GEA-US 422-16.38
GEA County · est $1.4M
Bid dateThursday, February 15—
GEA County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 101 more items below.
| Item | Quantity | R1Keffler Bridge Company | R2Shelly & Sands INC | R3Cuyahoga Bridge & Road INC | R4J D Williamson Construction CO INC | R5Dot Construction CORP | R6Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 511E33415 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 401 CY | $570 | $880 | $712 | $850 | $700 | $965 | 24% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 94,837 LB | $1.40 | $1.20 | $1.50 | $1.25 | $1.50 | $1.25 | 14% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $70,000 | $72,000 |
| Item | Quantity | R1Keffler Bridge Company | R2Shelly & Sands INC | R3Cuyahoga Bridge & Road INC | R4J D Williamson Construction CO INC | R5Dot Construction CORP | R6Rietschlin Construction INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $2,700 | $2,500 | $20,000 | $10,000 | $7,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 499 SY | $14.00 | $7.00 | $3.00 | $8.00 | $20.00 | $15.75 |
| 202E32000 CURB REMOVED | 317 FT | $2.00 | $11.00 | $2.50 | $6.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $300,000 |
| $275,000 |
| $150,000 |
| $385,600 |
| 7% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 311 SY | $210 | $284 | $225 | $250 | $250 | $252 | 7% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 1,420 SY | $40.00 | $36.00 | $70.00 | $47.00 | $80.00 | $40.00 | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $43,000 | $21,000 | $16,000 | $110,000 | $50,000 | $196,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $39,000 | $21,000 | $35,000 | $50,000 | $34,200 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | $100,000 | $130,000 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 264 CY | $145 | $133 | $140 | $142 | $144 | $154 | 4% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $35,000 | $47,000 | $15,000 | $45,000 | $50,000 | $26,800 | 4% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 430 SF | $70.00 | $86.00 | $79.00 | $95.00 | $100 | $77.00 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $30,000 | $16,000 | $19,000 | $30,000 | $30,000 | $50,000 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 1,720 FT | $10.00 | $12.00 | $18.00 | $15.50 | $10.00 | $21.00 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 308 CY | $55.00 | $70.00 | $40.00 | $61.00 | $60.00 | $68.00 | 2% |
| 304E20000 AGGREGATE BASE | 238 CY | $70.00 | $78.00 | $70.00 | $65.00 | $75.00 | $89.00 | 2% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 8 MNTH | $2,000 | $3,000 | $1,950 | $2,000 | $1,500 | $1,650 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 47 CF | $331 | $280 | $380 | $350 | $450 | $301 | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 469 SY | $33.00 | $17.00 | $12.00 | $20.00 | $20.00 | $19.50 | 2% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 114 FT | $125 | $171 | $125 | $90.00 | $150 | $130 | 2% |
| $10.00 |
| $3.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 245 FT | $11.00 | $14.00 | $12.00 | $11.00 | $10.00 | $33.75 |
| 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN | 523 FT | $9.00 | $14.00 | $14.00 | $11.00 | $10.00 | $19.00 |
| 202E38000 GUARDRAIL REMOVED | 429 FT | $1.50 | $1.70 | $1.60 | $1.75 | $1.50 | $4.50 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $150 | $150 | $145 | $150 | $145 | $325 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $150 | $62.00 | $60.00 | $60.00 | $60.00 | $325 |
| 202E58101 CATCH BASIN REMOVED, AS PER PLAN | 7 EACH | $500 | $225 | $300 | $425 | $500 | $560 |
| 202E58200 INLET REMOVED | 1 EACH | $500 | $170 | $500 | $260 | $1,000 | $870 |
| 202E98100 REMOVAL MISC.:REMOVE CATCH BASIN STEEL PLATE | 2 EACH | $500 | $85.00 | $100 | $450 | $100 | $350 |
| 203E10000 EXCAVATION | 220 CY | $9.00 | $26.00 | $18.00 | $21.00 | $30.00 | $25.00 |
| 203E20000 EMBANKMENT | 222 CY | $12.00 | $13.50 | $8.00 | $15.00 | $40.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 1,470 SY | $1.00 | $1.90 | $1.50 | $5.50 | $2.00 | $1.90 |
| 204E13000 EXCAVATION OF SUBGRADE | 290 CY | $18.00 | $25.00 | $10.00 | $20.00 | $30.00 | $19.50 |
| 204E45000 PROOF ROLLING | 2 HOUR | $100 | $160 | $200 | $250 | $100 | $220 |
| 204E50000 GEOTEXTILE FABRIC | 698 SY | $4.00 | $2.50 | $1.00 | $2.00 | $12.00 | $2.75 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 6 STA | $1,200 | $541 | $385 | $400 | $385 | $467 |
| 606E15050 GUARDRAIL, TYPE MGS | 487.5 FT | $20.00 | $21.00 | $20.40 | $21.00 | $20.40 | $20.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,000 | $1,900 | $1,875 | $2,000 | $1,875 | $2,310 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $800 | $810 | $765 | $800 | $765 | $908 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,000 | $2,100 | $2,045 | $2,150 | $2,045 | $2,145 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $450 | $480 | $470 | $500 | $470 | $440 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 8 SY | $50.00 | $90.00 | $70.00 | $265 | $400 | $105 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 50 SY | $35.00 | $54.00 | $55.00 | $95.00 | $200 | $63.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 4 CY | $33.00 | $130 | $100 | $125 | $1,000 | $303 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $105 | $100 | $100 | $100 | $55.00 |
| 659E00300 TOPSOIL | 177 CY | $12.00 | $28.00 | $32.00 | $33.00 | $32.00 | $29.75 |
| 659E10000 SEEDING AND MULCHING | 1,599 SY | $2.00 | $1.82 | $1.00 | $1.00 | $1.00 | $2.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 80 SY | $0.50 | $1.00 | $2.00 | $2.00 | $2.00 | $2.50 |
| 659E15000 INTER-SEEDING | 80 SY | $0.50 | $1.00 | $0.10 | $0.25 | $10.00 | $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $525 | $630 | $800 | $825 | $800 | $700 |
| 659E31000 LIME | 0.33 ACRE | $105 | $125 | $0.09 | $30.00 | $1.00 | $100 |
| 659E35000 WATER | 13 MGAL | $1.00 | $1.00 | $0.10 | $2.00 | $1.00 | $11.00 |
| 602E20000 CONCRETE MASONRY | 0.52 CY | $1,500 | $2,700 | $1,000 | $2,750 | $5,000 | $3,100 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 152 FT | $10.00 | $17.00 | $15.00 | $12.00 | $20.00 | $14.50 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 721 FT | $17.00 | $13.00 | $10.00 | $12.00 | $20.00 | $14.50 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 99 FT | $17.00 | $18.00 | $12.00 | $20.00 | $20.00 | $20.00 |
| 611E04400 12" CONDUIT, TYPE B | 35 FT | $53.00 | $200 | $37.00 | $70.00 | $30.00 | $77.00 |
| 611E04400 12" CONDUIT, TYPE B, FOR DRAINAGE CONNECTION | 50 FT | $30.00 | $81.00 | $38.00 | $30.00 | $30.00 | $57.00 |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 266 FT | $32.00 | $52.00 | $32.00 | $70.00 | $40.00 | $43.00 |
| 611E04600 12" CONDUIT, TYPE C | 120 FT | $35.00 | $66.00 | $32.00 | $42.00 | $40.00 | $48.00 |
| 611E04600 12" CONDUIT, TYPE C, FOR DRAINAGE CONNECTION | 50 FT | $20.00 | $55.00 | $30.00 | $20.00 | $40.00 | $47.50 |
| 611E04601 12" CONDUIT, TYPE C, AS PER PLAN | 261 FT | $32.00 | $44.00 | $32.00 | $40.00 | $40.00 | $30.00 |
| 611E05100 12" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION | 20 FT | $20.00 | $52.00 | $30.00 | $20.00 | $40.00 | $60.00 |
| 611E05200 12" CONDUIT, TYPE F, 707.05 | 34 FT | $50.00 | $80.00 | $60.00 | $60.00 | $40.00 | $120 |
| 611E05200 12" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 20 FT | $20.00 | $52.00 | $32.00 | $25.00 | $40.00 | $60.00 |
| 611E06100 15" CONDUIT, TYPE C | 13 FT | $39.00 | $99.00 | $37.00 | $55.00 | $50.00 | $111 |
| 611E06700 15" CONDUIT, TYPE F, 707.05 | 58 FT | $52.00 | $103 | $62.00 | $75.00 | $50.00 | $100 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $4,000 | $3,400 | $2,000 | $2,500 | $2,000 | $6,560 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,200 | $2,350 | $900 | $1,250 | $2,000 | $1,775 |
| 611E98471 CATCH BASIN, NO. 2-2B, AS PER PLAN | 8 EACH | $1,200 | $2,300 | $1,000 | $1,200 | $2,000 | $1,460 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,300 | $1,190 | $600 | $800 | $2,000 | $1,700 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $1,600 | $2,800 | $2,000 | $2,000 | $4,000 | $4,400 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $100 | $345 | $100 | $250 | $400 | $250 |
| 611E99900 DRAINAGE STRUCTURE, MISC.: COVER CATCH BASIN WITH | 2 EACH | $500 | $285 | $200 | $500 | $1,000 | $625 |
| 407E10000 TACK COAT | 125 GAL | $5.00 | $2.00 | $2.00 | $4.00 | $4.00 | $2.20 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 45 CY | $260 | $370 | $250 | $272 | $270 | $275 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (54 CY | $180 | $270 | $175 | $200 | $224 | $193 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (20 CY | $310 | $600 | $300 | $415 | $250 | $330 |
| 609E24510 CURB, TYPE 4-C | 308 FT | $37.00 | $30.00 | $20.00 | $40.00 | $25.00 | $15.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 5 CY | $70.00 | $100 | $90.00 | $150 | $72.65 | $196 |
| 618E40101 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN | 2,385 FT | $2.00 | $2.00 | $1.90 | $3.00 | $1.90 | $2.50 |
| 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO | 37 SY | $10.00 | $140 | $67.50 | $70.00 | $50.00 | $60.00 |
| 621E00100 RPM | 45 EACH | $60.00 | $74.00 | $70.00 | $90.00 | $70.00 | $77.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1 WAY | 6 EACH | $8.00 | $6.50 | $6.25 | $6.50 | $6.25 | $11.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, 1 WAY | 6 EACH | $11.00 | $7.00 | $6.85 | $7.25 | $6.85 | $9.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 54 FT | $14.00 | $15.50 | $15.00 | $15.00 | $15.00 | $11.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $40.00 | $42.00 | $40.00 | $40.00 | $40.00 | $44.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $40.00 | $26.00 | $25.00 | $25.00 | $25.00 | $38.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $20.00 | $10.50 | $10.00 | $10.00 | $10.00 | $16.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $80.00 | $58.00 | $55.00 | $55.00 | $55.00 | $66.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $20.00 | $10.50 | $10.00 | $10.00 | $10.00 | $16.50 |
| 644E00104 EDGE LINE, 6" | 0.99 MILE | $4,000 | $6,300 | $6,250 | $4,750 | $7,735 | $8,500 |
| 644E00204 LANE LINE, 6" | 0.66 MILE | $2,000 | $3,200 | $2,063 | $3,700 | $1,935 | $2,200 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 6 EACH | $2,000 | $1,880 | $1,865 | $2,000 | $1,865 | $2,200 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1 WAY | 57 EACH | $6.00 | $6.00 | $5.00 | $20.00 | $20.00 | $22.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3, 1 WAY | 14 EACH | $6.00 | $9.00 | $5.00 | $20.00 | $20.00 | $22.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 49 EACH | $6.00 | $12.00 | $12.80 | $10.00 | $9.75 | $10.75 |
| 614E13360 OBJECT MARKER, TWO WAY | 11 EACH | $11.00 | $15.00 | $17.25 | $15.00 | $12.50 | $13.75 |
| 614E18030 MAINTAINING TRAFFIC, MISC.: REMOVAL OF RUMBLE STRI | 492 FT | $15.00 | $19.00 | $24.60 | $26.50 | $10.00 | $30.75 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.16 MILE | $4,200 | $1,200 | $1,155 | $1,200 | $1,155 | $1,300 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.79 MILE | $2,500 | $4,700 | $4,615 | $1,600 | $4,615 | $5,100 |
| 616E10000 WATER | 1 MGAL | $1.00 | $30.00 | $10.00 | $5.00 | $1.00 | $11.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 32 EACH | $55.00 | $47.00 | $45.00 | $50.00 | $45.00 | $49.50 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 530 FT | $19.00 | $24.00 | $45.00 | $23.50 | $12.00 | $60.00 |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT, AS PER PLAN | 1 LS | $200 | $500 | $1.00 | $250 | $1,000 | $250 |
| 202E22900 APPROACH SLAB REMOVED | 290 SY | $25.00 | $31.00 | $25.00 | $25.00 | $25.00 | $44.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.00 | $2.00 | $2.50 | $2.00 | $1.50 | $4.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 144 EACH | $13.00 | $28.00 | $16.00 | $19.50 | $30.00 | $25.00 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 24 CY | $500 | $670 | $700 | $700 | $700 | $868 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 713 SY | $17.00 | $28.00 | $18.00 | $37.00 | $30.00 | $27.50 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 200 FT | $25.00 | $86.00 | $80.00 | $100 | $100 | $77.00 |
| 512E33000 TYPE 2 WATERPROOFING | 52 SY | $25.00 | $39.00 | $25.00 | $20.00 | $40.00 | $28.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 94 SF | $10.00 | $7.00 | $5.00 | $6.00 | $20.00 | $12.25 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 110 CY | $90.00 | $112 | $80.00 | $88.00 | $70.00 | $73.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 181 FT | $10.00 | $6.00 | $5.00 | $13.50 | $12.00 | $11.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 28 FT | $20.00 | $11.00 | $12.00 | $13.50 | $12.00 | $26.00 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: TEMPORARY SHORING | 1 LS | $12,000 | $30,000 | $70,000 | $20,000 | $150,000 | $30,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $8,400 | $13,000 | $17,000 | $17,000 | $16,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,000 | $22,000 | $9,750 | $15,000 | $10,000 | $7,260 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E33415 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 401 CY | $570 | $229k | 18% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 94,837 LB | $1.4 | $133k | 11% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $70,000 | $70k | 6% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 311 SY | $210 | $65k | 5% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 1,420 SY | $40 | $57k | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $43,000 | $43k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 264 CY | $145 | $38k | 3% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $35,000 | $35k | 3% |