VIN-US 50-16.86
VIN County · est $0.3M
Bid dateThursday, August 9—
VIN County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 48 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Allard Excavation LLC | R3Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 245 CY | $165 | $195 | $165 | 12% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 723 FT | $45.00 | $27.33 | $58.00 | 10% |
| 304E20000 AGGREGATE BASE | 297 CY | $90.00 | $60.00 | $72.00 | 8% |
| 611E04400 12" CONDUIT, TYPE B | 410 FT | $65.00 | $48.06 | $60.00 | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 112 CY | $225 | $205 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Allard Excavation LLC | R3Shelly & Sands INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 2,844 SF | $1.00 | $0.75 | $1.00 |
| 203E20000 EMBANKMENT | 51 CY | $15.00 | $21.70 | $14.75 |
| 204E10000 SUBGRADE COMPACTION | 2,036 SY | $2.00 | $3.37 | $4.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 50 CY | $16.00 | $29.32 | $33.00 |
| 204E21000 GRANULAR EMBANKMENT | 50 CY | $100 | $59.66 | $66.00 |
| 608E52000 CURB RAMP | 144 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $225 |
| 8% |
| 608E10000 4" CONCRETE WALK | 2,606 SF | $9.00 | $5.35 | $7.75 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $57,746 | $10,000 | 6% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 907 SY | $18.00 | $6.75 | $14.00 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25") | 1,787 SY | $9.00 | $5.25 | $9.00 | 5% |
| 203E10000 EXCAVATION | 743 CY | $20.00 | $27.50 | $36.00 | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (70 CY | $195 | $195 | $195 | 4% |
| 611E04600 12" CONDUIT, TYPE C | 171 FT | $65.00 | $37.44 | $65.50 | 3% |
| 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS) | 20 CY | $500 | $195 | $500 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $32,974 | $37,995 | 3% |
| 611E98700 INLET, SIDE DITCH | 4 EACH | $2,200 | $1,910 | $2,250 | 3% |
| 202E32500 CURB AND GUTTER REMOVED | 722 FT | $12.00 | $5.35 | $4.00 | 3% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $4,200 | $834 | $375 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $6,200 | $15,250 | 2% |
| 621E00100 RPM | 21 EACH | $250 | $116 | $45.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $13,500 | $11,850 | 2% |
| $24.00 |
| $19.32 |
| $21.50 |
| 601E32300 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 2 CY | $150 | $118 | $600 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 1,680 SY | $2.00 | $2.90 | $2.20 |
| 659E14000 REPAIR SEEDING AND MULCHING | 84 SY | $1.00 | $0.05 | $2.00 |
| 659E15000 INTER-SEEDING | 84 SY | $1.00 | $4.45 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.3 TON | $450 | $550 | $650 |
| 659E31000 LIME | 0.3 ACRE | $200 | $100 | $120 |
| 659E35000 WATER | 11 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E00100 4" CONDUIT, TYPE B | 100 FT | $8.00 | $19.82 | $13.00 |
| 611E00200 4" CONDUIT, TYPE C | 100 FT | $8.00 | $19.82 | $12.50 |
| 611E00400 4" CONDUIT, TYPE E | 100 FT | $8.00 | $19.82 | $12.50 |
| 611E00406 4" CONDUIT, TYPE F | 100 FT | $8.00 | $19.82 | $12.50 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $800 | $1,100 | $1,250 |
| 407E10000 TACK COAT | 334 GAL | $3.00 | $1.95 | $2.50 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $525 | $280 | $525 |
| 638E10600 FIRE HYDRANT AND GATE VALVE REMOVED AND RESET | 1 EACH | $3,500 | $3,809 | $2,900 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 95.5 FT | $20.00 | $10.00 | $17.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $50.00 | $40.00 | $37.00 |
| 630E80100 SIGN, FLAT SHEET | 46.5 SF | $25.00 | $21.00 | $33.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $50.00 | $50.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $50.00 | $50.00 | $10.00 |
| 644E00104 EDGE LINE, 6" | 0.21 MILE | $4,562 | $12,500 | $4,562 |
| 644E00300 CENTER LINE | 0.29 MILE | $6,993 | $13,675 | $6,993 |
| 644E00400 CHANNELIZING LINE, 8" | 150 FT | $1.65 | $2.00 | $1.65 |
| 644E00500 STOP LINE | 29 FT | $6.35 | $6.00 | $6.35 |
| 644E00600 CROSSWALK LINE | 162 FT | $3.40 | $4.50 | $3.40 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 118 FT | $6.55 | $5.50 | $6.55 |
| 644E00900 ISLAND MARKING | 48 SF | $2.95 | $4.60 | $2.95 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 1 EACH | $590 | $1,000 | $590 |
| 644E01300 LANE ARROW | 3 EACH | $109 | $250 | $109 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $80.00 | $59.92 | $70.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 50 CY | $80.00 | $66.82 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 15 CY | $250 | $290 | $425 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.87 MILE | $2,975 | $2,975 | $2,975 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.31 MILE | $1,875 | $1,875 | $1,875 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 150 FT | $5.75 | $8.75 | $5.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 58 FT | $18.50 | $18.50 | $18.50 |
| 614E27000 WORK ZONE CROSSWALK LINE, CLASS I | 324 FT | $7.50 | $7.50 | $7.50 |
| 614E30000 WORK ZONE ARROW, CLASS I | 3 EACH | $350 | $350 | $350 |
| 614E31700 WORK ZONE SCHOOL SYMBOL MARKING, 72", CLASS I | 1 EACH | $725 | $725 | $725 |
| 616E10000 WATER | 3 MGAL | $1.00 | $1.00 | $21.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $9,300 | $2,750 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 245 CY | $165 | $40k | 10% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 723 FT | $45 | $33k | 8% |
| 304E20000 AGGREGATE BASE | 297 CY | $90 | $27k | 7% |
| 611E04400 12" CONDUIT, TYPE B | 410 FT | $65 | $27k | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 112 CY | $225 | $25k | 6% |
| 608E10000 4" CONCRETE WALK | 2,606 SF | $9 | $23k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 5% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 907 SY | $18 | $16k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25") | 1,787 SY | $9 | $16k | 4% |
| 203E10000 EXCAVATION | 743 CY | $20 | $15k | 4% |