HAM-Harrison Ave Bikepath
HAM County · est $0.7M
Bid dateThursday, February 15—
HAM County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Ford Development CORP | R2Brown Construction & Paving CORP | R3Rack & Ballauer Excavating CO INC | R4Barrett Paving Materials INC | R5Sunesis Construction CO | R6John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 616 CY | $165 | $154 | $173 | $135 | $139 | $165 | 18% |
| 203E10000 EXCAVATION | 2,789 CY | $35.00 | $22.00 | $30.00 | $30.00 | $30.75 | $37.00 | 17% |
| 611E07900 18" CONDUIT, TYPE D | 189 FT | $350 | $165 |
| Item | Quantity | R1Ford Development CORP | R2Brown Construction & Paving CORP | R3Rack & Ballauer Excavating CO INC | R4Barrett Paving Materials INC | R5Sunesis Construction CO | R6John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,000 | $10,000 | $58,000 | $36,052 | $6,500 |
| 202E20010 HEADWALL REMOVED | 9 EACH | $100 | $1,000 | $420 | $350 | $1,200 | $400 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 67 SY | $10.00 | $10.25 | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $230 |
| $205 |
| $269 |
| $200 |
| 11% |
| 602E20000 CONCRETE MASONRY | 56 CY | $800 | $100 | $1,625 | $880 | $1,605 | $615 | 8% |
| 611E13900 30" CONDUIT, TYPE D | 92 FT | $400 | $195 | $265 | $215 | $357 | $230 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 149 CY | $210 | $164 | $244 | $195 | $195 | $210 | 5% |
| 607E98000 FENCE, MISC.:BIKEWAY RAILING | 1,060 FT | $27.00 | $95.00 | $23.70 | $23.70 | $23.75 | $27.00 | 5% |
| 625E25402 CONDUIT, 2", 725.05 | 8,538 FT | $3.00 | $3.00 | $2.95 | $2.95 | $2.90 | $8.00 | 4% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $7,500 | $30,000 | $20,000 | $45,300 | $15,000 | 3% |
| 625E29002 TRENCH, 24" DEEP | 2,846 FT | $6.00 | $6.75 | $6.45 | $6.45 | $6.80 | $11.00 | 3% |
| 611E04600 12" CONDUIT, TYPE C | 168 FT | $100 | $105 | $61.00 | $72.00 | $56.25 | $68.00 | 3% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $14,510 | $2,000 | $13,000 | $12,000 | $2,775 | $4,000 | 3% |
| 609E26000 CURB, TYPE 6 | 280 FT | $40.00 | $52.00 | $30.00 | $28.00 | $26.25 | $34.00 | 2% |
| 611E98510 CATCH BASIN, NO. 2-3 | 3 EACH | $3,000 | $900 | $2,200 | $3,300 | $1,940 | $2,325 | 2% |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, 36" DEEP | 234 CY | $35.00 | $9.25 | $35.00 | $38.00 | $17.50 | $34.00 | 1% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 79 SY | $100 | $121 | $92.00 | $85.00 | $95.00 | $102 | 1% |
| 659E00300 TOPSOIL | 784 CY | $10.00 | $58.00 | $40.00 | $40.00 | $60.50 | $68.00 | 1% |
| 611E04400 12" CONDUIT, TYPE B | 46 FT | $150 | $65.00 | $60.00 | $72.00 | $91.00 | $98.00 | 1% |
| 670E00500 SLOPE EROSION PROTECTION | 2,134 SY | $3.00 | $7.75 | $2.25 | $2.25 | $2.70 | $4.50 | 1% |
| $5.00 |
| $20.50 |
| $25.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 185 FT | $1.00 | $155 | $25.00 | $105 | $23.25 | $80.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 89 FT | $2.00 | $195 | $25.00 | $110 | $29.50 | $82.00 |
| 203E20000 EMBANKMENT | 637 CY | $10.00 | $33.00 | $15.00 | $18.00 | $13.25 | $34.00 |
| 204E10000 SUBGRADE COMPACTION | 4,449 SY | $1.00 | $3.75 | $2.00 | $1.00 | $3.70 | $2.00 |
| 204E20000 EMBANKMENT | 234 CY | $10.00 | $33.00 | $15.00 | $34.00 | $10.10 | $55.00 |
| 204E45000 PROOF ROLLING | 11 HOUR | $50.00 | $100 | $180 | $200 | $215 | $200 |
| 690E50610 SPECIAL - BOLLARD, HINGED | 1 EACH | $700 | $300 | $575 | $575 | $715 | $650 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $5,000 | $7,500 | $3,000 | $15,000 | $5,200 | $5,600 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 28 CY | $100 | $78.00 | $250 | $185 | $127 | $195 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 6 CY | $100 | $78.00 | $225 | $180 | $125 | $260 |
| 659E00550 SEEDING AND MULCHING, CLASS 4A | 4,908 SY | $1.00 | $2.42 | $0.90 | $0.90 | $3.75 | $3.50 |
| 659E00580 SEEDING AND MULCHING, CLASS 5B | 1,652 SY | $2.00 | $4.00 | $0.90 | $0.90 | $3.70 | $3.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.59 TON | $1,000 | $1,000 | $1,000 | $1,000 | $650 | $900 |
| 659E31000 LIME | 1.35 ACRE | $300 | $500 | $250 | $250 | $60.00 | $600 |
| 659E35000 WATER | 35 MGAL | $1.00 | $100 | $10.00 | $10.00 | $10.00 | $40.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $5,000 | $4,600 | $15,000 | $1,600 | $2,250 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 51 FT | $10.00 | $17.50 | $18.00 | $35.00 | $17.50 | $19.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 13 FT | $10.00 | $35.00 | $58.00 | $35.00 | $27.25 | $15.00 |
| 407E10000 TACK COAT | 178 GAL | $12.00 | $5.00 | $4.00 | $2.75 | $2.75 | $6.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $500 | $180 | $475 | $195 | $365 | $475 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 96 FT | $12.00 | $16.50 | $10.25 | $10.25 | $10.25 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $50.00 | $88.00 | $45.00 | $45.00 | $45.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 44.2 SF | $22.00 | $28.50 | $19.00 | $19.00 | $19.00 | $21.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 69 FT | $5.00 | $4.60 | $4.00 | $4.00 | $12.40 | $5.00 |
| 644E01200 PARKING LOT STALL MARKING | 161 FT | $6.00 | $2.00 | $4.70 | $4.70 | $8.90 | $5.30 |
| 644E01600 HANDICAP SYMBOL MARKING | 1 EACH | $280 | $125 | $240 | $240 | $500 | $275 |
| 644E20800 YIELD LINE | 12 FT | $85.00 | $18.00 | $75.00 | $75.00 | $12.90 | $85.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $10,000 | $7,000 | $5,500 | $4,900 | $5,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $5,000 | $10,000 | $38,865 | $6,000 | $24,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,600 | $4,350 | $12,440 | $26,500 | $13,630 | $17,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 616 CY | $165 | $102k | 16% |
| 203E10000 EXCAVATION | 2,789 CY | $35 | $98k | 15% |
| 611E07900 18" CONDUIT, TYPE D | 189 FT | $350 | $66k | 10% |
| 602E20000 CONCRETE MASONRY | 56 CY | $800 | $45k | 7% |
| 611E13900 30" CONDUIT, TYPE D | 92 FT | $400 | $37k | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 149 CY | $210 | $31k | 5% |
| 607E98000 FENCE, MISC.:BIKEWAY RAILING | 1,060 FT | $27 | $29k | 4% |
| 625E25402 CONDUIT, 2", 725.05 | 8,538 FT | $3 | $26k | 4% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1 | $20k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |