WAY-US 250-28.84
WAY County · est $0.1M
Bid dateThursday, April 19—
WAY County · est $0.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Stanley Miller Construction Company | R2Eclipse CO LLC | R3Lockhart Concrete CO | R4Black Horse Bridge Construction INC | % of bid |
|---|---|---|---|---|---|---|
| 611E96600 CONDUIT, BORED OR JACKED, 748.06 (0.500), 30" | 122 FT | $451 | $698 | $1,000 | $330 | 36% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,022 | $2,629 | $5,000 | $67,000 | 15% |
| 203E20000 EMBANKMENT | 365 CY | $25.50 | $22.50 | $15.00 | $35.00 | 6% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 120 FT | $75.00 | $61.00 | $175 | $100 |
| Item | Quantity | R1Stanley Miller Construction Company | R2Eclipse CO LLC | R3Lockhart Concrete CO | R4Black Horse Bridge Construction INC |
|---|---|---|---|---|---|
| 202E35200 PIPE REMOVED, OVER 24" | 16 FT | $25.00 | $26.50 | $20.00 | $20.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $132 | $250 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 11 SY | $1.00 | $1.50 | $2.00 | $1.00 |
| 659E15000 INTER-SEEDING | 11 SY | $1.00 | $1.50 | $2.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 73 CY | $108 | $134 | $100 | $100 | 5% |
| 611E13200 30" CONDUIT, TYPE A, 748.06 (0.500) | 30 FT | $253 | $219 | $500 | $250 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,767 | $3,601 | $2,000 | $5,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $5,811 | $15,000 | $9,000 | $10,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,255 | $18,500 | $5,000 | $6,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,156 | $12,173 | $4,500 | $60,000 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $68.50 | $50.00 | $50.00 | 2% |
| 601E11000 RIPRAP, TYPE D | 7 SY | $323 | $220 | $80.00 | $500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,067 | $7,140 | $4,200 | $5,000 | 1% |
| 602E20000 CONCRETE MASONRY | 2 CY | $1,020 | $1,766 | $700 | $1,000 | 1% |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 659E00300 TOPSOIL | 25 CY | $60.89 | $56.50 | $25.00 | $30.00 | 1% |
| 202E20010 HEADWALL REMOVED | 1 EACH | $1,500 | $422 | $100 | $500 | 1% |
| 203E10000 EXCAVATION | 100 CY | $15.00 | $15.00 | $15.00 | $10.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $572 | $1,157 | $1,000 | $800 | 1% |
| 659E10000 SEEDING AND MULCHING | 229 SY | $4.00 | $3.00 | $2.00 | $4.00 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $600 | $999 | $1,000 | $200 |
| 659E31000 LIME | 0.05 ACRE | $500 | $473 | $1,000 | $500 |
| 659E35000 WATER | 1.27 MGAL | $1.00 | $1.00 | $100 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96600 CONDUIT, BORED OR JACKED, 748.06 (0.500), 30" | 122 FT | $450.56 | $55k | 36% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,022 | $23k | 15% |
| 203E20000 EMBANKMENT | 365 CY | $25.5 | $9k | 6% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 120 FT | $75 | $9k | 6% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 73 CY | $108.2 | $8k | 5% |
| 611E13200 30" CONDUIT, TYPE A, 748.06 (0.500) | 30 FT | $253 | $8k | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,767 | $7k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $5,811 | $6k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,255 | $5k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,156 | $4k | 3% |