COL-SR 45-23.70
COL County · est $1.1M
Bid dateThursday, February 15—
COL County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 101 more items below.
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Central-allied Enterprises INC | R3R T Vernal Paving & Excavating INC | R4Eclipse CO LLC | R5Parella-pannunzio INC | R6Shelly & Sands INC | R7Karvo Companies INC | R8Americon Industrial Services LLC | R9Barbicas Construction Company INC | R10S E T INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 518 CY | $150 | $110 | $140 | $151 | $155 | $154 | $146 | $152 | $120 | $160 | 12% |
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Central-allied Enterprises INC | R3R T Vernal Paving & Excavating INC | R4Eclipse CO LLC | R5Parella-pannunzio INC | R6Shelly & Sands INC | R7Karvo Companies INC | R8Americon Industrial Services LLC | R9Barbicas Construction Company INC | R10S E T INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 781 SY | $12.00 | $9.50 | $8.00 | $7.40 | $12.00 | $7.00 | $13.40 | $8.00 | $15.00 | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 274 CY | $210 | $168 | $160 | $212 | $215 | $230 | $167 | $175 | $250 | $220 | 9% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,529 FT | $20.00 | $31.50 | $20.00 | $26.72 | $19.50 | $17.50 | $23.00 | $20.00 | $24.00 | $22.00 | 8% |
| 304E20000 AGGREGATE BASE | 762 CY | $65.00 | $70.00 | $52.00 | $67.10 | $68.00 | $113 | $81.00 | $48.00 | $45.00 | $60.00 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $25,000 | $60,000 | $26,747 | $75,000 | $40,000 | $100,000 | $72,465 | $85,000 | $65,900 | 7% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (206 CY | $208 | $130 | $154 | $210 | $213 | $200 | $163 | $180 | $250 | $218 | 7% |
| 611E04400 12" CONDUIT, TYPE B | 1,377 FT | $27.00 | $62.00 | $54.00 | $57.85 | $48.00 | $75.00 | $55.00 | $55.00 | $45.00 | $70.00 | 6% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,500 | $7,000 | $7,500 | $7,934 | $8,000 | $7,500 | $8,000 | $8,000 | $7,700 | $7,500 | 5% |
| 203E10000 EXCAVATION | 1,298 CY | $20.00 | $21.00 | $18.00 | $35.51 | $15.00 | $20.00 | $18.75 | $8.00 | $10.00 | $32.00 | 4% |
| 611E13600 30" CONDUIT, TYPE C | 182 FT | $120 | $95.00 | $90.00 | $95.89 | $200 | $111 | $155 | $95.00 | $80.00 | $150 | 4% |
| 809E69100 STOP-BAR RADAR DETECTION | 3 EACH | $7,000 | $6,500 | $7,000 | $7,419 | $7,400 | $7,000 | $7,500 | $7,500 | $7,200 | $6,550 | 3% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $24,000 | $9,000 | $30,000 | $13,000 | $5,000 | $20,000 | $36,000 | $100,000 | $21,500 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $15,000 | $20,000 | $6,183 | $17,500 | $12,000 | $19,200 | $20,000 | $15,000 | $16,500 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $40,000 | $50,000 | $40,000 | $70,300 | $40,000 | $40,000 | $154,136 | $100,000 | $75,500 | 3% |
| 611E98180 CATCH BASIN, NO. 3A | 13 EACH | $1,500 | $2,650 | $2,300 | $2,128 | $1,700 | $2,600 | $2,200 | $2,000 | $1,965 | $2,500 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 5,997 SY | $3.00 | $1.00 | $2.25 | $3.00 | $3.20 | $2.75 | $2.15 | $1.56 | $3.00 | $3.50 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,885 FT | $8.50 | $7.65 | $10.00 | $7.95 | $12.50 | $15.00 | $8.90 | $7.25 | $5.00 | $10.00 | 3% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,261 SY | $12.00 | $8.25 | $6.00 | $5.01 | $10.50 | $6.00 | $12.40 | $8.50 | $10.00 | $13.00 | 2% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $15,000 | $5,000 | $18,000 | $4,482 | $18,950 | $22,000 | $20,000 | $3,500 | $165 | $17,200 | 2% |
| 202E32000 CURB REMOVED |
| 131 FT |
| $2.00 |
| $8.65 |
| $10.00 |
| $1.58 |
| $6.00 |
| $4.00 |
| $5.45 |
| $2.50 |
| $1.00 |
| $7.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 2,000 FT | $7.00 | $13.50 | $25.00 | $15.65 | $2.00 | $9.00 | $18.50 | $12.00 | $1.00 | $11.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 290 FT | $11.00 | $16.00 | $40.00 | $13.67 | $24.00 | $11.00 | $44.00 | $30.00 | $1.00 | $15.00 |
| 202E58000 MANHOLE REMOVED | 6 EACH | $100 | $350 | $1,500 | $662 | $300 | $195 | $570 | $500 | $100 | $300 |
| 202E58100 CATCH BASIN REMOVED | 22 EACH | $50.00 | $250 | $750 | $378 | $200 | $230 | $350 | $325 | $100 | $200 |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 436 FT | $20.00 | $31.00 | $12.00 | $48.69 | $15.00 | $15.00 | $17.00 | $15.00 | $5.00 | $16.00 |
| 202E98100 REMOVAL MISC.:BOLLARD | 2 EACH | $20.00 | $50.00 | $500 | $64.01 | $100 | $165 | $125 | $100 | $10.00 | $100 |
| 202E98100 REMOVAL MISC.:DECORATIVE LIGHT | 3 EACH | $250 | $350 | $500 | $103 | $100 | $260 | $250 | $250 | $50.00 | $800 |
| 202E98100 REMOVAL MISC.:HOSE BIB | 1 EACH | $100 | $50.00 | $100 | $261 | $100 | $300 | $535 | $100 | $50.00 | $90.00 |
| 202E98100 REMOVAL MISC.:LARGE LANDSCAPING ROCK | 1 EACH | $50.00 | $500 | $1,000 | $54.27 | $100 | $165 | $310 | $100 | $10.00 | $150 |
| 202E98100 REMOVAL MISC.:LIGHT POLE FOUNDATION | 5 EACH | $200 | $275 | $750 | $103 | $200 | $200 | $200 | $200 | $25.00 | $400 |
| 202E98100 REMOVAL MISC.:SIGN | 2 EACH | $200 | $100 | $500 | $214 | $20.00 | $130 | $435 | $50.00 | $10.00 | $1,500 |
| 202E98200 REMOVAL MISC.:RAILROAD TIES | 70 FT | $10.00 | $7.00 | $10.00 | $16.81 | $5.00 | $4.00 | $3.10 | $10.00 | $20.00 | $6.00 |
| 203E20000 EMBANKMENT | 343 CY | $5.00 | $9.00 | $24.00 | $5.62 | $12.00 | $30.00 | $8.00 | $8.00 | $10.00 | $18.00 |
| 204E10000 SUBGRADE COMPACTION | 3,113 SY | $2.50 | $1.50 | $2.00 | $1.98 | $1.75 | $2.60 | $1.50 | $1.25 | $0.25 | $2.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 222 CY | $18.00 | $21.00 | $20.00 | $29.66 | $14.00 | $20.00 | $19.20 | $10.00 | $20.00 | $10.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 222 CY | $45.00 | $48.00 | $52.00 | $61.34 | $58.00 | $70.00 | $58.50 | $42.00 | $40.00 | $45.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $50.00 | $110 | $100 | $207 | $150 | $200 | $140 | $225 | $100 | $250 |
| 204E50000 GEOTEXTILE FABRIC | 667 SY | $2.00 | $1.00 | $2.00 | $1.50 | $2.20 | $1.80 | $1.65 | $1.50 | $75.00 | $1.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $175 | $250 | $155 | $50.00 | $100 | $50.00 | $150 | $25.00 | $100 |
| 659E00300 TOPSOIL | 168 CY | $25.00 | $40.00 | $28.00 | $42.65 | $28.00 | $50.00 | $39.00 | $25.00 | $20.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 1,515 SY | $2.50 | $1.65 | $2.95 | $3.04 | $3.00 | $2.00 | $1.00 | $1.89 | $0.62 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.2 TON | $400 | $900 | $857 | $883 | $850 | $660 | $800 | $625 | $210 | $650 |
| 659E31000 LIME | 0.31 ACRE | $50.00 | $440 | $85.00 | $87.58 | $85.00 | $100 | $0.03 | $100 | $210 | $105 |
| 659E35000 WATER | 8 MGAL | $1.00 | $10.00 | $1.00 | $1.03 | $2.00 | $1.00 | $0.01 | $1.00 | $5.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $3,000 | $3,000 | $1,108 | $1,500 | $1,100 | $1,075 | $4,075 | $750 | $5,000 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 180 FT | $8.50 | $21.50 | $15.00 | $16.50 | $10.00 | $22.00 | $15.00 | $20.00 | $15.00 | $19.00 |
| 611E01100 6" CONDUIT, TYPE C | 154 FT | $18.50 | $22.50 | $12.00 | $23.86 | $11.50 | $32.00 | $20.00 | $20.00 | $7.00 | $25.00 |
| 611E04600 12" CONDUIT, TYPE C | 241 FT | $27.00 | $52.50 | $42.00 | $51.43 | $38.00 | $66.00 | $45.00 | $55.00 | $45.00 | $45.00 |
| 611E05900 15" CONDUIT, TYPE B | 30 FT | $30.00 | $66.00 | $65.00 | $94.13 | $75.00 | $84.00 | $56.00 | $75.00 | $55.00 | $95.00 |
| 611E07400 18" CONDUIT, TYPE B | 52 FT | $33.00 | $80.00 | $110 | $63.57 | $115 | $98.00 | $110 | $90.00 | $60.00 | $98.00 |
| 611E07600 18" CONDUIT, TYPE C | 243 FT | $29.00 | $61.00 | $68.00 | $52.28 | $58.00 | $71.00 | $53.00 | $75.00 | $50.00 | $75.00 |
| 611E13400 30" CONDUIT, TYPE B | 108 FT | $130 | $120 | $90.00 | $128 | $212 | $153 | $245 | $105 | $82.00 | $190 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $2,000 | $3,450 | $2,000 | $2,250 | $2,200 | $3,250 | $3,300 | $3,000 | $1,800 | $2,890 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 5 EACH | $2,400 | $3,500 | $2,900 | $2,742 | $3,600 | $4,700 | $2,850 | $2,500 | $2,600 | $3,200 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $950 | $2,350 | $1,400 | $1,375 | $1,200 | $2,000 | $1,300 | $1,500 | $800 | $1,500 |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $3,000 | $3,150 | $2,400 | $2,562 | $3,250 | $3,300 | $2,400 | $3,600 | $2,200 | $2,350 |
| 611E99582 MANHOLE, NO. 3 WITH 90" BASE I.D. AND 8" WEIR | 1 EACH | $3,300 | $16,500 | $6,000 | $6,006 | $8,975 | $6,900 | $5,800 | $8,738 | $4,000 | $8,950 |
| 839E30000 TRENCH DRAIN WITH STANDARD GRATE | 124 FT | $120 | $165 | $105 | $123 | $132 | $90.00 | $95.00 | $115 | $160 | $100 |
| 839E30001 TRENCH DRAIN WITH STANDARD GRATE, AS PER PLAN | 30 FT | $120 | $165 | $105 | $170 | $149 | $150 | $75.00 | $150 | $180 | $120 |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $9,500 | $35,000 | $18,000 | $17,952 | $21,500 | $26,000 | $18,000 | $23,422 | $12,690 | $25,500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 2,884 FT | $2.50 | $2.50 | $2.50 | $2.06 | $2.20 | $2.00 | $2.10 | $2.00 | $1.50 | $2.50 |
| 407E10000 TACK COAT | 489 GAL | $3.00 | $1.75 | $2.00 | $3.00 | $3.00 | $2.90 | $1.75 | $2.00 | $2.26 | $3.00 |
| 408E10000 PRIME COAT | 816 GAL | $4.50 | $2.80 | $3.00 | $4.50 | $4.50 | $4.00 | $5.00 | $3.00 | $4.50 | $4.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 117 SY | $70.00 | $87.00 | $65.00 | $67.79 | $68.00 | $61.00 | $69.50 | $105 | $70.00 | $75.00 |
| 609E26000 CURB, TYPE 6 | 431 FT | $20.00 | $53.00 | $25.00 | $22.36 | $33.00 | $20.00 | $30.00 | $19.50 | $40.00 | $25.00 |
| 621E00100 RPM | 37 EACH | $40.00 | $40.00 | $87.50 | $38.13 | $87.50 | $40.00 | $87.50 | $143 | $150 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 19 EACH | $5.00 | $1.00 | $10.00 | $8.94 | $18.00 | $5.50 | $20.00 | $5.00 | $1.00 | $4.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 184 FT | $9.50 | $9.50 | $9.50 | $9.79 | $9.50 | $10.00 | $9.50 | $9.50 | $20.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 82.8 FT | $11.00 | $11.00 | $11.00 | $11.33 | $11.00 | $11.00 | $11.00 | $11.00 | $30.00 | $12.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 60.8 FT | $11.50 | $11.50 | $11.50 | $11.85 | $11.50 | $12.00 | $11.50 | $11.50 | $32.00 | $12.00 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 1 EACH | $395 | $395 | $395 | $407 | $400 | $400 | $395 | $395 | $4,000 | $420 |
| 630E80100 SIGN, FLAT SHEET | 155 SF | $18.40 | $18.40 | $18.40 | $18.96 | $20.00 | $19.00 | $18.40 | $18.40 | $30.00 | $20.00 |
| 630E82000 SIGN BACKING ASSEMBLY | 2 EACH | $115 | $115 | $115 | $119 | $120 | $120 | $115 | $115 | $500 | $120 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 33 EACH | $10.00 | $10.00 | $10.00 | $10.30 | $10.00 | $10.00 | $10.00 | $10.00 | $2.00 | $11.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 19 EACH | $15.00 | $15.00 | $15.00 | $15.46 | $15.00 | $15.00 | $15.00 | $15.00 | $2.00 | $16.00 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $5,800 | $5,800 | $5,800 | $20,145 | $5,800 | $15,000 | $5,800 | $14,360 | $5,800 | $6,200 |
| 646E10200 CENTER LINE | 0.33 MILE | $9,500 | $9,500 | $9,500 | $20,866 | $9,500 | $22,500 | $9,500 | $21,540 | $9,500 | $10,000 |
| 646E10300 CHANNELIZING LINE, 8" | 625 FT | $2.05 | $2.05 | $2.05 | $2.58 | $2.05 | $2.00 | $2.05 | $1.90 | $2.05 | $2.25 |
| 646E10400 STOP LINE | 63 FT | $13.00 | $13.00 | $13.00 | $15.46 | $13.00 | $12.00 | $13.00 | $11.50 | $13.00 | $14.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 174 FT | $9.00 | $9.00 | $9.00 | $8.76 | $9.00 | $9.00 | $9.00 | $8.67 | $9.00 | $9.50 |
| 646E20300 LANE ARROW | 9 EACH | $165 | $165 | $165 | $181 | $165 | $152 | $165 | $144 | $165 | $175 |
| 611E00400 4" CONDUIT, TYPE E | 40 FT | $3.00 | $23.50 | $3.00 | $2.06 | $32.00 | $3.00 | $3.00 | $3.00 | $20.00 | $30.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL AT25ON | 1 EACH | $1,800 | $1,550 | $1,800 | $2,323 | $2,200 | $1,900 | $1,800 | $1,800 | $2,000 | $2,100 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 1 EACH | $1,500 | $1,250 | $1,500 | $1,855 | $2,200 | $1,500 | $1,500 | $1,500 | $1,800 | $1,850 |
| 625E25500 CONDUIT, 3", 725.04 | 179 FT | $15.00 | $18.50 | $15.00 | $20.61 | $20.00 | $15.00 | $15.00 | $15.00 | $20.00 | $20.00 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3" | 160 FT | $35.00 | $46.00 | $35.00 | $38.13 | $55.00 | $35.00 | $35.00 | $35.00 | $37.00 | $50.00 |
| 625E29000 TRENCH | 121 FT | $7.00 | $5.65 | $7.00 | $14.43 | $9.00 | $7.00 | $10.00 | $10.00 | $14.00 | $10.00 |
| 625E29600 TRENCH IN PAVED AREA, TYPE B | 58 FT | $35.00 | $38.00 | $35.00 | $26.79 | $68.00 | $35.00 | $35.00 | $35.00 | $26.00 | $60.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $800 | $650 | $800 | $824 | $900 | $800 | $800 | $800 | $800 | $850 |
| 625E32000 GROUND ROD | 4 EACH | $200 | $125 | $200 | $273 | $160 | $200 | $200 | $200 | $265 | $150 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 5 EACH | $850 | $660 | $850 | $1,133 | $725 | $850 | $950 | $950 | $1,100 | $650 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 4 EACH | $1,100 | $1,100 | $1,100 | $1,546 | $1,200 | $1,100 | $1,500 | $1,500 | $1,500 | $1,100 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 9 EACH | $25.00 | $30.00 | $25.00 | $36.07 | $50.00 | $25.00 | $25.00 | $25.00 | $35.00 | $45.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 522 FT | $2.50 | $1.40 | $2.50 | $2.58 | $3.00 | $2.50 | $2.50 | $2.50 | $2.50 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 237 FT | $3.00 | $4.20 | $3.00 | $2.99 | $3.00 | $3.00 | $3.00 | $3.00 | $2.90 | $3.00 |
| 632E40900 SIGNAL CABLE, 9 CONDUCTOR, NO. 14 AWG | 239 FT | $3.50 | $4.50 | $3.50 | $3.40 | $3.00 | $3.50 | $3.50 | $3.50 | $3.30 | $3.00 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $3,500 | $2,650 | $3,500 | $6,183 | $4,300 | $3,700 | $3,500 | $3,500 | $6,000 | $4,000 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 129 FT | $6.00 | $2.45 | $6.00 | $2.06 | $4.00 | $6.00 | $6.00 | $6.00 | $2.00 | $4.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,500 | $2,250 | $1,500 | $1,494 | $2,800 | $1,500 | $1,500 | $1,500 | $1,450 | $2,600 |
| 632E80102 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 1 | 1 EACH | $3,500 | $4,150 | $3,500 | $3,864 | $4,600 | $3,500 | $4,000 | $4,000 | $3,750 | $4,350 |
| 632E80620 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13 | 1 EACH | $9,500 | $11,800 | $9,500 | $10,304 | $12,500 | $10,000 | $10,000 | $10,000 | $10,000 | $11,500 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $2,000 | $4,500 | $2,000 | $618 | $2,800 | $2,000 | $2,000 | $2,000 | $600 | $2,600 |
| 633E65532 CABINET, TYPE 336L | 1 EACH | $6,800 | $7,500 | $6,800 | $6,389 | $8,000 | $7,000 | $7,500 | $7,500 | $6,200 | $7,500 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,500 | $2,000 | $1,500 | $2,834 | $1,800 | $1,500 | $2,000 | $2,000 | $2,750 | $1,600 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $350 | $450 | $350 | $361 | $800 | $370 | $350 | $350 | $350 | $750 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $5,400 | $5,500 | $5,976 | $6,000 | $5,500 | $5,500 | $5,500 | $5,800 | $5,600 |
| 633E99000 CONTROLLER ITEM, MISC.:CONTROLLER UNIT, INSTALLATI | 1 EACH | $1,500 | $1,100 | $1,500 | $1,700 | $2,000 | $1,500 | $1,500 | $1,500 | $1,650 | $2,000 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 30 CY | $65.00 | $66.00 | $60.00 | $83.43 | $70.00 | $100 | $70.00 | $75.00 | $200 | $40.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $70.00 | $65.00 | $65.00 | $66.98 | $45.00 | $85.00 | $65.00 | $70.00 | $60.00 | $45.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $70.00 | $210 | $200 | $189 | $150 | $157 | $140 | $200 | $175 | $150 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.85 MILE | $12,144 | $950 | $12,070 | $12,514 | $11,500 | $12,800 | $11,500 | $12,144 | $11,500 | $12,800 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.12 MILE | $6,336 | $565 | $9,055 | $6,529 | $8,500 | $6,700 | $8,500 | $6,336 | $8,500 | $6,700 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 325 FT | $6.85 | $0.20 | $2.30 | $7.06 | $2.20 | $7.00 | $2.20 | $6.85 | $2.20 | $7.00 |
| 614E25400 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 740.0 | 87 FT | $4.55 | $0.20 | $6.90 | $4.69 | $5.00 | $5.00 | $5.00 | $4.55 | $5.00 | $5.00 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 108 FT | $4.25 | $0.30 | $6.90 | $4.38 | $6.00 | $4.50 | $6.00 | $4.25 | $6.00 | $5.00 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 3 EACH | $110 | $45.00 | $260 | $113 | $150 | $115 | $150 | $110 | $150 | $120 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 5 EACH | $150 | $500 | $255 | $155 | $400 | $158 | $400 | $150 | $400 | $160 |
| 616E10000 WATER | 20 MGAL | $0.50 | $10.00 | $10.00 | $18.66 | $1.00 | $45.00 | $10.00 | $1.00 | $250 | $2.00 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $400 | $1,350 | $1,200 | $1,100 | $1,200 | $2,200 | $1,750 | $1,500 | $600 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 518 CY | $150 | $78k | 8% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 274 CY | $210 | $58k | 6% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,529 FT | $20 | $51k | 5% |
| 304E20000 AGGREGATE BASE | 762 CY | $65 | $50k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $45k | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (206 CY | $208 | $43k | 5% |
| 611E04400 12" CONDUIT, TYPE B | 1,377 FT | $27 | $37k | 4% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,500 | $30k | 3% |
| 203E10000 EXCAVATION | 1,298 CY | $20 | $26k | 3% |
| 611E13600 30" CONDUIT, TYPE C | 182 FT | $120 | $22k | 2% |