | $949 | $750 | $794 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $3,600 | $4,860 | $4,500 | $4,665 | $8,000 | $3,900 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 19 SF | $85.00 | $135 | $135 | $23.10 | $175 | $80.00 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF BACKWALLS | 2 EACH | $950 | $500 | $550 | $1,035 | $2,000 | $901 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF JOINTS FO | 2 EACH | $500 | $250 | $550 | $627 | $1,000 | $901 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF SCUPPERS | 8 EACH | $125 | $75.00 | $25.00 | $55.13 | $25.00 | $451 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 13 SF | $125 | $150 | $200 | $107 | $375 | $159 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 20 CY | $225 | $200 | $180 | $296 | $165 | $172 |
| 848E50000 HAND CHIPPING | 48 SY | $60.00 | $75.00 | $85.00 | $100 | $50.00 | $34.00 |
| 848E50100 TEST SLAB | 1 LS | $2,000 | $1,000 | $500 | $1,066 | $500 | $1,369 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $9,100 | $8,000 | $8,216 | $10,000 | $3,810 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 803 SY | $65 | $52k | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 786 SY | $52 | $41k | 7% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 803 SY | $42 | $34k | 6% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 786 SY | $40 | $31k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 86 CY | $320 | $28k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 536 FT | $32 | $17k | 3% |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 535 FT | $32 | $17k | 3% |
| 513E95020 STRUCTURAL STEEL, MISC.: REMOVAL AND REPLACEMENT O | 1 LS | $16,000 | $16k | 3% |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 485 FT | $32 | $16k | 3% |