MOT-SR 725- 19.75
MOT County · est $1.2M
Bid dateThursday, June 21—
MOT County · est $1.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,647 CY | $149 | $180 | 51% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" Depth | 75,018 SY | $1.45 | $2.17 | 10% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 2,000 SY | $47.00 | $46.43 | 9% |
| 690E12150 SPECIAL - ASPHALT REJUVENATING AGENT | 3,251 GAL | $21.75 | $27.00 | 7% |
| 809E69100 STOP-BAR RADAR DETECTION | 9 EACH | $6,882 | $6,882 | 6% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 3,647 CY | $10.00 | $5.92 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,000 | $25,949 | 3% |
| 407E20000 |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 4 EACH | $370 | $599 |
| 659E00300 TOPSOIL | 20 CY | $100 | $100 |
| 659E10000 SEEDING AND MULCHING | 300 SY | $5.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $5,000 | $5,000 |
| 659E35000 WATER | 2 MGAL | $50.00 | $50.00 |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 200 SY | $1.00 | $15.83 |
| 617E10100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6,379 GAL |
| $2.75 |
| $4.50 |
| 2% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $40,000 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 20 EACH | $520 | $759 | 1% |
| 621E00100 RPM | 519 EACH | $18.65 | $18.65 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,650 | $5,785 | 1% |
| 644E00300 CENTER LINE | 2.45 MILE | $3,835 | $3,835 | 1% |
| 516E31001 JOINT SEALER, AS PER PLAN | 310 FT | $30.00 | $30.00 | 1% |
| 644E00600 CROSSWALK LINE | 3,768 FT | $2.40 | $2.40 | 1% |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 5.98 MILE | $1,320 | $1,320 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.9 MILE | $1,585 | $1,585 | 1% |
| 809E69000 ADVANCE RADAR DETECTION | 1 EACH | $7,382 | $7,382 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $90.73 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 519 EACH | $11.00 | $12.62 | 1% |
| 15 CY |
| $109 |
| $576 |
| 690E12160 SPECIAL - TESTING | 1 LS | $2,730 | $500 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 6 EACH | $250 | $668 |
| 621E00101 RPM, AS PER PLAN | 34 EACH | $18.65 | $18.65 |
| 644E00100 EDGE LINE, 4" | 2 MILE | $2,085 | $2,085 |
| 644E00200 LANE LINE, 4" | 2.99 MILE | $955 | $955 |
| 644E00400 CHANNELIZING LINE, 8" | 3,839 FT | $1.05 | $1.05 |
| 644E00500 STOP LINE | 467 FT | $4.40 | $4.40 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 978 FT | $4.35 | $4.35 |
| 644E01300 LANE ARROW | 69 EACH | $75.00 | $75.00 |
| 632E90500 SIGNALIZATION, MISC.:, UNLASH AND RELASH MESSENGER | 1,700 FT | $3.11 | $3.11 |
| 614E12460 WORK ZONE MARKING SIGN | 8 EACH | $90.00 | $204 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 7,678 FT | $0.50 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 934 FT | $2.40 | $2.40 |
| 516E31001 JOINT SEALER, AS PER PLAN | 137 FT | $30.00 | $30.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,647 CY | $149 | $543k | 49% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" Depth | 75,018 SY | $1.45 | $109k | 10% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 2,000 SY | $47 | $94k | 8% |
| 690E12150 SPECIAL - ASPHALT REJUVENATING AGENT | 3,251 GAL | $21.75 | $71k | 6% |
| 809E69100 STOP-BAR RADAR DETECTION | 9 EACH | $6,882 | $62k | 6% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 3,647 CY | $10 | $36k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,000 | $28k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 6,379 GAL | $2.75 | $18k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $14k | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 20 EACH | $520 | $10k | 1% |