HAM-IR 71-08.03
HAM County · est $0.3M
Bid dateThursday, November 29—
HAM County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Ohio Irrigation Lawn Sprinkler Systems | R3Ford Development CORP | R4Sunesis Construction CO | R5Barrett Paving Materials INC | R6Great Lakes Construction CO | R7John R Jurgensen Company | R8Prus Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 601E21150 SLOPE PROTECTION, MISC. CONCRETE SLOPE PROTECTION | 175 CY | $500 | $650 | $700 | $774 | $900 | $650 | $1,357 | $1,500 | 25% |
| AA2 601E21150 SLOPE PROTECTION, MISC. CONCRETE SLOPE PROTECTION | 83 CY | $558 | $600 | $700 | $1,116 | $1,150 |
| Item | Quantity | R1Eclipse CO LLC | R2Ohio Irrigation Lawn Sprinkler Systems | R3Ford Development CORP | R4Sunesis Construction CO | R5Barrett Paving Materials INC | R6Great Lakes Construction CO | R7John R Jurgensen Company | R8Prus Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $282 | $1,500 | $100 | $273 | $200 | $135 | $781 | $900 |
| 202E32700 GUTTER REMOVED | 82 SY | $16.50 | $30.00 | $10.00 | $19.06 | $20.00 | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,500 |
| $1,608 |
| $1,500 |
| 13% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $30,000 | $10,000 | $30,779 | $10,000 | $10,000 | $14,266 | $35,000 | 12% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $21,000 | $3,000 | $15,000 | $58,729 | $50,000 | $39,500 | $1,554 | $24,000 | 6% |
| 659E00300 TOPSOIL | 363 CY | $48.50 | $40.00 | $10.00 | $50.64 | $60.00 | $25.00 | $44.18 | $56.00 | 5% |
| 611E13600 30" CONDUIT, TYPE C | 139 FT | $114 | $60.00 | $200 | $180 | $120 | $135 | $163 | $165 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $20,000 | $26,700 | $7,635 | $35,000 | $16,000 | $11,384 | $16,000 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,000 | $2,000 | $4,000 | $1,150 | $10,000 | $8,000 | $3,076 | $6,000 | 4% |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 695 SY | $19.00 | $50.00 | $40.00 | $26.12 | $12.00 | $35.00 | $10.62 | $18.00 | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 633 CY | $20.00 | $20.00 | $40.00 | $19.26 | $25.00 | $32.00 | $20.00 | $46.00 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,500 | $20,000 | $4,000 | $3,551 | $6,340 | $5,000 | $2,964 | $7,500 | 4% |
| 203E20000 EMBANKMENT | 958 CY | $12.00 | $40.00 | $40.00 | $12.33 | $25.00 | $28.00 | $40.05 | $45.00 | 3% |
| AA2 202E32801 CONCRETE SLOPE PROTECTION REMOVED, AS PER PLAN | 495 SY | $19.00 | $50.00 | $40.00 | $26.09 | $12.00 | $50.00 | $21.08 | $40.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 3,268 SY | $2.00 | $1.00 | $1.00 | $1.25 | $1.55 | $1.55 | $1.25 | $1.35 | 2% |
| 202E98000 REMOVAL MISC.: DEBRIS REMOVAL | 1 LS | $6,500 | $5,000 | $23,000 | $15,212 | $15,000 | $35,000 | $9,259 | $16,000 | 2% |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 1 EACH | $5,026 | $8,000 | $10,000 | $7,895 | $8,000 | $8,055 | $6,000 | $6,000 | 1% |
| 518E42200 8" PERFORATED CORRUGATED STEEL PIPE, 707.01 | 175 FT | $23.50 | $30.00 | $10.00 | $24.20 | $10.00 | $35.00 | $44.83 | $45.00 | 1% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,990 | $1,500 | $2,000 | $1,950 | $3,000 | $2,100 | $1,124 | $5,250 | 1% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 27 CY | $91.00 | $80.00 | $100 | $146 | $120 | $120 | $234 | $140 | 1% |
| 601E38000 PAVED GUTTER, TYPE 1-4 | 21 FT | $115 | $50.00 | $80.00 | $144 | $240 | $215 | $299 | $250 | 1% |
| $92.65 |
| $24.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 5 FT | $36.00 | $500 | $10.00 | $44.19 | $100 | $75.00 | $116 | $90.00 |
| 601E38100 PAVED GUTTER, TYPE 1-6 | 7 FT | $170 | $150 | $100 | $228 | $240 | $300 | $537 | $300 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $158 | $300 | $50.00 | $200 | $250 | $50.00 | $200 | $225 |
| 659E14000 REPAIR SEEDING AND MULCHING | 163 SY | $1.50 | $3.00 | $1.00 | $1.00 | $1.55 | $1.55 | $1.00 | $1.35 |
| 659E15000 INTER-SEEDING | 163 SY | $1.50 | $3.00 | $1.00 | $0.01 | $0.40 | $0.40 | $0.01 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.74 TON | $683 | $2,000 | $400 | $500 | $700 | $700 | $500 | $600 |
| 659E31000 LIME | 0.68 ACRE | $210 | $2,000 | $100 | $200 | $100 | $100 | $200 | $250 |
| 659E35000 WATER | 19 MGAL | $26.50 | $10.00 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,785 | $1,500 | $2,000 | $2,683 | $3,000 | $3,000 | $4,455 | $2,500 |
| 832E30000 EROSION CONTROL | 1,902 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 518E42300 8" NON-PERFORATED CORRUGATED STEEL PIPE, INCLUDING | 15 FT | $33.50 | $20.00 | $10.00 | $47.90 | $30.00 | $40.00 | $44.87 | $130 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $700 | $1,000 | $1,000 | $1,769 | $2,500 | $1,635 | $975 | $1,750 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E21150 SLOPE PROTECTION, MISC. CONCRETE SLOPE PROTECTION | 175 CY | $500 | $88k | 24% |
| AA2 601E21150 SLOPE PROTECTION, MISC. CONCRETE SLOPE PROTECTION | 83 CY | $558 | $46k | 13% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 11% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $21,000 | $21k | 6% |
| 659E00300 TOPSOIL | 363 CY | $48.5 | $18k | 5% |
| 611E13600 30" CONDUIT, TYPE C | 139 FT | $114 | $16k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $15k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,000 | $14k | 4% |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 695 SY | $19 | $13k | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 633 CY | $20 | $13k | 4% |