CLA-IR 70-16.33/20.15
CLA County · est $1.0M
Bid dateThursday, November 29—
CLA County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 56 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Bridge Specialists INC | R3Complete General Construction Company | % of bid |
|---|---|---|---|---|---|
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 721 SF | $110 | $99.00 | $105 | 11% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,084 SY | $55.00 | $40.00 | $35.00 | 8% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,084 SY | $52.00 | $47.00 | $70.00 | 8% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 829 SY | $65.00 | $42.00 | $35.00 | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 1,408 SF | $32.07 |
| Item | Quantity | R1Eagle Bridge CO | R2Bridge Specialists INC | R3Complete General Construction Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $4,000 | $6,000 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE1.5" | 537 SY | $7.00 | $3.00 | $14.50 |
| 407E10000 TACK COAT | 43 GAL | $1.00 | $1.00 | $5.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 23 CY | $601 | $600 | $380 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $30.00 |
| $30.61 |
| 6% |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 361 SF | $125 | $99.00 | $110 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $45,000 | $36,780 | $20,000 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $45,000 | $40,680 | $35,000 | 6% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 829 SY | $52.00 | $47.00 | $70.00 | 6% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 78 FT | $460 | $500 | $500 | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 937 SF | $35.08 | $40.00 | $40.82 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,000 | $15,000 | $10,000 | 4% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 57 FT | $475 | $500 | $450 | 4% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 15 CY | $1,500 | $995 | $2,000 | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 915 SY | $22.05 | $27.00 | $22.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $51,000 | $40,000 | 3% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 13 CY | $1,500 | $923 | $2,000 | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 735 SY | $22.05 | $27.00 | $22.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,000 | $15,999 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $17,832 | $10,000 | 2% |
| 646E10000 EDGE LINE, 4" | 0.4 MILE | $4,009 | $14,850 | $14,850 |
| 646E10200 CENTER LINE | 0.2 MILE | $8,018 | $16,455 | $16,455 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $65.00 | $85.00 | $80.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $950 | $2,000 | $900 |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 560 FT | $15.54 | $15.50 | $40.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 1,376 LB | $1.75 | $3.00 | $4.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $1.00 | $3.00 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 52 EACH | $18.00 | $20.00 | $30.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 701 SY | $15.03 | $19.00 | $15.00 |
| 513E21000 TRIMMING OF BEAM END | 5 EACH | $350 | $625 | $255 |
| 513E95020 STRUCTURAL STEEL, MISC.:REMOVAL AND RESET OF END F | 1 LS | $3,500 | $5,625 | $10,000 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 937 SF | $5.01 | $10.00 | $10.20 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 937 SF | $5.01 | $10.00 | $10.20 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 937 SF | $5.01 | $8.00 | $8.16 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 10 MNHR | $85.20 | $150 | $153 |
| 514E10000 FINAL INSPECTION REPAIR | 2 EACH | $150 | $300 | $306 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 50 FT | $14.00 | $26.00 | $22.50 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $900 | $990 | $850 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $12,500 | $9,750 | $5,000 |
| 530E00400 SPECIAL - STRUCTURES MISC.: CLEANING OF SCUPPERS A | 16 EACH | $50.00 | $95.00 | $750 |
| 607E98100 FENCE, MISC.:VPF ANCHORS | 48 EACH | $37.09 | $65.00 | $37.00 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 30 CY | $210 | $200 | $195 |
| 848E50000 HAND CHIPPING | 58 SY | $50.00 | $75.00 | $70.00 |
| 848E50100 TEST SLAB | 1 LS | $500 | $1,200 | $500 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $1,750 | $500 | $500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED 1 1/4" | 818 SY | $7.00 | $11.00 | $12.50 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 40 SY | $50.00 | $75.00 | $25.00 |
| 202E75267 VANDAL PROTECTION FENCE REMOVED AND RESET, AS PER | 742 FT | $14.53 | $14.50 | $30.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 1,522 LB | $1.75 | $3.00 | $4.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $1.00 | $3.00 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 74 EACH | $18.00 | $20.00 | $30.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 835 SY | $15.03 | $19.00 | $15.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 38 LB | $20.00 | $87.00 | $200 |
| 513E21000 TRIMMING OF BEAM END | 6 EACH | $350 | $625 | $255 |
| 513E95020 STRUCTURAL STEEL, MISC.:REMOVAL AND RESET OF END F | 1 LS | $2,500 | $5,625 | $10,000 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1,408 SF | $5.01 | $10.00 | $10.20 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1,408 SF | $5.01 | $10.00 | $10.20 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1,408 SF | $5.01 | $5.00 | $5.10 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 10 MNHR | $85.20 | $150 | $153 |
| 514E10000 FINAL INSPECTION REPAIR | 2 EACH | $150 | $300 | $306 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 72 FT | $14.00 | $26.00 | $22.50 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,000 | $1,120 | $850 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $12,500 | $9,750 | $5,000 |
| 530E00400 SPECIAL - STRUCTURES MISC.: CLEANING OF SCUPPERS A | 16 EACH | $50.00 | $95.00 | $750 |
| 607E98100 FENCE, MISC.:VPF ANCHORS | 116 EACH | $37.09 | $65.00 | $37.00 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 43 CY | $210 | $200 | $195 |
| 848E50000 HAND CHIPPING | 143 SY | $50.00 | $70.00 | $70.00 |
| 848E50100 TEST SLAB | 1 LS | $500 | $1,200 | $500 |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $1,500 | $500 | $500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED 1 1/4" | 1,073 SY | $7.00 | $9.00 | $12.50 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 72 SY | $50.00 | $50.00 | $25.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 721 SF | $110 | $79k | 8% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,084 SY | $55 | $60k | 6% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,084 SY | $52 | $56k | 6% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 829 SY | $65 | $54k | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 1,408 SF | $32.07 | $45k | 5% |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 361 SF | $125 | $45k | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $45,000 | $45k | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $45,000 | $45k | 5% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 829 SY | $52 | $43k | 4% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 78 FT | $460 | $36k | 4% |