Figure 0.1 · BRIEFING
BID #260213 · ODOTRESULT · awarded Apr 23

ROS-SR 180-02.11

ROS County · est $1.4M

Bid dateThursday, April 23
Awarded toFILLMORE CONSTRUCTION$1.19M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

58ITEMS
  • Earthwork22%
  • Aggregate & Base10%
  • Erosion & Landscaping10%
  • Structures / Bridge10%
  • Maintaining Traffic9%
  • Mobilization & General9%
  • Other29%

Top items by winning bid

ItemQtyUnit priceExtended%
203E20000 EMBANKMENT10,985 CY$34$373k31%
611E34001 120" CONDUIT, TYPE A, AS PER PLAN (SEE SHEET P.26 Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (BRIDGE - Totals Awd $278,840.00 2 $252,150.00 3 $383,920.00 4 $311,089.96 5 $473,180.00 6 $405,440.00154 FT$1,200$185k16%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)344 CY$194$67k6%
204E30010 GRANULAR MATERIAL, TYPE B649 CY$68$44k4%
411E10000 STABILIZED CRUSHED AGGREGATE190 CY$224$43k4%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG187 CY$216$40k3%
602E20000 CONCRETE MASONRY17.9 CY$2,000$36k3%
614E11000 MAINTAINING TRAFFIC1 LS$25,500$26k2%
878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER Section 1 - ROADWAY - Totals Awd $544,048.00 2 $490,700.00 3 $480,455.80 4 $519,457.52 5 $515,393.50 6 $616,407.501 LS$25,000$25k2%
503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN1 LS$25,000$25k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.

Rank 1Fillmore Construction$1.19MRank 2R C Construction Company And Son INC$1.24MRank 3Axis Civil Construction LLC$1.24MRank 4Djx Construction Company LLC$1.25MRank 5D G M INC$1.40MRank 6Complete General Construction Company$1.52M
ItemQuantityR1Fillmore ConstructionR2R C Construction Company And Son INCR3Axis Civil Construction LLCR4Djx Construction Company LLCR5D G M INCR6Complete General Construction Company
203E20000 EMBANKMENT10,985 CY$34.00$28.00$24.00$26.94$27.00$34.00
611E34001 120" CONDUIT, TYPE A, AS PER PLAN (SEE SHEET P.26 Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (BRIDGE - Totals Awd $278,840.00 2 $252,150.00 3 $383,920.00 4 $311,089.96 5 $473,180.00 6 $405,440.00154 FT$1,200$1,000$1,830$1,602$2,225$1,600
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)344 CY$194$215$210$215$220$210
204E30010 GRANULAR MATERIAL, TYPE B649 CY$68.00$90.00$96.00$103$100$136
411E10000 STABILIZED CRUSHED AGGREGATE190 CY$224$140$180$125$125$150
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG187 CY$216$275$250$250$250$275
602E20000 CONCRETE MASONRY17.9 CY$2,000$2,000$2,200$1,649$1,400$2,000
614E11000 MAINTAINING TRAFFIC1 LS$25,500$25,000$15,000$2,500$43,500$12,000
878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER Section 1 - ROADWAY - Totals Awd $544,048.00 2 $490,700.00 3 $480,455.80 4 $519,457.52 5 $515,393.50 6 $616,407.501 LS$25,000$20,000$54,000$49,350$20,000$3,000
503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN1 LS$25,000$15,000$15,000$7.41$24,000$35,000
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $83,500.00 2 $112,900.00 3 $79,900.00 4 $107,059.25 5 $127,750.00 6 $158,450.001 LS$25,000$25,000$30,000$63,427$40,000$75,500
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $64,614.95 2 $121,694.60 3 $63,577.10 4 $78,122.16 5 $60,383.30 6 $56,272.1924,000 EACH$1.00$1.00$1.00$1.00$1.00$1.00
304E20000 AGGREGATE BASE318 CY$64.00$140$99.00$95.32$110$105
204E10000 SUBGRADE COMPACTION4,040 SY$5.00$2.00$2.50$2.15$2.50$3.50
204E13000 EXCAVATION OF SUBGRADE669 CY$30.00$10.00$36.00$32.26$25.00$38.00
202E23000 PAVEMENT REMOVED1,808 SY$10.00$20.00$10.00$19.23$12.00$20.00
601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL102 CY$120$175$130$151$135$120
203E10000 EXCAVATION406 CY$30.00$10.00$23.00$21.14$30.00$36.00
253E02000 PAVEMENT REPAIR30 CY$400$25.00$430$500$250$750
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA1 LS$10,000$20,000$10,000$16,030$8,000$7,695
Show all 58 line items
ItemQuantityR1Fillmore ConstructionR2R C Construction Company And Son INCR3Axis Civil Construction LLCR4Djx Construction Company LLCR5D G M INCR6Complete General Construction Company
201E11000 CLEARING AND GRUBBING1 LS$5,000$15,000$15,000$7,074$50,000$35,000
202E38000 GUARDRAIL REMOVED300 FT$10.00$5.00$8.50$7.21$1.00$4.60
202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E4 EACH$500$500$500$541$400$458
204E30020 GRANULAR MATERIAL, TYPE C104 CY$66.00$90.00$86.00$102$120$88.00
204E45000 PROOF ROLLING1 HOUR$150$100$2,000$535$100$350
204E50000 GEOTEXTILE FABRIC1,371 SY$2.00$10.00$1.80$2.74$2.50$2.50
252E01500 FULL DEPTH PAVEMENT SAWING47 FT$20.00$50.00$4.00$22.00$20.00$2.00
623E40500 REFERENCE MONUMENT, TYPE A6 EACH$1,500$850$850$983$600$1,500
690E50350 SPECIAL - MAILBOX REMOVED AND RESET3 EACH$400$200$220$227$250$360
659E00300 TOPSOIL125 CY$60.00$35.00$120$68.24$25.00$80.00
659E10000 SEEDING AND MULCHING5,231 SY$1.45$5.00$0.80$2.40$2.00$0.80
659E14000 REPAIR SEEDING AND MULCHING262 SY$2.00$0.20$0.80$1.00$0.05$0.80
659E20000 COMMERCIAL FERTILIZER0.71 TON$1,400$2,000$1,250$1,500$1,500$1,250
659E31000 LIME1.08 ACRE$450$1,800$150$200$300$150
659E35000 WATER28.2 MGAL$10.00$1.00$1.00$1.00$1.00$1.00
670E00500 SLOPE EROSION PROTECTION1,122 SY$2.00$10.00$2.50$2.35$3.00$2.50
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$3,500$12,500$1,500$7,500$2,000$1,500
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$7,500$20,000$4,800$5,300$8,000$4,800
605E31100 AGGREGATE DRAINS Section 3 - DRAINAGE - Totals Awd $5,445.00 2 $9,075.00 3 $7,260.00 4 $3,597.33 5 $12,705.00 6 $12,705.00363 FT$15.00$25.00$20.00$9.91$35.00$35.00
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5"322 SY$10.00$30.00$8.50$14.96$9.00$7.50
407E10000 TACK COAT271 GAL$3.00$5.00$4.25$4.25$4.25$3.50
441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2449 (5 CY$270$600$365$365$375$600
441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) Section 4 - PAVEMENT - Totals Awd $176,263.00 2 $212,320.00 3 $191,885.75 4 $184,077.03 5 $188,659.75 6 $193,868.50$280$600$500$500$525$650
621E00100 RPM10 EACH$383$450$295$290$300$290
621E54000 RAISED PAVEMENT MARKER REMOVED10 EACH$20.00$100$35.00$2.71$1.00$45.00
642E00104 EDGE LINE, 6", TYPE 10.3 MILE$6,358$4,500$2,850$2,200$3,500$2,100
642E00300 CENTER LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $7,839.95 2 $7,525.00 3 $4,953.75 4 $3,917.10 5 $4,960.00 6 $4,550.000.15 MILE$12,717$4,500$5,325$2,200$6,000$3,800
614E12420 DETOUR SIGNING1 LS$6,985$35,000$7,000$6,716$6,000$16,000
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC30 CY$300$25.00$405$500$150$450
616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $28,325.00 2 $36,534.00 3 $32,084.00 4 $37,808.19 5 $18,034.00 6 $70,700.0034 MGAL$10.00$1.00$1.00$32.12$1.00$550
202E11000 STRUCTURE REMOVED1 LS$10,000$15,000$20,000$17,614$45,000$60,000
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$10,000$12,500$13,500$1,229$21,500$15,000
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)20 SY$50.00$100$48.00$31.60$60.00$50.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$10,000$34,000$12,500$16,432$25,000$11,500
619E16000 FIELD OFFICE, TYPE A3 MNTH$1,000$500$2,000$4,000$750$5,150
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$10,000$25,000$14,000$10,200$15,000$34,000
623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R1 LS$5,000$1,200$1,200$1,250$1,000$5,000
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND1 LS$5,000$1,200$1,200$1,250$1,000$5,000

Project details

Description
ROS-SR 180-02.11
Type of work
Drainage

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →