STA-SR 21-04.46
STA County · est $0.3M
Bid dateThursday, March 22—
STA County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 49 more items below.
| Item | Quantity | R1Stanley Miller Construction Company | R2Black Horse Bridge Construction INC | R3Rietschlin Construction INC | R4Lockhart Concrete CO | R5Wenger Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E96441 16' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN (DES | 43 FT | $1,414 | $1,685 | $1,990 | $3,464 | $1,611 | 26% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 47 CY | $435 | $375 | $450 | $300 | $698 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $16,894 | $10,000 | $25,000 | $11,000 | $33,718 | 7% |
| Item | Quantity | R1Stanley Miller Construction Company | R2Black Horse Bridge Construction INC | R3Rietschlin Construction INC | R4Lockhart Concrete CO | R5Wenger Excavating INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,611 | $4,000 | $8,000 | $4,500 | $4,654 |
| 202E23000 PAVEMENT REMOVED | 209 SY | $11.50 | $17.00 | $14.25 | $6.00 | $18.60 |
| 202E38000 GUARDRAIL REMOVED | 340 FT | $2.00 | $2.00 | $3.50 | $5.00 | $4.00 |
| 203E10000 EXCAVATION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 35 CY |
| $470 |
| $220 |
| $466 |
| $245 |
| $225 |
| 7% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 16 CY | $913 | $725 | $845 | $300 | $1,248 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 59 CY | $209 | $200 | $207 | $200 | $186 | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $11,867 | $22,000 | $18,700 | $19,000 | $22,922 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,611 | $3,000 | $3,000 | $7,500 | $3,973 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,244 LB | $1.50 | $1.75 | $1.75 | $1.00 | $4.00 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 67 CY | $110 | $70.00 | $96.00 | $120 | $138 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $7,289 | $10,000 | $13,800 | $5,000 | $16,067 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $2,167 | $2,075 | $2,255 | $21.00 | $2,432 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 400 FT | $15.88 | $17.40 | $18.15 | $18.00 | $19.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,111 | $3,000 | $2,000 | $14,000 | $16,773 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,644 | $6,000 | $5,600 | $5,000 | $14,948 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $834 | $1,500 | $1,500 | $200 | $1,098 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 13 CY | $366 | $95.00 | $185 | $40.00 | $88.40 | 2% |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $4,000 | $3,700 | $9,000 | $6,493 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $3,833 | $25,000 | $9,900 | $12,000 | $29,334 | 2% |
| 87 CY |
| $27.50 |
| $15.00 |
| $25.50 |
| $15.00 |
| $26.60 |
| 203E20000 EMBANKMENT | 25 CY | $77.35 | $50.00 | $69.00 | $15.00 | $24.80 |
| 204E10000 SUBGRADE COMPACTION | 163 SY | $1.00 | $10.00 | $7.00 | $1.00 | $4.00 |
| 209E60200 LINEAR GRADING | 5.6 STA | $524 | $140 | $242 | $600 | $224 |
| 209E70000 BORROW | 5 CY | $35.00 | $50.00 | $95.00 | $40.00 | $128 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 100 FT | $23.34 | $19.80 | $19.80 | $23.00 | $24.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $860 | $785 | $935 | $1,000 | $929 |
| 607E30001 FENCE, SNOW, AS PER PLAN | 100 FT | $5.00 | $2.00 | $6.00 | $5.00 | $14.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 14 CY | $105 | $80.00 | $115 | $115 | $138 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $100 | $55.00 | $300 | $179 |
| 659E00300 TOPSOIL | 129 CY | $28.00 | $30.00 | $29.00 | $20.00 | $7.20 |
| 659E10000 SEEDING AND MULCHING | 1,158 SY | $2.00 | $2.00 | $2.75 | $1.00 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 58 SY | $1.00 | $1.00 | $2.75 | $1.00 | $1.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.16 TON | $600 | $500 | $700 | $600 | $680 |
| 659E31000 LIME | 0.24 ACRE | $400 | $200 | $100 | $500 | $560 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $11.00 | $50.00 | $8.00 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $3.00 | $5.00 | $21.00 | $8.00 | $12.40 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $3.00 | $5.00 | $14.00 | $8.00 | $12.20 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $3.00 | $5.00 | $14.00 | $7.00 | $12.20 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETESUPP DESC NEEDED | 353 SY | $8.90 | $8.00 | $9.00 | $8.00 | $14.80 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 44 CY | $86.00 | $80.00 | $70.00 | $45.00 | $76.80 |
| 407E20000 NON-TRACKING TACK COAT | 55 GAL | $4.50 | $5.00 | $4.40 | $5.00 | $12.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 11 GAL | $16.70 | $25.00 | $16.50 | $4.00 | $12.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 2 CY | $86.00 | $100 | $180 | $45.00 | $88.60 |
| 621E00100 RPM | 2 EACH | $150 | $595 | $1,320 | $200 | $124 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $65.00 | $25.00 | $55.00 | $25.00 | $68.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 10 EACH | $6.70 | $6.50 | $8.25 | $5.00 | $124 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 7.5 FT | $14.00 | $18.00 | $14.00 | $10.00 | $26.80 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 10.5 FT | $14.50 | $22.00 | $15.00 | $10.00 | $32.40 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $40.00 | $52.00 | $38.50 | $15.00 | $76.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $16.75 | $10.00 | $16.50 | $15.00 | $94.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $56.00 | $55.00 | $55.00 | $90.00 | $202 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $17.00 | $10.00 | $16.50 | $15.00 | $78.00 |
| 642E00094 EDGE LINE, 6" | 0.06 MILE | $8,361 | $7,525 | $8,300 | $12,000 | $36,240 |
| 642E00290 CENTER LINE | 0.03 MILE | $11,145 | $10,030 | $11,100 | $16,000 | $39,800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $75.00 | $50.00 | $71.50 | $50.00 | $96.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $60.00 | $50.00 | $165 | $175 | $136 |
| 616E10000 WATER | 3 MGAL | $10.00 | $1.00 | $11.00 | $50.00 | $8.00 |
| 202E23500 WEARING COURSE REMOVED | 52 SY | $10.00 | $6.00 | $11.00 | $8.00 | $20.00 |
| 203E10000 EXCAVATION | 45 CY | $28.00 | $35.00 | $28.00 | $20.00 | $26.60 |
| 203E35120 GRANULAR MATERIAL, TYPE C | 45 CY | $67.00 | $70.00 | $80.00 | $45.00 | $96.80 |
| 204E50000 GEOTEXTILE FABRIC | 135 SY | $5.00 | $2.00 | $5.00 | $3.00 | $6.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $495 | $850 | $975 | $600 | $2,022 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 62 SY | $26.00 | $20.00 | $26.50 | $10.00 | $33.00 |
| 512E33000 TYPE 2 WATERPROOFING | 168 SY | $14.50 | $12.00 | $16.25 | $12.00 | $24.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 36 SF | $1.50 | $5.00 | $15.00 | $2.00 | $23.40 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96441 16' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN (DES | 43 FT | $1,414 | $61k | 22% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 47 CY | $435 | $20k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $16,894 | $17k | 6% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 35 CY | $470 | $16k | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 16 CY | $913 | $15k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 59 CY | $209 | $12k | 4% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $11,867 | $12k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,611 | $9k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,244 LB | $1.5 | $8k | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 67 CY | $110 | $7k | 3% |