Published by ODOT on this contract’s Proposal PDF · EDGE Goal: 7%
7.0%EDGE / SBE GoalEDGE = Encouraging Diversity, Growth & Equity — Ohio state-level program for certified businesses owned by economically disadvantaged individuals. Renamed Small Business Enterprise (SBE) in 2025+. Stacks alongside the federal DBE goal.
Project scope
Bid tab · ODOT
Structures / Bridge18%
Earthwork16%
Guardrail & Barrier12%
Erosion & Landscaping10%
Drainage8%
Aggregate & Base6%
Other
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 20 items by low bid’s extended amount · 29 more items below.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
659E14000REPAIR SEEDING AND MULCHING
100 SY
$2.00
659E20000COMMERCIAL FERTILIZER
0.14 TON
$1,000
659E31000LIME
0.21 ACRE
$10.00
659E35000WATER
6 MGAL
$10.00
832E30000EROSION CONTROL
1,000 EACH
$1.00
605E31100AGGREGATE DRAINS
26 FT
$20.00
407E10000TACK COAT
28 GAL
$2.51
626E00102BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL
12 EACH
$10.02
644E00100EDGE LINE, 4"
0.06 MILE
$22,341
644E00300CENTER LINE
0.03 MILE
$24,095
614E12500REPLACEMENT SIGN
5 EACH
$175
616E10000WATER
1 MGAL
$10.00
202E23500WEARING COURSE REMOVED
90 SY
$13.00
512E10100SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)