HAN-US 68-05.10 Arlington Phase 1
HAN County · est $1.0M
Bid dateThursday, May 3—
HAN County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Miller Contracting Group INC | R2Eagle Bridge CO | R3Helms And Sons Excavating | % of bid |
|---|---|---|---|---|---|
| 611E13400 30" CONDUIT, TYPE B | 1,505 FT | $89.00 | $120 | $141 | 17% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 803 CY | $128 | $116 | $135 | 13% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,246 CY | $35.00 | $36.00 | $35.25 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $59,500 | $18,000 | $20,100 | 8% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (281 CY | $155 | $149 | $138 |
| Item | Quantity | R1Miller Contracting Group INC | R2Eagle Bridge CO | R3Helms And Sons Excavating |
|---|---|---|---|---|
| 202E23900 CONCRETE BASE REMOVED | 1 SY | $30.00 | $300 | $224 |
| 202E30000 WALK REMOVED | 2,551 SF | $1.00 | $4.00 | $1.25 |
| 202E32500 CURB AND GUTTER REMOVED | 729 FT | $1.50 | $3.00 | $3.25 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 627 FT | $10.00 | $5.00 | $23.50 |
| 202E58100 CATCH BASIN REMOVED | 6 EACH | $250 | $150 | $250 |
| 202E98100 REMOVAL MISC.:PLANTER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 255 CY | $165 | $158 | $147 | 5% |
| 202E23000 PAVEMENT REMOVED | 6,319 SY | $6.50 | $8.00 | $10.50 | 5% |
| 304E20000 AGGREGATE BASE | 1,123 CY | $35.00 | $36.00 | $34.00 | 5% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 2,872 FT | $13.00 | $15.00 | $14.75 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,246 CY | $15.00 | $17.00 | $14.00 | 4% |
| 611E05900 15" CONDUIT, TYPE B | 786 FT | $40.00 | $40.00 | $73.00 | 4% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 2,810 FT | $8.50 | $10.00 | $6.25 | 3% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 320 SY | $59.00 | $70.00 | $62.25 | 2% |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $18,750 | $19,000 | $21,500 | 2% |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $3,500 | $3,250 | $3,275 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $14,000 | $4,000 | $6,425 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $10,000 | $9,800 | 2% |
| 608E10000 4" CONCRETE WALK | 2,551 SF | $5.25 | $6.00 | $5.00 | 2% |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $1,600 | $2,500 | $1,675 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $7,500 | $8,000 | 2% |
| 3 EACH |
| $150 |
| $100 |
| $85.00 |
| 202E98100 REMOVAL MISC.:WOOD POST | 1 EACH | $200 | $100 | $30.00 |
| 203E10000 EXCAVATION | 563 CY | $16.00 | $35.00 | $11.50 |
| 203E20000 EMBANKMENT | 40 CY | $15.00 | $90.00 | $16.50 |
| 204E10000 SUBGRADE COMPACTION | 6,740 SY | $1.00 | $1.00 | $0.98 |
| 204E45000 PROOF ROLLING | 2.25 HOUR | $175 | $225 | $100 |
| 608E52000 CURB RAMP | 304 SF | $10.50 | $12.00 | $15.50 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 2 EACH | $275 | $250 | $82.66 |
| 659E10000 SEEDING AND MULCHING | 2,332 SY | $1.50 | $2.00 | $2.89 |
| 659E20000 COMMERCIAL FERTILIZER | 0.31 TON | $500 | $1,000 | $662 |
| 659E35000 WATER | 12.6 MGAL | $20.00 | $20.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,500 | $6,000 | $4,900 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 4.5 CY | $475 | $500 | $225 |
| 611E00900 6" CONDUIT, TYPE B | 100 FT | $13.00 | $5.00 | $54.50 |
| 611E01800 8" CONDUIT, TYPE B | 205 FT | $26.00 | $6.00 | $82.25 |
| 611E04400 12" CONDUIT, TYPE B | 416 FT | $28.00 | $35.00 | $76.00 |
| 611E99582 MANHOLE, NO. 3 WITH 90" BASE I.D. AND 8" WEIR | 1 EACH | $6,800 | $10,500 | $7,925 |
| 204E50000 GEOTEXTILE FABRIC | 6,738 SY | $0.90 | $1.50 | $1.05 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $325 | $400 | $250 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE1-1/2" | 98 SY | $9.25 | $9.02 | $3.50 |
| 407E20000 NON-TRACKING TACK COAT | 888 GAL | $1.50 | $1.50 | $4.75 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 168 SY | $51.00 | $60.00 | $49.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $35.00 | $100 | $43.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 216.5 FT | $12.00 | $11.03 | $13.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 78 FT | $13.00 | $12.03 | $14.25 |
| 630E08600 SIGN POST REFLECTOR | 23 EACH | $43.00 | $40.09 | $47.45 |
| 630E80100 SIGN, FLAT SHEET | 76 SF | $22.00 | $20.05 | $23.75 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 32 EACH | $15.00 | $15.03 | $17.75 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 23 EACH | $15.00 | $15.03 | $17.75 |
| 642E00090 EDGE LINE, 4" | 0.22 MILE | $4,150 | $3,809 | $6,775 |
| 642E00290 CENTER LINE | 0.24 MILE | $7,100 | $6,515 | $10,325 |
| 642E00490 STOP LINE | 19 FT | $44.00 | $40.09 | $7.50 |
| 643E00600 CROSSWALK LINE | 269 FT | $7.75 | $7.02 | $22.75 |
| 202E98100 REMOVAL MISC.:SIGN AND BRACKET ARMS REMOVED AND RE | 1 EACH | $3,000 | $6,014 | $900 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 39 CY | $28.00 | $52.88 | $27.25 |
| 616E10000 WATER | 20 MGAL | $20.00 | $50.00 | $1.00 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,400 | $1,500 | $1,625 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $8,000 | $5,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E13400 30" CONDUIT, TYPE B | 1,505 FT | $89 | $134k | 15% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 803 CY | $128 | $103k | 11% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,246 CY | $35 | $79k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $59,500 | $60k | 6% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (281 CY | $155 | $44k | 5% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 255 CY | $165 | $42k | 5% |
| 202E23000 PAVEMENT REMOVED | 6,319 SY | $6.5 | $41k | 4% |
| 304E20000 AGGREGATE BASE | 1,123 CY | $35 | $39k | 4% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 2,872 FT | $13 | $37k | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,246 CY | $15 | $34k | 4% |