ROS-US 23-19.46 & SR 159-10.10 (PART 1, PART 2 AND PART 3)
ROS County · est $0.9M
Bid dateThursday, April 5—
ROS County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 134 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Nuko Paving INC | % of bid |
|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 818 CY | $125 | $156 | $160 | 17% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 396 CY | $115 | $130 | $140 | 7% |
| 614E11000 MAINTAINING TRAFFIC(PART 1, PART 2, AND PART 3) | 1 LS | $37,500 | $60,000 | $55,000 | 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 19,604 SY | $1.90 | $1.90 | $1.00 | 6% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,178 SF | $30.25 | $26.00 | $20.00 |
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Nuko Paving INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,541 | $5,000 | $4,000 |
| 202E32000 CURB REMOVED | 47 FT | $12.00 | $15.00 | $20.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 189 FT | $6.00 | $22.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 462 FT | $1.50 | $1.50 | $6.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $425 | $450 | $1,000 |
| 203E10000 EXCAVATION | 1,311 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 196 CY | $167 | $192 | $180 | 5% |
| 203E20000 EMBANKMENT | 2,603 CY | $12.50 | $15.00 | $22.00 | 5% |
| 611E04400 12" CONDUIT, TYPE B | 497 FT | $60.00 | $74.00 | $45.00 | 5% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 696 CY | $41.00 | $47.50 | $54.00 | 5% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 200 SY | $130 | $145 | $200 | 4% |
| 304E20000 AGGREGATE BASE | 404 CY | $60.00 | $55.00 | $52.00 | 4% |
| 619E16000 FIELD OFFICE, TYPE A(PART 1, PART 2, AND PART 3) | 8 MNTH | $3,000 | $1,500 | $1,500 | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 1,237 FT | $18.00 | $17.00 | $10.00 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 156 CY | $138 | $142 | $160 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PART 1, P | 1 LS | $21,000 | $9,750 | $10,000 | 3% |
| 624E10000 MOBILIZATION(PART 1, PART 2, AND PART 3) | 1 LS | $20,000 | $40,000 | $30,000 | 3% |
| 832E30000 EROSION CONTROL | 19,747 EACH | $1.00 | $1.00 | $1.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 1,575 SY | $12.00 | $11.00 | $15.00 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $185 | $180 | $180 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 117 CY | $156 | $220 | $180 | 3% |
| $13.00 |
| $15.00 |
| $15.00 |
| 204E10000 SUBGRADE COMPACTION | 2,424 SY | $3.25 | $2.25 | $1.75 |
| 204E13000 EXCAVATION OF SUBGRADE | 685 CY | $15.00 | $15.00 | $13.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $180 | $175 | $75.00 |
| 204E50000 GEOTEXTILE FABRIC | 2,489 SY | $0.75 | $0.70 | $1.30 |
| 606E15050 GUARDRAIL, TYPE MGS | 450 FT | $18.80 | $18.80 | $21.00 |
| 659E00300 TOPSOIL | 53 CY | $17.00 | $52.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 3,943 SY | $0.83 | $0.83 | $1.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 394 SY | $0.69 | $0.68 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.35 TON | $717 | $718 | $600 |
| 659E31000 LIME | 0.81 ACRE | $155 | $155 | $200 |
| 659E35000 WATER | 11 MGAL | $1.00 | $1.00 | $10.00 |
| 670E00700 DITCH EROSION PROTECTION | 491 SY | $1.88 | $1.87 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,045 | $5,000 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,858 | $7,500 | $3,000 |
| 602E20000 CONCRETE MASONRY | 0.43 CY | $2,100 | $1,900 | $1,800 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,913 FT | $8.75 | $9.00 | $8.00 |
| 611E10600 24" CONDUIT, TYPE C | 30 FT | $95.00 | $71.00 | $150 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $5,100 | $3,850 | $2,500 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,100 | $2,500 | $2,500 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $650 | $600 | $400 |
| 407E10000 TACK COAT | 282 GAL | $2.12 | $1.85 | $2.00 |
| 609E72001 CONCRETE MEDIAN, AS PER PLAN | 93 SY | $140 | $110 | $100 |
| 621E00100 RPM | 14 EACH | $54.15 | $76.00 | $65.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $48.00 | $5.50 | $30.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BIDIRECTIONAL) | 5 EACH | $7.50 | $7.40 | $9.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 195 FT | $12.00 | $12.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $35.00 | $35.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 73 SF | $20.00 | $20.00 | $26.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $10.00 | $10.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $10.00 | $10.00 | $65.00 |
| 644E00100 EDGE LINE, 4" | 0.26 MILE | $3,155 | $3,155 | $9,000 |
| 644E00300 CENTER LINE | 0.04 MILE | $5,965 | $5,965 | $20,000 |
| 644E00400 CHANNELIZING LINE, 8" | 1,156 FT | $1.60 | $1.60 | $1.75 |
| 644E00500 STOP LINE | 32 FT | $5.95 | $5.95 | $8.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 213 FT | $5.95 | $5.95 | $7.00 |
| 644E00720 CHEVRON MARKING | 61 FT | $6.00 | $6.00 | $8.00 |
| 644E00900 ISLAND MARKING | 101 SF | $2.65 | $2.65 | $4.00 |
| 644E01300 LANE ARROW | 8 EACH | $88.00 | $88.00 | $125 |
| 644E01500 DOTTED LINE, 4" | 114 FT | $1.55 | $1.55 | $2.50 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 380 FT | $1.75 | $1.75 | $5.00 |
| 407E10000 TACK COAT | 55 GAL | $2.12 | $1.85 | $2.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 100 CY | $50.00 | $60.00 | $60.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 25 CY | $412 | $190 | $300 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $62.00 | $70.00 | $70.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $2,320 | $2,320 | $2,250 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,250 | $6,500 | $5,750 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 26 EACH | $11.00 | $6.50 | $50.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 26 EACH | $16.50 | $15.00 | $50.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $901 | $1,800 | $1,000 |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 4 SNMT | $700 | $950 | $1,000 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.62 MILE | $3,250 | $895 | $3,750 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT | 1,590 FT | $1.00 | $0.90 | $1.10 |
| 616E10000 WATER | 53 MGAL | $11.00 | $1.00 | $11.00 |
| 617E10100 COMPACTED AGGREGATE | 30 CY | $175 | $86.00 | $100 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $3,500 | $3,000 |
| 202E23000 PAVEMENT REMOVED | 217 SY | $25.00 | $20.00 | $15.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 118 FT | $25.00 | $28.00 | $18.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $300 | $450 | $1,000 |
| 203E10000 EXCAVATION | 128 CY | $25.00 | $29.00 | $25.00 |
| 203E20000 EMBANKMENT | 141 CY | $15.00 | $29.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 1,000 SY | $4.00 | $2.50 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 325 CY | $23.00 | $21.00 | $17.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 334 CY | $42.00 | $49.50 | $64.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $182 | $175 | $125 |
| 204E50000 GEOTEXTILE FABRIC | 1,000 SY | $0.75 | $0.85 | $1.25 |
| 659E10000 SEEDING AND MULCHING | 756 SY | $2.30 | $2.30 | $1.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 38 SY | $0.69 | $0.68 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $620 | $620 | $600 |
| 659E31000 LIME | 0.16 ACRE | $150 | $150 | $150 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $11.00 |
| 832E30000 EROSION CONTROL | 8,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 945 FT | $9.00 | $9.00 | $7.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 25 FT | $19.00 | $25.00 | $14.00 |
| 611E04600 12" CONDUIT, TYPE C | 84 FT | $60.00 | $64.00 | $65.00 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $4,200 | $2,550 | $2,800 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,900 | $1,900 | $1,500 |
| 304E20000 AGGREGATE BASE | 161 CY | $65.00 | $63.00 | $60.00 |
| 407E10000 TACK COAT | 200 GAL | $2.12 | $1.85 | $2.00 |
| 621E00100 RPM | 11 EACH | $54.20 | $76.00 | $65.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 45 FT | $13.00 | $13.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 15 SF | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $10.00 | $10.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $10.00 | $10.00 | $75.00 |
| 644E00104 EDGE LINE, 6" | 0.1 MILE | $4,765 | $4,765 | $18,000 |
| 644E00404 CHANNELIZING LINE, 12" | 413 FT | $2.05 | $2.05 | $3.00 |
| 644E01300 LANE ARROW | 5 EACH | $89.00 | $89.00 | $160 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 100 CY | $65.00 | $60.00 | $60.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 12 HOUR | $66.00 | $70.00 | $70.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $2,320 | $2,320 | $2,100 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,750 | $5,000 | $4,100 |
| 614E12470 WORK ZONE SPEED LIMIT SIGN | 4 EACH | $700 | $100 | $110 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $139 | $180 | $200 |
| 614E13314 BARRIER REFLECTOR, TYPE 3NEEDS SUPPLEMENTAL DESC | 15 EACH | $16.00 | $6.50 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 15 EACH | $21.25 | $15.00 | $50.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $1,800 | $1,000 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.34 MILE | $3,250 | $895 | $4,000 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT | 700 FT | $1.00 | $0.90 | $1.10 |
| 616E10000 WATER | 71 MGAL | $4.80 | $1.00 | $11.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $120 | $88.00 | $80.00 |
| 622E41000 PORTABLE BARRIER, 32" | 690 FT | $18.00 | $23.00 | $10.00 |
| 202E30000 WALK REMOVED | 1,227 SF | $6.00 | $10.00 | $9.00 |
| 202E32000 CURB REMOVED | 82 FT | $3.50 | $12.50 | $11.00 |
| 608E10000 4" CONCRETE WALK | 85 SF | $13.50 | $12.00 | $15.00 |
| 609E24510 CURB, TYPE 4-C | 11 FT | $65.25 | $75.00 | $200 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $1,100 | $650 | $400 |
| 611E99150 INLET ADJUSTED TO GRADE | 1 EACH | $1,100 | $650 | $300 |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 1,774 SY | $3.00 | $1.50 | $2.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,648 GAL | $2.65 | $3.45 | $3.50 |
| 621E00100 RPM | 29 EACH | $54.20 | $76.00 | $65.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 23 EACH | $8.50 | $3.50 | $10.00 |
| 644E00104 EDGE LINE, 6" | 0.35 MILE | $3,672 | $3,672 | $3,000 |
| 644E00300 CENTER LINE | 0.96 MILE | $5,166 | $5,166 | $5,800 |
| 644E00500 STOP LINE | 92 FT | $5.85 | $5.85 | $8.00 |
| 644E00600 CROSSWALK LINE | 373 FT | $2.95 | $2.95 | $3.50 |
| 644E01200 PARKING LOT STALL MARKING | 739 FT | $1.80 | $1.80 | $2.75 |
| 644E01510 DOTTED LINE, 6" | 689 FT | $1.45 | $1.45 | $2.25 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 184 FT | $2.80 | $2.80 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 45 FT | $13.00 | $13.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 19 SF | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $10.00 | $10.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $10.00 | $10.00 | $20.00 |
| 614E12460 WORK ZONE MARKING SIGN | 21 EACH | $100 | $100 | $110 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.58 MILE | $2,020 | $997 | $2,200 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.24 MILE | $6,885 | $715 | $7,200 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 92 FT | $7.75 | $2.35 | $9.00 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 378 FT | $3.85 | $1.90 | $4.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,475 | $5,500 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 818 CY | $125.25 | $102k | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 396 CY | $114.6 | $45k | 5% |
| 614E11000 MAINTAINING TRAFFIC(PART 1, PART 2, AND PART 3) | 1 LS | $37,500 | $38k | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 19,604 SY | $1.9 | $37k | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,178 SF | $30.25 | $36k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 196 CY | $167.49 | $33k | 3% |
| 203E20000 EMBANKMENT | 2,603 CY | $12.5 | $33k | 3% |
| 611E04400 12" CONDUIT, TYPE B | 497 FT | $60 | $30k | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 696 CY | $41 | $29k | 3% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 200 SY | $130 | $26k | 3% |