ATH-US 33-15.60
ATH County · est $1.7M
Bid dateThursday, June 21—
ATH County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Great Lakes Construction CO | % of bid |
|---|---|---|---|---|---|
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 3,392 SY | $60.00 | $72.00 | $84.65 | 15% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 3,257 SY | $60.00 | $74.00 | $84.65 | 15% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 3,392 SY | $50.00 | $47.00 | $80.00 | 13% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 3,257 SY | $50.00 | $48.00 | $80.00 | 12% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,072 SY | $60.00 |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Great Lakes Construction CO |
|---|---|---|---|---|
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 102 EACH | $14.50 | $8.00 | $10.00 |
| 642E00094 EDGE LINE, 6" | 2.2 MILE | $1,450 | $1,534 | $1,450 |
| 642E00194 LANE LINE, 6" | 0.88 MILE | $1,295 | $1,371 | $1,295 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $80.00 | $74.00 | $75.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 135 EACH | $30.00 | $7.00 | $7.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $99.00 |
| $84.65 |
| 5% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,071 SY | $60.00 | $117 | $84.65 | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 6,630 FT | $9.50 | $9.00 | $10.00 | 5% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,072 SY | $50.00 | $57.00 | $80.00 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,071 SY | $50.00 | $56.00 | $80.00 | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,000 | $45,000 | $55,000 | 4% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $1,800 | $937 | $1,800 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $100,000 | 3% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 53 CY | $625 | $619 | $800 | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 11 EACH | $2,120 | $2,200 | $2,300 | 2% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1 1/4" NOMINAL | 3,392 SY | $6.75 | $7.00 | $20.00 | 2% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1 1/4" NOMINAL | 3,257 SY | $6.75 | $7.00 | $20.00 | 2% |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 636 SY | $32.50 | $40.00 | $40.00 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 913 SY | $20.00 | $21.00 | $23.50 | 1% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 866 SY | $20.00 | $21.00 | $23.50 | 1% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $15,000 | $5,369 | $25,000 | 1% |
| 614E13350 OBJECT MARKER, ONE WAY | 135 EACH | $30.00 | $12.00 | $12.00 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 0.6 MILE | $4,360 | $4,616 | $4,360 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 5.2 MILE | $1,790 | $1,895 | $1,790 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT | 1,168 FT | $1.25 | $1.30 | $1.25 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 196 SY | $75.00 | $65.00 | $75.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,000 | $688 | $5,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $5.00 | $5.00 | $5.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 248 SY | $20.00 | $21.00 | $23.50 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 132 SF | $100 | $132 | $125 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 19 CY | $625 | $619 | $800 |
| 848E50000 HAND CHIPPING | 22 SY | $50.00 | $52.00 | $250 |
| 848E50100 TEST SLAB | 1 LS | $500 | $2,409 | $1,500 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $600 | $1,108 | $1,500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1.25" NOMINAL T | 1,071 SY | $6.75 | $7.00 | $20.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 220 SY | $32.50 | $39.00 | $40.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,000 | $6,000 | $15,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $5.00 | $5.00 | $5.00 |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 1.6 CY | $8,000 | $970 | $859 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 45 SF | $100 | $133 | $125 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 12 CY | $625 | $619 | $800 |
| 848E50000 HAND CHIPPING | 14 SY | $50.00 | $81.00 | $250 |
| 848E50100 TEST SLAB | 1 LS | $500 | $2,102 | $1,500 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $650 | $1,109 | $1,500 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 138 SY | $32.50 | $41.00 | $40.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,000 | $6,676 | $15,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $5.00 | $5.00 | $5.00 |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 1.6 CY | $8,000 | $970 | $859 |
| 848E50000 HAND CHIPPING | 64 SY | $50.00 | $71.00 | $250 |
| 848E50100 TEST SLAB | 1 LS | $500 | $2,103 | $1,500 |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $650 | $1,109 | $1,500 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,000 | $688 | $5,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $5.00 | $5.00 | $5.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 248 SY | $20.00 | $22.00 | $23.50 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 3 CY | $625 | $3,923 | $800 |
| 848E50000 HAND CHIPPING | 4 SY | $50.00 | $71.00 | $250 |
| 848E50100 TEST SLAB | 1 LS | $500 | $3,087 | $1,500 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $650 | $1,109 | $1,500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1.25" NOMINAL T | 1,072 SY | $6.75 | $8.00 | $20.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 31 SY | $32.50 | $37.00 | $40.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $9,203 | $30,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $2,200 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 3,392 SY | $60 | $204k | 13% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 3,257 SY | $60 | $195k | 13% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 3,392 SY | $50 | $170k | 11% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 3,257 SY | $50 | $163k | 11% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,072 SY | $60 | $64k | 4% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,071 SY | $60 | $64k | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 6,630 FT | $9.5 | $63k | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,072 SY | $50 | $54k | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,071 SY | $50 | $54k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,000 | $50k | 3% |