STA-LG FY2019
STA County · est $1.2M
Bid dateThursday, November 29—
STA County · est $1.2M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Thompson Electric INC | R3Complete General Construction Company | R4Miller Cable Company | R5J Ranck Electric INC | R6Central-allied Enterprises INC | R7Eclipse CO LLC | R8U S Utility Contractor Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 625E13200 LIGHT TOWER, BBBB100 | 10 EACH | $15,450 | $14,640 | $16,000 | $15,500 | $21,600 | $18,500 | $23,600 | $17,185 | 18% |
| 625E13400 LIGHT TOWER, BBBBBB100 | 8 EACH | $15,500 | $14,945 | $15,900 | $16,000 | $21,700 |
| Item | Quantity | R1Cornerstone Electric INC | R2Thompson Electric INC | R3Complete General Construction Company | R4Miller Cable Company | R5J Ranck Electric INC | R6Central-allied Enterprises INC | R7Eclipse CO LLC | R8U S Utility Contractor Company |
|---|---|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $500 | $2,750 | $17,000 | $6,200 | $1,800 | $35,000 | $7,945 | $21,725 |
| 202E30700 CONCRETE BARRIER REMOVED | 25 FT | $200 | $141 | $100 | $85.00 | $150 | $125 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $18,500 |
| $23,680 |
| $16,921 |
| 14% |
| 625E29000 TRENCH | 12,523 FT | $6.00 | $4.05 | $2.25 | $12.00 | $3.25 | $5.75 | $7.00 | $10.19 | 9% |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 9 EACH | $8,300 | $6,360 | $6,800 | $18,000 | $22,600 | $21,000 | $8,385 | $16,830 | 9% |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 9 EACH | $8,000 | $6,030 | $5,500 | $15,000 | $21,350 | $20,000 | $7,577 | $15,629 | 8% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 11,600 FT | $5.00 | $6.24 | $6.50 | $8.00 | $6.25 | $5.35 | $7.35 | $6.26 | 7% |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 48 EACH | $1,150 | $1,690 | $1,230 | $1,300 | $1,575 | $1,700 | $1,820 | $1,582 | 6% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 3" | 1,034 FT | $35.00 | $42.85 | $39.00 | $42.00 | $40.00 | $58.00 | $47.50 | $51.68 | 4% |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 24 EACH | $1,150 | $1,673 | $1,230 | $1,300 | $1,450 | $1,700 | $1,693 | $1,458 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $13,473 | $15,000 | $54,110 | $76,000 | $40,000 | $67,557 | $62,250 | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 27 EACH | $800 | $683 | $860 | $700 | $750 | $500 | $597 | $716 | 3% |
| 625E75502 PORTION OF LIGHT POLE FOUNDATION REMOVED | 132 EACH | $150 | $250 | $250 | $75.00 | $225 | $300 | $326 | $417 | 2% |
| 625E75400 LIGHT POLE REMOVED | 132 EACH | $145 | $109 | $150 | $115 | $125 | $300 | $323 | $256 | 2% |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 16 EACH | $1,150 | $1,673 | $1,230 | $1,300 | $1,575 | $1,700 | $1,820 | $1,582 | 2% |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) | 7 EACH | $2,500 | $1,308 | $3,400 | $2,100 | $2,500 | $2,850 | $22,660 | $18,975 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $65.00 | $68.25 | $70.00 | $75.00 | $50.00 | $75.00 | $67.00 | $65.00 | 2% |
| 625E25401 CONDUIT, 2", 725.04, AS PER PLAN | 1,015 FT | $12.00 | $14.20 | $23.00 | $22.00 | $27.50 | $21.65 | $22.00 | $16.53 | 1% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 4,518 FT | $2.25 | $2.46 | $2.70 | $2.80 | $2.75 | $2.00 | $2.50 | $3.01 | 1% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 108 EACH | $90.00 | $74.50 | $110 | $75.00 | $130 | $175 | $99.00 | $96.00 | 1% |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 1,307 FT | $7.00 | $8.70 | $9.50 | $11.00 | $8.50 | $10.70 | $9.00 | $7.73 | 1% |
| $68.00 |
| $13,080 |
| 622E90000 BARRIER, MISC.:40" TYPE D | 25 FT | $200 | $77.60 | $260 | $260 | $700 | $430 | $194 | $158 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 1,650 FT | $2.75 | $2.95 | $4.00 | $3.20 | $3.50 | $3.40 | $3.50 | $3.42 |
| 625E30701 PULL BOX, 725.08, 18", AS PER PLAN | 6 EACH | $850 | $683 | $860 | $700 | $750 | $430 | $597 | $791 |
| 625E30720 PULL BOX, 725.08, 36" | 4 EACH | $2,000 | $2,150 | $2,750 | $2,600 | $2,150 | $1,650 | $2,110 | $1,780 |
| 625E31510 PULL BOX REMOVED | 26 EACH | $100 | $152 | $200 | $75.00 | $225 | $100 | $202 | $167 |
| 625E32000 GROUND ROD | 36 EACH | $150 | $98.25 | $230 | $135 | $225 | $300 | $258 | $152 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,000 | $5,660 | $7,000 | $11,000 | $9,800 | $5,400 | $7,129 | $10,071 |
| 625E36000 PLASTIC CAUTION TAPE | 12,523 FT | $0.10 | $0.24 | $0.50 | $0.25 | $0.25 | $0.10 | $0.50 | $0.15 |
| 625E39520 PULL BOX CLEANED | 6 EACH | $100 | $158 | $70.00 | $25.00 | $225 | $55.00 | $202 | $203 |
| 614E12420 DETOUR SIGNING | 1 LS | $1,500 | $10,370 | $4,800 | $2,100 | $10,000 | $5,000 | $2,163 | $18,738 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $700 | $1,250 | $910 | $1,100 | $1,150 | $1,450 | $1,082 | $1,693 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1 WAY) | 14 EACH | $10.00 | $77.60 | $10.00 | $10.00 | $25.00 | $8.00 | $8.00 | $186 |
| 614E13350 OBJECT MARKER, ONE WAY | 14 EACH | $11.00 | $107 | $14.00 | $10.00 | $25.00 | $16.00 | $8.00 | $236 |
| 622E41000 PORTABLE BARRIER, 32" | 350 FT | $10.00 | $36.60 | $34.50 | $35.00 | $50.00 | $55.00 | $31.50 | $84.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $6,600 | $7,500 | $11,873 | $40,000 | $30,000 | $34,500 | $21,275 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,000 | $1,835 | $2,500 | $1,250 | $2,000 | $1,350 | $1,200 | $3,880 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $1,520 | $3,000 | $7,700 | $10,000 | $8,000 | $23,382 | $14,975 |
| 624E10000 MOBILIZATION | 1 LS | $1,000 | $14,125 | $20,000 | $40,000 | $40,000 | $84,000 | $40,000 | $33,625 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E13200 LIGHT TOWER, BBBB100 | 10 EACH | $15,450 | $155k | 17% |
| 625E13400 LIGHT TOWER, BBBBBB100 | 8 EACH | $15,500 | $124k | 13% |
| 625E29000 TRENCH | 12,523 FT | $6 | $75k | 8% |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 9 EACH | $8,300 | $75k | 8% |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 9 EACH | $8,000 | $72k | 8% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 11,600 FT | $5 | $58k | 6% |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 48 EACH | $1,150 | $55k | 6% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 3" | 1,034 FT | $35 | $36k | 4% |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 24 EACH | $1,150 | $28k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 3% |