LIC-CR 823/MR 540-00.34/00.30 (PART 1 AND PART 2 AND PART 3)
LIC County · est $3.4M
Bid dateThursday, March 22—
LIC County · est $3.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 195 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Armstrong Steel Erectors INC | R3Complete General Construction Company | R4George J Igel & CO INC | R5Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 513E10241 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 305,300 LB | $1.36 | $1.06 | $1.25 | $1.40 | $1.33 | 18% |
| 511E21523 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 335 CY | $800 | $875 | $800 | $780 | $795 | 11% |
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 134,660 LB | $1.87 | $1.32 | $1.50 | $1.80 | $1.59 | 11% |
| Item | Quantity | R1Shelly & Sands INC | R2Armstrong Steel Erectors INC | R3Complete General Construction Company | R4George J Igel & CO INC | R5Double Z Construction Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $3,500 | $3,000 | $10,000 | $8,000 |
| 202E30000 WALK REMOVED | 1,298 SF | $1.00 | $2.25 | $2.50 | $1.00 | $2.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 27 FT | $15.00 | $20.00 | $185 | $15.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 231 CY |
| $800 |
| $850 |
| $800 |
| $720 |
| $790 |
| 8% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 141,006 LB | $0.98 | $0.97 | $1.00 | $1.10 | $1.10 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $125,000 | $142,500 | $130,000 | $130,000 | $380,000 | 5% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 755 FT | $150 | $175 | $150 | $165 | $190 | 5% |
| 624E10000 MOBILIZATION(PART 1 AND PART 2 AND PART 3) | 1 LS | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 | 4% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 551 FT | $162 | $175 | $200 | $165 | $185 | 4% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 155 CY | $560 | $475 | $570 | $550 | $600 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 84,427 LB | $1.00 | $0.91 | $1.00 | $1.00 | $0.96 | 4% |
| 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 81 CY | $985 | $950 | $850 | $975 | $900 | 3% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 124 CY | $584 | $475 | $530 | $455 | $500 | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $63,600 | $75,000 | $60,000 | $123,500 | $70,000 | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $63,000 | $140,000 | $120,000 | $75,000 | $25,000 | 3% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 201 SY | $297 | $385 | $290 | $330 | $415 | 3% |
| 614E11000 MAINTAINING TRAFFIC(PART 1 AND PART 2 AND PART 3) | 1 LS | $50,000 | $60,000 | $15,000 | $30,000 | $30,000 | 2% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 200 SY | $245 | $335 | $235 | $290 | $420 | 2% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,200 FT | $23.50 | $26.50 | $23.50 | $34.00 | $33.00 | 1% |
| 507E00502 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,040 FT | $27.00 | $15.00 | $35.00 | $18.00 | $10.00 | 1% |
| 436 FT |
| $1.55 |
| $1.50 |
| $1.50 |
| $1.50 |
| $1.50 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $260 | $500 | $375 | $300 | $500 |
| 203E10000 EXCAVATION | 616 CY | $16.00 | $9.50 | $20.00 | $15.00 | $16.00 |
| 203E20000 EMBANKMENT | 237 CY | $12.00 | $16.50 | $35.00 | $20.00 | $13.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 57 CY | $12.00 | $17.50 | $12.00 | $8.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 1,265 SY | $2.75 | $4.50 | $5.00 | $5.00 | $2.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $160 | $500 | $250 | $74.00 | $100 |
| 606E15050 GUARDRAIL, TYPE MGS | 162.5 FT | $21.00 | $20.40 | $20.40 | $20.40 | $20.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 3 EACH | $1,100 | $1,050 | $1,050 | $1,050 | $1,050 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,200 | $2,120 | $2,120 | $2,120 | $2,120 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $800 | $785 | $785 | $785 | $785 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,000 | $1,965 | $1,965 | $1,965 | $1,965 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $500 | $495 | $495 | $495 | $495 |
| 608E10000 4" CONCRETE WALK | 1,192 SF | $9.00 | $9.85 | $12.00 | $6.00 | $6.00 |
| 608E52000 CURB RAMP | 332 SF | $17.00 | $11.00 | $10.00 | $12.00 | $10.00 |
| 608E53020 DETECTABLE WARNING | 50 SF | $38.00 | $45.00 | $50.00 | $20.00 | $22.00 |
| 623E38500 MONUMENT ASSEMBLY | 5 EACH | $1,360 | $850 | $850 | $1,200 | $800 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 8 EACH | $475 | $150 | $550 | $500 | $200 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 4 SY | $75.00 | $100 | $135 | $95.00 | $140 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 104 SY | $53.00 | $65.00 | $75.00 | $60.00 | $65.00 |
| 607E30000 FENCE, SNOW | 150 FT | $8.50 | $7.00 | $7.00 | $5.00 | $3.50 |
| 659E00300 TOPSOIL | 102 CY | $35.00 | $20.00 | $30.00 | $18.00 | $40.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 916 SY | $1.70 | $2.00 | $3.07 | $5.00 | $3.07 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $700 | $350 | $605 | $605 | $605 |
| 659E31000 LIME | 0.19 ACRE | $155 | $100 | $70.00 | $70.00 | $70.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,240 | $5,000 | $2,000 | $2,000 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $11,600 | $18,000 | $10,900 | $15,000 | $18,000 |
| 602E20000 CONCRETE MASONRY | 0.41 CY | $1,325 | $2,000 | $3,500 | $4,000 | $2,000 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 47 FT | $14.00 | $10.00 | $15.00 | $17.00 | $6.00 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 335 FT | $10.00 | $8.00 | $12.50 | $10.00 | $6.00 |
| 605E31100 AGGREGATE DRAINS | 91 FT | $15.00 | $15.00 | $15.00 | $15.00 | $6.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 42 FT | $20.00 | $17.50 | $15.00 | $27.00 | $10.00 |
| 611E04400 12" CONDUIT, TYPE B | 43 FT | $123 | $90.00 | $115 | $98.00 | $60.00 |
| 611E10400 24" CONDUIT, TYPE B, 706.05 | 10 FT | $100 | $150 | $250 | $220 | $300 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $2,475 | $2,250 | $2,800 | $2,000 | $2,000 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $826 | $650 | $700 | $300 | $500 |
| 611E98644 CATCH BASIN GRATE | 1 EACH | $740 | $350 | $800 | $220 | $150 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,580 | $3,750 | $3,000 | $1,500 | $3,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $826 | $600 | $750 | $300 | $800 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $400 | $300 | $250 | $200 | $400 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 69 FT | $3.00 | $10.00 | $5.00 | $3.00 | $5.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 227 SY | $31.50 | $30.00 | $30.91 | $13.00 | $30.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 94 CY | $245 | $240 | $239 | $200 | $240 |
| 304E20000 AGGREGATE BASE | 211 CY | $64.00 | $70.00 | $85.00 | $65.00 | $80.00 |
| 407E20000 NON-TRACKING TACK COAT | 53 GAL | $3.50 | $3.45 | $3.09 | $3.50 | $3.45 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 55 CY | $295 | $290 | $247 | $215 | $290 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (51 CY | $250 | $245 | $241 | $280 | $245 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 64 FT | $40.00 | $37.00 | $50.00 | $40.00 | $40.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2BIDIRECTIONAL | 9 EACH | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 85 FT | $15.50 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 51 SF | $18.50 | $18.00 | $18.00 | $18.00 | $18.00 |
| 646E10200 CENTER LINE | 0.12 MILE | $22,400 | $22,350 | $28,737 | $22,350 | $22,350 |
| 647E20013 CROSSWALK LINE, TYPE B125, AS PER PLAN | 80 FT | $18.00 | $17.70 | $22.76 | $17.70 | $17.70 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $72.00 | $80.00 | $80.00 | $74.00 | $65.00 |
| 614E12350 WORK ZONE IMPACT ATTENUATOR | 8 EACH | $1,900 | $1,885 | $1,885 | $2,000 | $1,885 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,600 | $5,000 | $10,000 | $6,000 | $6,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 56 EACH | $5.00 | $8.00 | $10.00 | $8.00 | $8.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 56 EACH | $12.00 | $20.00 | $10.00 | $15.00 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 1 SNMT | $1,000 | $1,500 | $1,000 | $900 | $600 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.11 MILE | $1,100 | $1,088 | $15,000 | $1,088 | $1,088 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.53 MILE | $675 | $660 | $1,500 | $660 | $660 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 66 FT | $2.60 | $2.50 | $20.00 | $2.50 | $2.50 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 295 SY | $43.00 | $41.00 | $70.00 | $96.00 | $65.00 |
| 616E10000 WATER | 3 MGAL | $30.00 | $150 | $55.00 | $35.00 | $10.00 |
| 622E41000 PORTABLE BARRIER, 32" | 2,550 FT | $10.00 | $10.00 | $11.00 | $10.00 | $8.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, BI-DIRECTIO | 250 FT | $15.00 | $20.00 | $13.00 | $25.00 | $30.00 |
| 202E22900 APPROACH SLAB REMOVED | 146 SY | $32.00 | $40.72 | $50.00 | $30.00 | $36.00 |
| 202E23500 WEARING COURSE REMOVED | 146 SY | $12.50 | $7.50 | $10.00 | $7.00 | $13.50 |
| 503E21100 UNCLASSIFIED EXCAVATION | 48 CY | $229 | $75.00 | $675 | $540 | $220 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $14,000 | $22,500 | $20,000 | $20,000 | $18,000 |
| 507E00502 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 900 FT | $28.00 | $16.00 | $43.00 | $13.00 | $10.00 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,000 FT | $25.00 | $26.50 | $25.00 | $34.00 | $33.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 552 LB | $1.00 | $2.00 | $1.10 | $2.80 | $1.10 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $2,350 | $3,000 | $4,000 | $2,000 | $3,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 280 SY | $7.75 | $7.50 | $7.50 | $7.50 | $7.50 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 875 SY | $18.00 | $17.50 | $17.50 | $17.50 | $17.50 |
| 512E33000 TYPE 2 WATERPROOFING | 5 SY | $86.00 | $50.00 | $50.00 | $50.00 | $56.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,592 EACH | $3.00 | $2.90 | $3.25 | $3.00 | $3.10 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 68 SF | $12.00 | $7.50 | $10.00 | $9.00 | $13.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 124 FT | $33.00 | $27.50 | $40.00 | $25.00 | $24.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,100 | $1,100 | $985 | $1,500 | $1,095 |
| 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,100 | $1,250 | $985 | $1,600 | $1,185 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 59 CY | $98.00 | $95.00 | $100 | $85.00 | $80.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 130 FT | $6.00 | $8.50 | $7.00 | $9.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $6.00 | $12.50 | $15.00 | $11.00 | $17.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,000 | $4,000 | $5,000 | $3,100 | $3,100 |
| 601E32211 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 296 CY | $58.00 | $95.00 | $50.00 | $93.00 | $55.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,300 | $3,500 | $3,000 | $10,000 | $8,000 |
| 202E23000 PAVEMENT REMOVED | 599 SY | $11.00 | $7.75 | $10.00 | $13.00 | $10.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 62 SY | $17.00 | $6.00 | $10.00 | $6.00 | $5.00 |
| 202E32000 CURB REMOVED | 238 FT | $7.50 | $5.00 | $5.00 | $2.00 | $3.00 |
| 202E38000 GUARDRAIL REMOVED | 203 FT | $1.55 | $1.50 | $1.50 | $1.50 | $1.50 |
| 202E75000 FENCE REMOVED | 8 FT | $10.00 | $12.50 | $12.50 | $12.50 | $8.00 |
| 203E10000 EXCAVATION | 207 CY | $25.00 | $10.00 | $35.00 | $20.00 | $30.00 |
| 203E20000 EMBANKMENT | 47 CY | $16.00 | $20.00 | $45.00 | $35.00 | $20.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 92 CY | $16.00 | $22.50 | $13.00 | $8.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 901 SY | $2.00 | $4.50 | $6.50 | $4.00 | $2.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $160 | $500 | $250 | $74.00 | $100 |
| 606E15050 GUARDRAIL, TYPE MGS | 112.5 FT | $22.00 | $21.00 | $21.00 | $21.00 | $21.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 3 EACH | $1,100 | $1,050 | $1,050 | $1,050 | $1,050 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $790 | $785 | $785 | $785 | $785 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,000 | $1,965 | $1,965 | $1,965 | $1,965 |
| 607E30000 FENCE, SNOW | 50 FT | $10.50 | $7.00 | $7.00 | $6.00 | $3.50 |
| 608E52000 CURB RAMP | 207 SF | $22.00 | $11.00 | $15.00 | $15.00 | $12.00 |
| 608E53020 DETECTABLE WARNING | 78 SF | $22.00 | $45.00 | $50.00 | $20.00 | $20.00 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $1,300 | $850 | $750 | $1,200 | $800 |
| 623E40500 REFERENCE MONUMENT | 2 EACH | $900 | $375 | $750 | $650 | $200 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 8 SY | $120 | $100 | $150 | $95.00 | $120 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 88 SY | $56.00 | $65.00 | $75.00 | $62.00 | $77.00 |
| 659E00300 TOPSOIL | 73 CY | $38.00 | $20.00 | $30.00 | $20.00 | $40.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 661 SY | $2.35 | $2.00 | $1.00 | $6.00 | $4.15 |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $675 | $300 | $605 | $605 | $605 |
| 659E31000 LIME | 0.14 ACRE | $145 | $100 | $70.00 | $70.00 | $70.00 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $2,700 | $2,000 | $3,500 | $2,300 | $4,000 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 232 FT | $12.00 | $10.00 | $15.00 | $10.00 | $6.00 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 362 FT | $12.00 | $8.00 | $15.00 | $10.00 | $6.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 120 FT | $17.00 | $17.50 | $15.00 | $23.00 | $7.00 |
| 611E04400 12" CONDUIT, TYPE B | 47 FT | $125 | $90.00 | $120 | $110 | $60.00 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $2,650 | $2,250 | $3,000 | $2,000 | $2,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $825 | $750 | $500 | $400 | $500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $300 | $300 | $250 | $200 | $300 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 77 FT | $3.00 | $10.00 | $7.00 | $3.00 | $5.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $205 | $200 | $204 | $200 | $200 |
| 304E20000 AGGREGATE BASE | 231 CY | $66.00 | $70.00 | $75.00 | $62.00 | $80.00 |
| 407E20000 NON-TRACKING TACK COAT | 29 GAL | $3.45 | $3.45 | $3.09 | $3.50 | $3.45 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 17 CY | $69.00 | $90.00 | $90.00 | $65.00 | $100 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 34 CY | $270 | $265 | $263 | $260 | $265 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (28 CY | $255 | $252 | $274 | $260 | $252 |
| 609E26000 CURB, TYPE 6 | 168 FT | $29.00 | $33.00 | $25.00 | $20.00 | $40.00 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 55 FT | $26.00 | $37.00 | $25.00 | $35.00 | $40.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $800 | $500 | $225 | $300 | $200 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $68.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 646E10000 EDGE LINE, 4" | 0.17 MILE | $10,400 | $10,365 | $13,327 | $10,365 | $10,365 |
| 646E10200 CENTER LINE | 0.08 MILE | $19,700 | $19,652 | $25,268 | $19,652 | $19,652 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $72.00 | $80.00 | $80.00 | $74.00 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,000 | $5,000 | $10,000 | $8,000 | $10,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 1 SNMT | $1,000 | $1,500 | $1,000 | $900 | $600 |
| 202E22900 APPROACH SLAB REMOVED | 156 SY | $36.50 | $37.50 | $50.00 | $28.00 | $32.00 |
| 202E23500 WEARING COURSE REMOVED | 736 SY | $12.50 | $7.50 | $7.00 | $7.00 | $10.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 38 CY | $136 | $75.00 | $725 | $520 | $220 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $17,500 | $10,000 | $6,000 | $16,000 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,400 | $5,500 | $5,500 | $2,000 | $3,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 163 SY | $7.75 | $7.50 | $7.50 | $7.50 | $7.50 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 763 SY | $18.00 | $17.50 | $17.50 | $17.50 | $17.50 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,370 EACH | $3.00 | $2.75 | $3.25 | $3.00 | $3.10 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 54 SF | $8.00 | $7.50 | $10.00 | $10.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 105 FT | $36.00 | $27.50 | $40.00 | $30.00 | $23.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $1,100 | $900 | $981 | $1,200 | $870 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $1,100 | $950 | $981 | $1,100 | $890 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 47 CY | $129 | $95.00 | $125 | $97.00 | $80.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 112 FT | $7.00 | $8.50 | $10.00 | $8.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 33 FT | $7.00 | $12.50 | $17.00 | $10.00 | $16.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,000 | $4,000 | $5,000 | $3,100 | $3,100 |
| 601E32211 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 200 CY | $90.00 | $95.00 | $50.00 | $93.00 | $63.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,300 | $3,500 | $2,000 | $1,000 | $8,000 |
| 203E10000 EXCAVATION | 203 CY | $26.00 | $10.00 | $20.00 | $22.00 | $20.00 |
| 203E20000 EMBANKMENT | 695 CY | $8.00 | $13.50 | $20.00 | $20.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 2,068 SY | $2.25 | $4.50 | $3.50 | $3.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 35 CY | $20.00 | $20.00 | $50.00 | $16.00 | $25.00 |
| 204E30030 GRANULAR MATERIAL, TYPE D | 35 CY | $64.00 | $50.00 | $75.00 | $37.00 | $50.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $162 | $500 | $250 | $74.00 | $100 |
| 607E98000 FENCE, MISC.:WOOD FENCE | 600 FT | $35.00 | $33.20 | $33.20 | $33.20 | $33.20 |
| 608E13000 6" CONCRETE WALK | 280 SF | $11.00 | $16.00 | $20.00 | $9.00 | $7.00 |
| 608E53020 DETECTABLE WARNING | 20 SF | $41.00 | $45.00 | $50.00 | $20.00 | $20.00 |
| 623E38500 MONUMENT ASSEMBLY | 5 EACH | $1,360 | $850 | $750 | $1,200 | $800 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 10 EACH | $722 | $150 | $750 | $500 | $100 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 216 CY | $38.00 | $25.00 | $30.00 | $33.00 | $40.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 2,597 SY | $0.85 | $2.00 | $1.00 | $1.30 | $1.27 |
| 659E20000 COMMERCIAL FERTILIZER | 0.23 TON | $735 | $300 | $605 | $605 | $605 |
| 659E31000 LIME | 0.54 ACRE | $155 | $100 | $70.00 | $70.00 | $70.00 |
| 659E35000 WATER | 28 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E26000 DUMPED ROCK FILL, TYPE B | 2 CY | $265 | $250 | $225 | $100 | $100 |
| 602E20000 CONCRETE MASONRY | 2.2 CY | $725 | $1,500 | $2,000 | $500 | $700 |
| 611E07401 18" CONDUIT, TYPE B, AS PER PLAN | 20 FT | $57.00 | $140 | $200 | $130 | $100 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $840 | $600 | $500 | $450 | $500 |
| 304E20000 AGGREGATE BASE | 316 CY | $63.00 | $65.00 | $75.00 | $60.00 | $80.00 |
| 407E20000 NON-TRACKING TACK COAT | 129 GAL | $3.60 | $3.45 | $3.09 | $3.50 | $3.45 |
| 823E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | 60 CY | $265 | $260 | $263 | $260 | $260 |
| 823E20000 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (84 CY | $225 | $220 | $209 | $260 | $220 |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 97 FT | $15.50 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 12 EACH | $79.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 630E80100 SIGN, FLAT SHEET | 53.5 SF | $19.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 644E19000 SHARED LANE MARKING | 16 EACH | $300 | $290 | $373 | $290 | $290 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,550 | $32,500 | $30,000 | $16,000 | $20,500 |
| 619E16010 FIELD OFFICE, TYPE B(PART 1 AND PART 2 AND PART 3) | 3 MNTH | $2,582 | $2,000 | $2,000 | $1,600 | $2,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PART 1 AN | 1 LS | $16,700 | $10,000 | $5,000 | $16,500 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10241 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 305,300 LB | $1.36 | $415k | 13% |
| 511E21523 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 335 CY | $800 | $268k | 8% |
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 134,660 LB | $1.87 | $252k | 8% |
| 511E21523 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 231 CY | $800 | $185k | 6% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 141,006 LB | $0.98 | $138k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $125,000 | $125k | 4% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 755 FT | $150 | $113k | 3% |
| 624E10000 MOBILIZATION(PART 1 AND PART 2 AND PART 3) | 1 LS | $100,000 | $100k | 3% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 551 FT | $162 | $89k | 3% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 155 CY | $560 | $87k | 3% |