631E93241SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A
24 EACH
$9,725
$9,300
$10,950
$10,580
$11,000
$10,940
$10,490
$10,525
$13,029
87%
631E94490REMOVAL, MISC.: SCHOOL SPEED LIMIT ASSEMBLY AND CO
24 EACH
Project details
Description
D05-FY 2019 School Flasher
Type of work
Safety
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$600
$1,100
$400
$1,585
$650
$1,100
$1,910
$2,300
$1,020
5%
624E10000MOBILIZATION
1 LS
$10,000
$10,000
$15,000
$10,000
$10,000
$10,000
$10,000
$15,000
$12,000
4%
625E32000GROUND ROD
24 EACH
$250
$190
$175
$185
$100
$190
$275
$240
$172
2%
614E11000MAINTAINING TRAFFIC
1 LS
$2,000
$20,000
$6,000
$1,500
$15,550
$9,200
$15,468
$17,000
$8,640
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$1,450
$10,800
$3,500
$920
$1,888
$1,900
$3,500
$2,100
$5,539
1%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$1,000
$4,500
$2,500
$900
$4,800
$2,100
$250
$4,600
$6,960
0%
630E87520REMOVAL OF POLE MOUNTED SIGN AND REERECTION
1 EACH
$500
$60.00
$350
$145
$300
$90.00
$175
$200
$120
0%
630E03100GROUND MOUNTED SUPPORT, NO. 3 POST
10.5 FT
$25.00
$15.00
$20.00
$28.00
$44.00
$17.00
$20.00
$32.00
$24.00
0%
$9,725
$233k
87%
631E94490REMOVAL, MISC.: SCHOOL SPEED LIMIT ASSEMBLY AND CO
24 EACH
$600
$14k
5%
624E10000MOBILIZATION
1 LS
$10,000
$10k
4%
625E32000GROUND ROD
24 EACH
$250
$6k
2%
614E11000MAINTAINING TRAFFIC
1 LS
$2,000
$2k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$1,450
$1k
1%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$1,000
$1k
0%
630E87520REMOVAL OF POLE MOUNTED SIGN AND REERECTION