FAI-/LIC-US 33/IR 70-Various
FAI County · est $0.3M
Bid dateThursday, September 13—
FAI County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 62 more items below.
| Item | Quantity | R1Righter Company INC | R2Complete General Construction Company | % of bid |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $83,000 | $90,000 | 24% |
| 516E31001 JOINT SEALER, AS PER PLAN | 939 FT | $45.00 | $82.00 | 12% |
| 511E71200 CONCRETE, MISC.: MSE WALL REPAIR | 31 SF | $1,000 | $300 | 9% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM | 368 FT | $70.00 | $75.00 | 7% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 180 FT | $130 | $75.00 | 7% |
| 611E04600 12" CONDUIT, TYPE C | 186 FT | $100 | $130 | 5% |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $3,500 | $4,000 | 4% |
| 304E20000 AGGREGATE BASE | 270 CY |
| Item | Quantity | R1Righter Company INC | R2Complete General Construction Company |
|---|---|---|---|
| 202E98400 REMOVAL MISC.: PORTIONS OF STRUCTURE REMOVED | 31 SF | $85.00 | $250 |
| 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 3 SY | $1,500 | $600 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 5 SY | $210 | $100 |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM | 32 FT | $105 | $85.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 15 SF | $300 | $125 |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 10 CY | $400 | $300 |
| 202E38200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $50.00 |
| $100 |
| 4% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM | 189 FT | $65.00 | $85.00 | 4% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 90 FT | $130 | $75.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $20,000 | 3% |
| 511E71200 CONCRETE, MISC.: MSE WALL REPAIR | 6 SF | $1,600 | $550 | 3% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM | 100 FT | $95.00 | $85.00 | 3% |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 4 EACH | $1,960 | $1,960 | 2% |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,500 | $4,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $6,000 | 2% |
| 516E31001 JOINT SEALER, AS PER PLAN | 80 FT | $75.00 | $95.00 | 2% |
| 516E31001 JOINT SEALER, AS PER PLAN | 90 FT | $65.00 | $95.00 | 2% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 45 FT | $130 | $110 | 2% |
| 611E04600 12" CONDUIT, TYPE C | 56 FT | $90.00 | $160 | 1% |
| 45 FT |
| $2.00 |
| $2.00 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 1 EACH | $95.00 | $95.00 |
| 202E98200 REMOVAL MISC.: 1" PEJF WITH HOT APPLIED JOINT SEAL | 304 FT | $10.00 | $20.00 |
| 202E98400 REMOVAL MISC.: PORTIONS OF STRUCTURE REMOVED | 6 SF | $85.00 | $330 |
| 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2 SY | $1,800 | $900 |
| 304E20000 AGGREGATE BASE | 2 CY | $210 | $200 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 3 SY | $310 | $150 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 21 SF | $210 | $105 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2.4 CY | $810 | $240 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $2,500 | $1,760 |
| 606E16000 GUARDRAIL REBUILT | 45 FT | $15.60 | $15.60 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 1 EACH | $1,960 | $1,960 |
| 611E04600 12" CONDUIT, TYPE C | 28 FT | $140 | $160 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $3,500 | $4,000 |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 5 CY | $255 | $525 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 45 SY | $10.00 | $12.60 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 180 FT | $2.00 | $2.00 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 4 EACH | $95.00 | $95.00 |
| 202E98200 REMOVAL MISC.: 1" PEJF WITH HOT APPLIED JOINT SEAL | 207 FT | $15.00 | $20.00 |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 1" PRECOM | 19 FT | $75.00 | $75.00 |
| 516E31001 JOINT SEALER, AS PER PLAN | 9 FT | $100 | $125 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 10 CY | $475 | $240 |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $2,500 | $1,760 |
| 606E16000 GUARDRAIL REBUILT | 180 FT | $12.60 | $12.60 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 206 SY | $10.00 | $7.90 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 90 FT | $2.00 | $2.00 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 2 EACH | $95.00 | $95.00 |
| 202E98200 REMOVAL MISC.: 1" PEJF WITH HOT APPLIED JOINT SEAL | 100 FT | $15.00 | $20.00 |
| 304E20000 AGGREGATE BASE | 5 CY | $180 | $180 |
| 516E31001 JOINT SEALER, AS PER PLAN | 5 FT | $100 | $150 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 90 FT | $20.00 | $25.50 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 5 CY | $475 | $240 |
| 602E20000 CONCRETE MASONRY | 0.6 CY | $2,500 | $1,760 |
| 606E16000 GUARDRAIL REBUILT | 90 FT | $15.60 | $15.60 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 2 EACH | $1,960 | $1,960 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 62 SY | $10.00 | $12.60 |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 500 LB | $10.00 | $10.00 |
| 516E31001 JOINT SEALER, AS PER PLAN | 64 FT | $65.00 | $95.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 20 FT | $2.00 | $2.00 |
| 304E20000 AGGREGATE BASE | 1 CY | $450 | $215 |
| 516E31001 JOINT SEALER, AS PER PLAN | 3 FT | $100 | $200 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $510 | $211 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $2,500 | $1,760 |
| 606E16000 GUARDRAIL REBUILT | 20 FT | $17.60 | $17.60 |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 20 FT | $190 | $150 |
| 611E04600 12" CONDUIT, TYPE C | 50 FT | $100 | $150 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $3,500 | $4,000 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 56 SY | $10.00 | $12.60 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 30 FT | $2.00 | $2.00 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 1 EACH | $95.00 | $95.00 |
| 304E20000 AGGREGATE BASE | 2 CY | $220 | $150 |
| 516E31001 JOINT SEALER, AS PER PLAN | 1 FT | $290 | $325 |
| 606E16000 GUARDRAIL REBUILT | 30 FT | $19.80 | $19.80 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 1 EACH | $1,860 | $1,860 |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 30 FT | $125 | $140 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,500 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $83,000 | $83k | 18% |
| 516E31001 JOINT SEALER, AS PER PLAN | 939 FT | $45 | $42k | 9% |
| 511E71200 CONCRETE, MISC.: MSE WALL REPAIR | 31 SF | $1,000 | $31k | 7% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM | 368 FT | $70 | $26k | 6% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 180 FT | $130 | $23k | 5% |
| 611E04600 12" CONDUIT, TYPE C | 186 FT | $100 | $19k | 4% |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $3,500 | $14k | 3% |
| 304E20000 AGGREGATE BASE | 270 CY | $50 | $14k | 3% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM | 189 FT | $65 | $12k | 3% |
| 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN | 90 FT | $130 | $12k | 3% |