JAC-SR 327-06.08
JAC County · est $1.2M
Bid dateThursday, April 5—
JAC County · est $1.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Nuko Paving INC | R2Shelly & Sands INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4,400.81 CY | $108 | $105 | $138 | 46% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 938.67 CY | $110 | $95.00 | $140 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $70,000 | $121,000 | 6% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,300 SY | $35.00 | $65.00 | $68.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 57,215.48 SY | $0.65 | $1.25 | $1.60 | 4% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 1,267.2 FT |
| Item | Quantity | R1Nuko Paving INC | R2Shelly & Sands INC | R3Shelly Company |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 84 SF | $8.00 | $6.00 | $12.00 |
| 202E32000 CURB REMOVED | 14 FT | $20.00 | $20.00 | $12.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 5.81 MILE | $800 | $1,800 | $1,200 |
| 608E52001 CURB RAMP, AS PER PLAN | 84 SF | $25.00 | $42.00 | $32.00 |
| 608E53020 DETECTABLE WARNING | 120 SF | $35.00 | $32.00 | $80.00 |
| 609E24510 CURB, TYPE 4-C | 14 FT | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $29.00 |
| $24.00 |
| $23.00 |
| 4% |
| 617E10100 COMPACTED AGGREGATE | 548.04 CY | $66.00 | $63.00 | $80.00 | 4% |
| 304E20000 AGGREGATE BASE | 625.28 CY | $56.00 | $60.00 | $75.00 | 3% |
| 644E00300 CENTER LINE | 5.74 MILE | $3,605 | $3,500 | $3,500 | 2% |
| 202E23000 PAVEMENT REMOVED | 5,632 SY | $3.50 | $6.00 | $12.50 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 57 CF | $334 | $255 | $240 | 2% |
| 644E00100 EDGE LINE, 4" | 9.36 MILE | $1,957 | $2,100 | $1,900 | 2% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 174 FT | $99.91 | $90.00 | $88.50 | 2% |
| 407E10000 TACK COAT | 8,158.2 GAL | $2.00 | $2.00 | $2.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $3,500 | $7,500 | 2% |
| 202E32500 CURB AND GUTTER REMOVED | 1,267.2 FT | $9.00 | $9.00 | $12.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 11.4 MILE | $891 | $910 | $865 | 1% |
| 202E23500 WEARING COURSE REMOVED | 196.67 SY | $43.00 | $15.00 | $48.00 | 1% |
| 621E00100 RPM | 169 EACH | $38.00 | $32.00 | $34.00 | 1% |
| $56.00 |
| $35.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 617E25000 WATER | 4.77 MGAL | $40.00 | $450 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 99 EACH | $10.00 | $25.00 | $20.00 |
| 644E00400 CHANNELIZING LINE, 8" | 350 FT | $1.49 | $1.50 | $1.45 |
| 644E00500 STOP LINE | 232 FT | $5.67 | $5.25 | $5.50 |
| 644E00600 CROSSWALK LINE | 952 FT | $2.83 | $2.60 | $2.75 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 324 FT | $5.41 | $5.00 | $5.25 |
| 644E00900 ISLAND MARKING | 140 SF | $2.58 | $2.60 | $2.50 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $500 | $535 | $485 |
| 644E01200 PARKING LOT STALL MARKING | 112 FT | $1.49 | $2.00 | $1.45 |
| 644E01201 PARKING LOT STALL MARKING, AS PER PLAN | 378 FT | $1.80 | $2.00 | $1.75 |
| 644E01300 LANE ARROW | 22 EACH | $80.34 | $78.00 | $78.00 |
| 644E01400 WORD ON PAVEMENT, 72" | 1 EACH | $102 | $95.00 | $99.00 |
| 614E12460 WORK ZONE MARKING SIGN | 26 EACH | $97.85 | $100 | $95.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 264 FT | $8.39 | $8.00 | $8.15 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 174 FT | $10.50 | $16.95 | $16.50 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $830 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4,400.81 CY | $108 | $475k | 44% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 938.67 CY | $110 | $103k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $60k | 6% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,300 SY | $35 | $46k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 57,215.48 SY | $0.65 | $37k | 3% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 1,267.2 FT | $29 | $37k | 3% |
| 617E10100 COMPACTED AGGREGATE | 548.04 CY | $66 | $36k | 3% |
| 304E20000 AGGREGATE BASE | 625.28 CY | $56 | $35k | 3% |
| 644E00300 CENTER LINE | 5.74 MILE | $3,605 | $21k | 2% |