HOC-US 33-09.22 L&R
HOC County · est $0.9M
Bid dateThursday, November 8—
HOC County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Bridge Specialists INC | R3Great Lakes Construction CO | R4Shelly & Sands INC | R5Double Z Construction Company | R6Miller Bros Const INC | R7Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 37 CY | $2,000 | $500 | $1,570 | $1,750 | $1,780 | $1,400 | $767 | 10% |
| 517E76201 RAILING FACED, AS PER PLAN | 549 FT | $130 | $140 | $165 | $142 | $198 | $180 | $273 | 9% |
| Item | Quantity | R1Complete General Construction Company | R2Bridge Specialists INC | R3Great Lakes Construction CO | R4Shelly & Sands INC | R5Double Z Construction Company | R6Miller Bros Const INC | R7Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,500 | $2,600 | $9,800 | $3,500 | $2,500 | $3,000 | $5,000 |
| 202E38000 GUARDRAIL REMOVED | 224 FT | $2.50 | $2.50 | $2.50 | $2.00 | $2.50 | $2.50 | $2.50 |
| 606E13000 GUARDRAIL, TYPE 5 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 976 SY |
| $70.00 |
| $77.50 |
| $95.00 |
| $98.00 |
| $130 |
| $115 |
| $102 |
| 9% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 936 SY | $70.00 | $79.00 | $95.00 | $101 | $130 | $115 | $106 | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (T=1") | 976 SY | $65.00 | $47.00 | $70.00 | $53.00 | $40.00 | $64.00 | $41.15 | 8% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (T=1") | 936 SY | $65.00 | $47.00 | $70.00 | $55.00 | $45.00 | $64.00 | $42.00 | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $66,000 | $108,615 | $151,450 | $121,000 | $70,000 | $51,332 | 7% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $51,213 | $8,000 | $36,600 | $5,000 | $70,000 | $47,427 | 7% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 82 CY | $600 | $625 | $660 | $511 | $500 | $900 | $1,358 | 7% |
| 622E41000 PORTABLE BARRIER, 32" | 2,020 FT | $14.00 | $16.90 | $13.00 | $12.00 | $14.50 | $14.00 | $13.78 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 23,868 LB | $1.10 | $2.00 | $1.35 | $1.20 | $1.40 | $1.50 | $1.73 | 3% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 50 CY | $480 | $450 | $480 | $450 | $480 | $450 | $480 | 3% |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 1,120 FT | $19.00 | $16.90 | $14.00 | $14.00 | $15.00 | $14.00 | $15.40 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $80,495 | $40,000 | $40,000 | $40,000 | $20,000 | $85,180 | 3% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 28 CY | $653 | $813 | $605 | $665 | $615 | $850 | $954 | 2% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 29 CY | $605 | $813 | $605 | $642 | $615 | $850 | $954 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $11,765 | $20,000 | $18,000 | $20,000 | $25,000 | $10,966 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (T=1.25") | 1,422 SY | $8.50 | $4.00 | $8.50 | $2.50 | $12.00 | $8.50 | $8.91 | 2% |
| 516E11900 HORIZONTAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 11 FT | $1,050 | $970 | $1,000 | $1,304 | $1,100 | $1,100 | $1,264 | 2% |
| 848E50000 HAND CHIPPING | 147 SY | $65.00 | $65.00 | $40.00 | $63.00 | $70.00 | $80.00 | $63.15 | 1% |
| 225 FT |
| $16.50 |
| $16.50 |
| $16.50 |
| $17.00 |
| $16.50 |
| $16.50 |
| $16.50 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $625 | $625 | $625 | $662 | $850 | $625 | $625 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,310 | $1,310 | $1,310 | $1,389 | $1,400 | $1,310 | $1,310 |
| 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 4 EACH | $300 | $300 | $300 | $318 | $450 | $300 | $300 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 1,000 SY | $4.15 | $3.50 | $4.00 | $3.80 | $6.34 | $6.34 | $6.50 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 114 GAL | $4.00 | $3.50 | $4.00 | $3.50 | $4.00 | $3.50 | $4.00 |
| 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE) | 796 FT | $5.50 | $8.50 | $8.00 | $4.80 | $9.66 | $6.40 | $6.40 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $25.00 | $26.00 | $9.00 | $16.00 | $12.00 | $5.00 | $185 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1 WAY | 48 EACH | $10.00 | $13.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1 WAY | 14 EACH | $10.00 | $13.00 | $10.00 | $10.00 | $7.00 | $10.00 | $10.00 |
| 642E00094 EDGE LINE, 6" | 0.36 MILE | $2,500 | $2,500 | $6,665 | $2,651 | $2,500 | $2,500 | $2,500 |
| 642E00194 LANE LINE, 6" | 0.18 MILE | $3,900 | $3,900 | $6,350 | $4,137 | $3,900 | $3,900 | $3,900 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 4 EACH | $2,135 | $2,400 | $1,800 | $1,850 | $1,850 | $2,550 | $1,800 |
| 614E12410 SPEED ZONE AHEAD SYMBOL SIGN | 4 EACH | $150 | $150 | $160 | $159 | $150 | $150 | $150 |
| 614E12490 RESUME LEGAL SPEED SIGN | 4 EACH | $150 | $150 | $150 | $159 | $150 | $150 | $150 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1 WAY | 134 EACH | $13.50 | $17.50 | $8.00 | $6.00 | $13.50 | $13.50 | $13.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 134 EACH | $19.50 | $25.00 | $11.00 | $13.00 | $19.50 | $19.50 | $19.50 |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 8 SNMT | $900 | $900 | $850 | $762 | $900 | $900 | $1,338 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 3.44 MILE | $1,050 | $1,050 | $790 | $1,114 | $1,050 | $1,050 | $1,050 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 4,200 FT | $0.27 | $0.27 | $0.50 | $0.30 | $0.27 | $0.27 | $0.27 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $2.25 | $2.60 | $3.50 | $2.40 | $3.00 | $2.00 | $3.34 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 1.5 CY | $4,000 | $2,600 | $2,400 | $4,290 | $2,000 | $3,500 | $3,213 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 652 SY | $9.50 | $14.00 | $9.50 | $10.00 | $9.50 | $7.50 | $11.00 |
| 848E50100 TEST SLAB | 1 LS | $100 | $1,500 | $1,200 | $1,150 | $1,400 | $2,000 | $3,601 |
| 848E50200 FULL-DEPTH REPAIR | 11 CY | $605 | $350 | $150 | $740 | $455 | $300 | $1,764 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, (T=1.25") | 915 SY | $10.00 | $7.80 | $10.00 | $12.00 | $12.00 | $10.00 | $10.52 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $2.25 | $2.60 | $3.50 | $2.40 | $3.00 | $2.00 | $3.18 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 1.4 CY | $4,000 | $1,300 | $2,400 | $4,600 | $2,000 | $3,500 | $3,429 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 618 SY | $9.50 | $14.00 | $9.50 | $10.00 | $9.50 | $8.00 | $11.00 |
| 516E11900 HORIZONTAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 8 FT | $1,050 | $970 | $1,000 | $1,380 | $1,200 | $1,100 | $1,265 |
| 848E50000 HAND CHIPPING | 141 SY | $65.00 | $65.00 | $40.00 | $66.00 | $70.00 | $80.00 | $62.58 |
| 848E50100 TEST SLAB | 1 LS | $100 | $1,500 | $1,200 | $2,430 | $1,400 | $2,000 | $3,601 |
| 848E50200 FULL-DEPTH REPAIR | 10 CY | $650 | $350 | $150 | $813 | $455 | $300 | $1,817 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, (T=1.25") | 915 SY | $10.00 | $7.80 | $10.00 | $12.00 | $12.00 | $10.00 | $12.11 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $13,000 | $11,950 | $6,000 | $8,000 | $8,500 | $6,831 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 37 CY | $2,000 | $74k | 8% |
| 517E76201 RAILING FACED, AS PER PLAN | 549 FT | $130 | $71k | 8% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 976 SY | $70 | $68k | 8% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 936 SY | $70 | $66k | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (T=1") | 976 SY | $65 | $63k | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (T=1") | 936 SY | $65 | $61k | 7% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $50k | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $50k | 6% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 82 CY | $600 | $49k | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 2,020 FT | $14 | $28k | 3% |