PIK-CR 4-03.98 OH15-01
PIK County · est $1.3M
Bid dateThursday, March 8—
PIK County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 59 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2George J Igel & CO INC | R3Alan Stone CO INC | R4Rietschlin Construction INC | R5Foill INC | R6Complete General Construction Company | R7Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 927 FT | $89.00 | $95.00 | $90.00 | $118 | $88.56 | $141 | $135 | 11% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 791 FT | $89.00 | $152 | $90.00 | $138 | $86.88 | $135 | $146 | 9% |
| 517E70000 |
| Item | Quantity | R1Shelly & Sands INC | R2George J Igel & CO INC | R3Alan Stone CO INC | R4Rietschlin Construction INC | R5Foill INC | R6Complete General Construction Company | R7Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,500 | $2,750 | $10,000 | $12,500 | $4,158 | $5,000 | $3,800 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 278 SY | $15.00 | $46.00 | $16.00 | $19.75 | $19.61 | $9.00 | $12.02 |
| 202E35100 PIPE REMOVED, 24" AND UNDER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 429 FT |
| $122 |
| $122 |
| $160 |
| $144 |
| $132 |
| $145 |
| $130 |
| 7% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 134 CY | $375 | $525 | $544 | $405 | $730 | $450 | $558 | 6% |
| 507E00400 STEEL PILES, MISC.: HP12x63, FURNISHED, AS PER PLA | 1,557 FT | $30.00 | $40.00 | $34.50 | $45.00 | $50.64 | $41.00 | $35.74 | 6% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 364 FT | $123 | $123 | $160 | $145 | $133 | $150 | $130 | 6% |
| 507E00400 STEEL PILES, MISC.:HP12x63, FURNISHED, AS PER PLAN | 1,454 FT | $30.00 | $40.00 | $32.00 | $45.00 | $51.74 | $39.00 | $35.78 | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 109 CY | $375 | $525 | $570 | $405 | $781 | $500 | $551 | 5% |
| 524E95000 DRILLED SHAFTS, MISC.:36" DIAMETER DRILLED SHAFTS, | 596 FT | $68.00 | $67.00 | $82.00 | $83.50 | $79.26 | $115 | $131 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $65,000 | $60,000 | $20,702 | $40,000 | $44,228 | 5% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 579 FT | $69.00 | $78.00 | $82.00 | $83.50 | $91.95 | $125 | $157 | 5% |
| 524E95000 DRILLED SHAFTS, MISC.:36" DIAMETER DRILLED SHAFTS, | 553 FT | $68.00 | $69.00 | $82.00 | $83.50 | $84.34 | $130 | $126 | 5% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 531 FT | $69.00 | $76.00 | $82.00 | $83.50 | $98.35 | $135 | $152 | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (216 CY | $130 | $130 | $137 | $143 | $191 | $144 | $130 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 162 CY | $155 | $155 | $163 | $171 | $195 | $200 | $155 | 3% |
| 253E02000 PAVEMENT REPAIR | 75 CY | $305 | $305 | $520 | $336 | $209 | $300 | $314 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 14,430 LB | $1.50 | $1.50 | $1.50 | $1.25 | $1.14 | $1.00 | $1.35 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 12,182 LB | $1.50 | $1.45 | $1.50 | $1.25 | $1.15 | $1.00 | $1.37 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $175 | $175 | $184 | $193 | $232 | $200 | $191 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $175 | $175 | $184 | $193 | $232 | $150 | $175 | 2% |
| 40 FT |
| $25.00 |
| $13.00 |
| $32.00 |
| $20.00 |
| $28.62 |
| $19.00 |
| $10.21 |
| 202E35200 PIPE REMOVED, OVER 24" | 42 FT | $15.00 | $11.50 | $40.00 | $30.00 | $34.07 | $25.00 | $12.06 |
| 202E38000 GUARDRAIL REMOVED | 1,790 FT | $1.60 | $1.60 | $2.50 | $3.00 | $1.30 | $1.60 | $2.34 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $85.00 | $85.00 | $210 | $300 | $572 | $85.00 | $198 |
| 203E10000 EXCAVATION | 84 CY | $18.00 | $67.00 | $30.00 | $32.00 | $34.07 | $17.00 | $79.71 |
| 203E20000 EMBANKMENT | 250 CY | $18.00 | $38.00 | $45.00 | $22.00 | $26.46 | $18.00 | $18.60 |
| 203E35000 GRANULAR EMBANKMENT | 199 CY | $45.00 | $59.00 | $55.00 | $74.00 | $55.73 | $42.00 | $80.41 |
| 204E10000 SUBGRADE COMPACTION | 311 SY | $4.00 | $13.50 | $2.50 | $8.00 | $6.53 | $2.00 | $9.32 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 1,025 FT | $15.60 | $15.60 | $17.00 | $17.16 | $16.85 | $15.60 | $16.50 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,035 | $1,035 | $1,087 | $1,139 | $1,118 | $1,035 | $1,000 |
| 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST | 4 EACH | $1,480 | $1,480 | $1,554 | $1,628 | $1,598 | $1,480 | $1,500 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 9 CY | $120 | $65.00 | $178 | $133 | $164 | $70.00 | $148 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 12 CY | $100 | $60.00 | $134 | $98.25 | $131 | $60.00 | $91.47 |
| 659E10000 SEEDING AND MULCHING | 2,068 SY | $1.44 | $1.44 | $2.50 | $3.00 | $1.56 | $1.44 | $3.30 |
| 659E14000 REPAIR SEEDING AND MULCHING | 103 SY | $1.00 | $1.00 | $1.00 | $3.00 | $1.08 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.29 TON | $625 | $625 | $431 | $700 | $678 | $625 | $750 |
| 659E31000 LIME | 0.45 ACRE | $80.00 | $80.00 | $105 | $100 | $86.40 | $80.00 | $200 |
| 659E35000 WATER | 12 MGAL | $1.00 | $1.00 | $37.00 | $11.00 | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 518E21100 POROUS BACKFILL | 6 CY | $85.00 | $38.00 | $87.00 | $136 | $78.30 | $85.00 | $96.72 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 70 FT | $12.00 | $11.00 | $10.00 | $8.00 | $23.45 | $9.00 | $12.49 |
| 602E20000 CONCRETE MASONRY | 3.12 CY | $1,250 | $1,300 | $1,989 | $1,500 | $1,209 | $1,750 | $1,801 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $15.00 | $32.00 | $20.00 | $23.00 | $12.96 | $25.00 | $12.82 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $12.00 | $32.00 | $20.00 | $17.00 | $6.48 | $16.00 | $12.82 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $12.00 | $32.00 | $20.00 | $17.00 | $6.48 | $17.00 | $12.82 |
| 611E10200 24" CONDUIT, TYPE A | 42 FT | $110 | $120 | $155 | $95.00 | $97.74 | $110 | $87.11 |
| 611E20700 48" CONDUIT, TYPE A, CORRUGATED METAL PIPE 3"x1" | 42 FT | $165 | $175 | $200 | $156 | $158 | $225 | $140 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 32 CY | $140 | $140 | $147 | $154 | $248 | $280 | $140 |
| 304E20000 AGGREGATE BASE | 58 CY | $85.00 | $95.00 | $71.00 | $80.00 | $79.89 | $52.00 | $81.65 |
| 407E10000 TACK COAT | 720 GAL | $2.00 | $2.00 | $2.50 | $2.20 | $3.02 | $2.00 | $2.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 212 CY | $60.00 | $58.00 | $71.00 | $75.00 | $49.92 | $50.00 | $69.17 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 24 CY | $175 | $175 | $184 | $193 | $242 | $200 | $175 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (TWO-WAY) | 15 EACH | $10.00 | $6.40 | $18.00 | $7.00 | $6.91 | $6.40 | $10.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $35.00 | $25.00 | $121 | $50.00 | $21.60 | $10.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $35.00 | $25.00 | $77.00 | $50.00 | $21.60 | $10.00 | $20.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.34 MILE | $3,615 | $5,773 | $6,880 | $7,250 | $3,907 | $3,615 | $3,615 |
| 407E10000 TACK COAT | 40 GAL | $2.00 | $2.00 | $2.50 | $2.20 | $3.02 | $2.00 | $2.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 30 CY | $55.00 | $75.00 | $84.00 | $47.00 | $256 | $65.00 | $51.13 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 12 HOUR | $67.00 | $45.00 | $79.00 | $71.50 | $48.60 | $75.00 | $75.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $4,360 | $6,000 | $6,000 | $4,914 | $5,000 | $6,106 |
| 616E10000 WATER | 1 MGAL | $45.00 | $110 | $21.00 | $11.00 | $10.80 | $250 | $35.66 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,000 | $50.00 | $4,193 | $2,500 | $4,406 | $8,000 | $618 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $17,500 | $30,000 | $8,701 | $5,200 | $5,098 | $5,000 | $5,908 |
| 511E53010 CLASS QC1 CONCRETE, MISC.: PLAIN CONCRETE | 8 CY | $600 | $140 | $132 | $580 | $455 | $1,800 | $337 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 257 SY | $13.00 | $18.50 | $21.00 | $22.00 | $19.67 | $20.00 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 4 SY | $75.00 | $125 | $99.00 | $100 | $59.40 | $22.00 | $46.25 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 35 SF | $5.00 | $9.50 | $23.00 | $16.50 | $3.09 | $10.00 | $3.17 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,000 | $50.00 | $4,193 | $2,500 | $4,406 | $8,000 | $494 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $17,500 | $25,000 | $8,701 | $5,200 | $5,065 | $8,500 | $6,584 |
| 511E53010 CLASS QC1 CONCRETE, MISC.: PLAIN CONCRETE | 8 CY | $600 | $140 | $132 | $580 | $441 | $1,800 | $337 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 214 SY | $13.00 | $18.50 | $21.00 | $22.00 | $17.61 | $20.00 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 4 SY | $75.00 | $125 | $99.00 | $100 | $59.40 | $22.00 | $55.11 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 28 SF | $5.00 | $12.00 | $23.00 | $20.00 | $3.86 | $10.00 | $2.41 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,427 | $6,500 | $7,500 | $10,500 | $18,989 | $10,000 | $7,631 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,800 | $5,450 | $5,000 | $650 | $3,861 | $11,000 | $5,131 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,500 | $2,900 | $1,000 | $1,518 | $972 | $1,500 | $1,712 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $13,500 | $11,000 | $16,000 | $6,800 | $8,532 | $5,000 | $8,995 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 927 FT | $89 | $83k | 8% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 791 FT | $89 | $70k | 7% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 429 FT | $122 | $52k | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 134 CY | $375 | $50k | 5% |
| 507E00400 STEEL PILES, MISC.: HP12x63, FURNISHED, AS PER PLA | 1,557 FT | $30 | $47k | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 364 FT | $123 | $45k | 4% |
| 507E00400 STEEL PILES, MISC.:HP12x63, FURNISHED, AS PER PLAN | 1,454 FT | $30 | $44k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 109 CY | $375 | $41k | 4% |
| 524E95000 DRILLED SHAFTS, MISC.:36" DIAMETER DRILLED SHAFTS, | 596 FT | $68 | $41k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |