STA-Culverts FY2018
STA County · est $0.4M
Bid dateThursday, April 5—
STA County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1Americon Industrial Services LLC | R2Eclipse CO LLC | R3Rudzik Excavating INC | R4Lockhart Concrete CO | R5J S Bova Excavating LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 296 CY | $180 | $220 | $236 | $215 | $300 | 18% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T=3") | 3,499 SY | $10.00 | $10.30 | $10.00 | $9.00 | $7.25 | 12% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $11,837 | $25,600 | $9,000 | $58,500 | 10% |
| 611E13200 30" CONDUIT, TYPE A, 706.02 OR 707.01 (12 GAUGE OR |
| Item | Quantity | R1Americon Industrial Services LLC | R2Eclipse CO LLC | R3Rudzik Excavating INC | R4Lockhart Concrete CO | R5J S Bova Excavating LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $14,731 | $5,675 | $9,000 | $7,000 |
| 202E20010 HEADWALL REMOVED | 9 EACH | $500 | $363 | $490 | $100 | $350 |
| 202E23000 PAVEMENT REMOVED | 369 SY | $10.00 | $1.50 | $10.00 | $5.00 | $15.00 |
| 202E30000 WALK REMOVED | 17 SF | $5.00 | $3.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 164 FT |
| $165 |
| $158 |
| $229 |
| $400 |
| $320 |
| 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,000 | $6,500 | $16,500 | $29,000 | $11,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 104 CY | $150 | $185 | $360 | $325 | $400 | 5% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, 706.01 OR 707.12 | 170 FT | $85.00 | $104 | $182 | $50.00 | $220 | 5% |
| 611E52900 34" X 53" CONDUIT, TYPE A, 706.04 | 45 FT | $260 | $273 | $446 | $500 | $525 | 4% |
| 614E12420 DETOUR SIGNING (STA-43-21.03) | 1 LS | $10,300 | $12,500 | $6,308 | $10,500 | $13,000 | 3% |
| 602E20000 CONCRETE MASONRY | 8.4 CY | $1,220 | $995 | $2,337 | $1,000 | $2,600 | 3% |
| 659E10000 SEEDING AND MULCHING | 1,664 SY | $6.00 | $6.00 | $1.75 | $1.00 | $5.40 | 3% |
| 614E12420 DETOUR SIGNING (STA-173-3.52/3.55) | 1 LS | $9,500 | $11,500 | $5,918 | $9,500 | $12,000 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $800 | $750 | $400 | $750 | 3% |
| 601E38400 PAVED GUTTER, TYPE 2 | 37 FT | $225 | $44.50 | $50.00 | $40.00 | $75.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $20,000 | $4,914 | $19,000 | $7,500 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH | $1,925 | $2,267 | $2,200 | $2,200 | $2,500 | 3% |
| 614E12420 DETOUR SIGNING (STA-183-11.22) | 1 LS | $7,500 | $10,800 | $4,763 | $7,500 | $10,000 | 2% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 4 EACH | $1,725 | $1,803 | $1,750 | $18.00 | $2,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,650 | $7,000 | $7,000 | $5,000 | $7,000 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 410 FT | $15.00 | $20.00 | $19.50 | $20.00 | $22.00 | 2% |
| $10.00 |
| $0.20 |
| $10.00 |
| 202E32500 CURB AND GUTTER REMOVED | 37 FT | $5.00 | $4.50 | $10.00 | $5.00 | $4.75 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 170 FT | $12.50 | $17.00 | $8.00 | $12.00 | $30.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 194 FT | $25.00 | $60.00 | $25.30 | $25.00 | $50.00 |
| 202E38000 GUARDRAIL REMOVED | 753 FT | $2.00 | $3.00 | $1.50 | $5.00 | $3.50 |
| 203E10000 EXCAVATION | 23 CY | $15.00 | $56.50 | $80.00 | $25.00 | $110 |
| 203E20000 EMBANKMENT | 139 CY | $15.00 | $10.50 | $55.75 | $20.00 | $14.00 |
| 204E10000 SUBGRADE COMPACTION | 369 SY | $1.00 | $3.00 | $1.50 | $1.00 | $5.00 |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 7 STA | $100 | $377 | $175 | $500 | $500 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 162.5 FT | $18.00 | $23.00 | $22.50 | $23.00 | $25.50 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 75 FT | $22.00 | $41.00 | $40.00 | $40.00 | $45.00 |
| 608E13000 6" CONCRETE WALK | 17 SF | $70.00 | $28.00 | $45.00 | $10.00 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 13 CY | $100 | $164 | $149 | $130 | $265 |
| 616E10000 WATER | 3 MGAL | $10.00 | $40.00 | $1.00 | $50.00 | $185 |
| 659E00300 TOPSOIL | 186 CY | $25.00 | $44.50 | $20.00 | $20.00 | $80.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 86 SY | $1.00 | $1.00 | $1.50 | $1.00 | $5.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $625 | $644 | $200 | $600 | $1,695 |
| 659E31000 LIME | 0.35 ACRE | $120 | $124 | $100 | $400 | $1,400 |
| 659E35000 WATER | 11 MGAL | $1.00 | $1.00 | $1.00 | $50.00 | $10.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING ( STA-173-3.52/3 | 1 LS | $3,000 | $2,576 | $1,750 | $19,000 | $6,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING(STA-183-11.22) | 1 LS | $3,000 | $2,576 | $1,500 | $19,000 | $6,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING(STA-43-21.03) | 1 LS | $3,000 | $2,576 | $2,000 | $19,000 | $6,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 996 LB | $1.00 | $1.00 | $1.20 | $1.00 | $5.75 |
| 611E00900 6" CONDUIT, TYPE B | 30 FT | $5.00 | $33.00 | $10.94 | $12.00 | $15.00 |
| 611E01400 6" CONDUIT, TYPE E | 30 FT | $5.00 | $22.00 | $6.85 | $12.00 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $5.00 | $22.00 | $6.85 | $12.00 | $15.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,000 | $532 | $600 | $500 | $1,350 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 442 FT | $3.50 | $2.00 | $3.00 | $2.00 | $5.00 |
| 304E20000 AGGREGATE BASE | 63 CY | $65.00 | $68.50 | $67.52 | $60.00 | $125 |
| 407E20000 NON-TRACKING TACK COAT | 447 GAL | $2.50 | $5.00 | $13.50 | $12.00 | $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 76 GAL | $4.00 | $10.00 | $10.00 | $9.00 | $40.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 12 CY | $55.00 | $78.50 | $190 | $175 | $155 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $200 | $247 | $200 | $50.00 | $850 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 60 FT | $5.50 | $13.00 | $13.75 | $6.00 | $6.00 |
| 630E80100 SIGN, FLAT SHEET, 730.2 | 8 SF | $16.50 | $29.00 | $30.80 | $17.00 | $18.00 |
| 642E00094 EDGE LINE, 6" | 0.16 MILE | $10,000 | $10,300 | $5,500 | $10,000 | $10,000 |
| 642E00290 CENTER LINE | 0.23 MILE | $8,000 | $10,300 | $5,500 | $8,000 | $8,000 |
| 642E00390 CHANNELIZING LINE, 8" | 122 FT | $3.00 | $5.15 | $1.10 | $3.00 | $3.00 |
| 642E01290 LANE ARROW | 1 EACH | $100 | $258 | $55.00 | $100 | $100 |
| 614E12420 DETOUR SIGNING (EASTHILL) | 1 LS | $4,500 | $5,769 | $2,948 | $1,500 | $6,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $200 | $190 | $50.00 | $325 | $250 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $950 | $1,133 | $900 | $750 | $950 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $7,176 | $1,200 | $2,500 | $7,000 |
| 202E98200 REMOVAL MISC.:CHANNEL CLEANOUT | 60 FT | $10.00 | $26.50 | $45.00 | $500 | $100 |
| 203E40000 BORROW | 3 CY | $150 | $40.00 | $95.00 | $50.00 | $120 |
| 530E00600 SPECIAL - STRUCTURES: REPAIR OF DETERIORATED SURFA | 200 SF | $20.00 | $38.00 | $36.00 | $200 | $175 |
| 601E27000 DUMPED ROCK FILL, TYPE C | 3 CY | $100 | $189 | $184 | $220 | $350 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 296 CY | $180 | $53k | 14% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T=3") | 3,499 SY | $10 | $35k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 8% |
| 611E13200 30" CONDUIT, TYPE A, 706.02 OR 707.01 (12 GAUGE OR | 164 FT | $165 | $27k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,000 | $16k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 104 CY | $150 | $16k | 4% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, 706.01 OR 707.12 | 170 FT | $85 | $14k | 4% |
| 611E52900 34" X 53" CONDUIT, TYPE A, 706.04 | 45 FT | $260 | $12k | 3% |
| 614E12420 DETOUR SIGNING (STA-43-21.03) | 1 LS | $10,300 | $10k | 3% |
| 602E20000 CONCRETE MASONRY | 8.4 CY | $1,220 | $10k | 3% |