SCI-SR 140-15.06
SCI County · est $0.7M
Bid dateThursday, May 17—
SCI County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 65 more items below.
| Item | Quantity | R1George J Igel & CO INC | R2Complete General Construction Company | R3Double Z Construction Company | R4Shelly & Sands INC | R5Allard Excavation LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 511E33414 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 107 CY | $865 | $950 | $900 | $1,715 | $1,710 | 16% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $60,000 | $60,000 | $43,000 | $51,000 | $21,500 | 11% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 93 CY | $580 | $750 | $750 | $800 | $889 | 10% |
| Item | Quantity | R1George J Igel & CO INC | R2Complete General Construction Company | R3Double Z Construction Company | R4Shelly & Sands INC | R5Allard Excavation LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $4,000 | $7,000 | $1,001 | $19,000 |
| 202E23000 PAVEMENT REMOVED | 1,170 SY | $6.00 | $11.00 | $11.00 | $16.00 | $9.84 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 59 FT | $35.00 | $28.00 | $12.00 | $30.00 | $8.90 |
| 202E38000 GUARDRAIL REMOVED | 175 FT | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $50,000 |
| $50,000 |
| $43,000 |
| $50,067 |
| $52,000 |
| 9% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $42,300 | $16,000 | $35,000 | $29,000 | $9,250 | 8% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 143 SY | $280 | $260 | $250 | $288 | $265 | 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 30,354 LB | $1.10 | $1.03 | $1.25 | $1.18 | $1.62 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 118 CY | $200 | $200 | $200 | $225 | $220 | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $20,000 | $15,000 | $20,000 | $21,220 | $39,200 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $40,000 | $20,000 | $157,000 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 70 CY | $240 | $240 | $240 | $350 | $345 | 3% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 560 FT | $30.00 | $48.00 | $30.00 | $25.00 | $30.27 | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $15,000 | $25,000 | $46,000 | $20,000 | $42,000 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 83.83 FT | $173 | $140 | $147 | $142 | $146 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $3,400 | $4,000 | $2,000 | $4,000 | $1,200 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 550 FT | $20.00 | $18.00 | $17.00 | $17.00 | $12.50 | 2% |
| 526E90010 TYPE A INSTALLATION | 64 FT | $170 | $150 | $185 | $214 | $275 | 2% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 125 SY | $80.00 | $170 | $120 | $90.00 | $102 | 2% |
| 304E20000 AGGREGATE BASE | 98 CY | $100 | $80.00 | $80.00 | $81.00 | $66.72 | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $2,300 | $2,245 | $2,245 | $2,300 | $2,000 | 2% |
| $1.60 |
| $1.60 |
| $1.70 |
| $2.03 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 2 EACH | $200 | $235 | $235 | $250 | $75.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $150 | $85.00 | $85.00 | $90.00 | $72.00 |
| 202E75000 FENCE REMOVED | 404 FT | $4.00 | $2.50 | $2.50 | $2.60 | $0.75 |
| 203E10000 EXCAVATION | 138 CY | $35.00 | $20.00 | $10.00 | $13.00 | $15.80 |
| 203E20000 EMBANKMENT | 242 CY | $20.00 | $26.00 | $30.00 | $12.00 | $18.60 |
| 204E10000 SUBGRADE COMPACTION | 598 SY | $10.00 | $2.50 | $5.00 | $4.00 | $3.22 |
| 606E15050 GUARDRAIL, TYPE MGS | 87.5 FT | $18.70 | $22.40 | $22.40 | $23.00 | $56.98 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,350 | $1,150 | $1,150 | $1,200 | $1,300 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $2,350 | $2,185 | $2,185 | $2,300 | $1,950 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $850 | $820 | $820 | $860 | $875 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,250 | $2,125 | $2,125 | $2,200 | $1,720 |
| 659E10000 SEEDING AND MULCHING | 1,922 SY | $3.00 | $1.56 | $5.00 | $1.75 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 96 SY | $1.00 | $0.69 | $5.00 | $1.00 | $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $625 | $660 | $450 | $630 | $450 |
| 659E31000 LIME | 0.4 ACRE | $85.00 | $153 | $75.00 | $90.00 | $75.00 |
| 659E35000 WATER | 10.4 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 64 FT | $32.00 | $20.00 | $14.00 | $11.00 | $9.50 |
| 611E07200 18" CONDUIT, TYPE A | 56 FT | $120 | $120 | $90.00 | $117 | $48.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 84 FT | $1.00 | $4.00 | $4.00 | $4.00 | $4.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 603 SY | $5.00 | $4.25 | $4.25 | $12.00 | $11.50 |
| 407E10000 TACK COAT | 117 GAL | $2.25 | $2.25 | $2.25 | $2.00 | $2.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 7 CY | $130 | $217 | $140 | $75.00 | $62.00 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (10 CY | $280 | $280 | $280 | $350 | $345 |
| 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 0.12 MILE | $45,000 | $48,500 | $25,000 | $35,000 | $48,500 |
| 621E00100 RPM | 6 EACH | $370 | $348 | $900 | $390 | $900 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $26.00 | $25.00 | $15.00 | $20.00 | $10.50 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 6 EACH | $15.00 | $7.30 | $7.30 | $7.50 | $50.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 13 FT | $11.00 | $25.00 | $25.00 | $26.00 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $45.00 | $75.00 | $75.00 | $79.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $50.00 | $65.00 | $65.00 | $68.00 | $65.00 |
| 642E00094 EDGE LINE, 6" | 0.11 MILE | $8,300 | $8,300 | $8,300 | $8,700 | $8,300 |
| 642E00290 CENTER LINE | 0.06 MILE | $14,900 | $14,900 | $14,900 | $15,500 | $14,900 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $73.50 | $65.00 | $65.00 | $72.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 784 FT | $3.00 | $3.00 | $3.00 | $3.10 | $3.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,000 | $2,675 | $2,675 | $2,800 | $2,675 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $200 | $225 | $150 | $160 | $250 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (BIDIRECTIONAL) | 17 EACH | $50.00 | $50.00 | $50.00 | $11.00 | $50.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 17 EACH | $50.00 | $50.00 | $50.00 | $25.00 | $50.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.4 MILE | $4,825 | $4,825 | $4,825 | $5,100 | $4,825 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 36 FT | $16.50 | $18.50 | $16.50 | $17.00 | $16.50 |
| 616E10000 WATER | 1 MGAL | $47.00 | $80.00 | $75.00 | $30.00 | $1.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 140 FT | $24.00 | $22.00 | $26.00 | $32.00 | $13.50 |
| 202E22900 APPROACH SLAB REMOVED | 67 SY | $45.00 | $50.00 | $35.00 | $22.00 | $31.00 |
| 202E23500 WEARING COURSE REMOVED | 228 SY | $25.00 | $12.00 | $9.00 | $54.00 | $4.53 |
| 202E38500 BRIDGE RAILING REMOVED | 85 FT | $10.00 | $20.00 | $12.00 | $25.00 | $2.65 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 480 FT | $17.00 | $10.00 | $17.00 | $26.00 | $2.64 |
| 507E93300 STEEL POINTS OR SHOES | 16 EACH | $110 | $90.00 | $90.00 | $92.00 | $113 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 95 SY | $26.00 | $26.00 | $20.00 | $27.00 | $26.00 |
| 512E33000 TYPE 2 WATERPROOFING | 127 SY | $25.00 | $22.50 | $25.00 | $23.00 | $22.50 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 53 SF | $3.00 | $9.00 | $10.00 | $7.50 | $2.30 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 47 SF | $10.00 | $10.00 | $12.00 | $8.00 | $2.75 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 85 FT | $32.00 | $45.00 | $25.00 | $33.00 | $45.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 43 CY | $110 | $105 | $95.00 | $104 | $71.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 85 FT | $15.00 | $14.25 | $15.00 | $15.00 | $14.25 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 104 FT | $10.00 | $8.00 | $10.00 | $5.40 | $6.50 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 48 FT | $15.00 | $18.00 | $16.00 | $5.40 | $8.75 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 53 CY | $72.00 | $140 | $85.00 | $200 | $71.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $250 | $240 | $325 | $325 | $210 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $7,000 | $5,000 | $5,000 | $34,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $6,000 | $8,000 | $20,000 | $8,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E33414 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 107 CY | $865 | $93k | 13% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $60,000 | $60k | 8% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 93 CY | $580 | $54k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $50k | 7% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $42,300 | $42k | 6% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 143 SY | $280 | $40k | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 30,354 LB | $1.1 | $33k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 118 CY | $200 | $24k | 3% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |